Appendix F. Civil Engineering Report Part 2

Attached to the e-mail Retail Bus Type 5 & Type 2 & Op Works -Civil Eng Report Pt 2 MCU17/0572 & OPW17/0611.

of 138

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (11.0 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Original PDF page 76, section 1. The text section number identifies this passage in the reader.

Maintenance
INSPECTION AND CLEANING                                         IMPORTANT
The regularity of inspections of the SPEL Ecoceptor             SPEL Environmental takes safety seriously and
is contingent on the features and properties of the             recommends that prior to the entry of any of its devices,
catchment area.                                                 that maintenance personnel undertake relevant safety
                                                                checks and use appropriate safety equipment. SPEL
SPEL recommends inspection of the Ecoceptor one                 devices are considered confined spaces and should
month after installation to determine the volume of             only be entered by appropriately trained and certified
trapped silt and pollutants.                                    personnel with the necessary safety equipment.
Information sourced can be useful in factoring the
frequency of on-going inspections or cleaning operations.
In the event of excessive rain or an oil spill, an inspection
is recommended immediately.
Ascertain silt depth and if build-up is evident, then a
vacuum-loader truck should be engaged for the cleaning
of the tank.
SPEL Ecoceptor cleaning procedure is simple, by simply
lifting the external lid (two persons may be required),
resting it securely in a safe manner and then inserting
suction hose into the chamber.
Ensure that the chamber is thoroughly cleaned of all
refuse and debris before accessing the chamber - if
required.
The chamber is cleaned by inserting the suction hose
through the manhole at ground level.
Always commence cleaning from the inlet side of the
chamber and ensure on completion of the cleaning
operation that the lid is secured to its normal position
(and locked if necessary) before departing the site.




                                                                                                                            3
Log in to download the original file

Appendix F. Civil Engineering Report Part 2.pdf · 11.0 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.