Original source · versioned page text
Appendix F. Civil Engineering Report Part 2
Attached to the e-mail Retail Bus Type 5 & Type 2 & Op Works -Civil Eng Report Pt 2 MCU17/0572 & OPW17/0611.
The original of this document is very large (11.0 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Original PDF page 64, section 1. The text section number identifies this passage in the reader.
Puraceptor Class 1
Operation and
Maintenance Manual
Service Stations
Fuel Depots
Windfarms
Switchyards
Sub Stations
Power Stations
Industrial Locations
Contents
SPEL Puraceptor - How it works page 2
SPEL Puraceptor Maintenance page 3
SPEL Coalescer Units page 4
SPEL Auto Closure Device page 5
SPEL Oil Alert System page 6
Spare Parts List page 8
13 SPEL or 13 77 35
AUSTRALIA WIDE
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.