Appendix F. Civil Engineering Report Part 2

Attached to the e-mail Retail Bus Type 5 & Type 2 & Op Works -Civil Eng Report Pt 2 MCU17/0572 & OPW17/0611.

of 138

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (11.0 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Original PDF page 97, section 1. The text section number identifies this passage in the reader.

                                                             Working near
                                                              nbn cables          TM




nbn has partnered with Dial Before You Dig to give you a single point of contact to
get information about nbn underground services owned by nbn and other utility/service
provider in your area including communications, electricity, gas and other services. Contact
with underground power cables and gas services can result in serious injury to the worker, and
damage and costly repairs. You must familiarise yourself with all of the Referral Conditions
(meaning the referral conditions referred to in the DBYD Notice provided by nbn).



Practice safe work habits
Once the DBYD plans are reviewed, the Four P’s of Excavation should be adopted in conjunction with your safe
work practices (which must be compliant with the relevant state Electrical Safety Act and Safe Work Australia
“Excavation Work Code of Practice”, as a minimum) to ensure the risk of any contact with underground nbn
assets are minimised.




Plan: Plan your job         Pothole: Non-destructive     Protect: Protecting and      Proceed: Proceed only
ensuring the plans          potholing (i.e. hand         supporting the exposed       when the appropriate
received are current and    digging or hydro             nbn underground asset        planning, potholing and
apply to the work to be     excavation) should           is the responsibility of     protective measures are in
performed. Also check for   be used to positively        the worker. Exclusion        place.
any visual cues that may    locate nbn underground       zones for nbn assets are
indicate the presence of    assets with minimal risk     clearly stated in the plan
services not covered in     of contact and service       and appropriate controls
the DBYD plans.             damage.                      must be implemented to
                                                         ensure that encroachment
                                                         into the exclusion zone
                                                         by machinery or activities
                                                         with the potential to
                                                         damage the asset is
                                                         prevented.
Log in to download the original file

Appendix F. Civil Engineering Report Part 2.pdf · 11.0 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.