Appendix F. Civil Engineering Report Part 2

Attached to the e-mail Retail Bus Type 5 & Type 2 & Op Works -Civil Eng Report Pt 2 MCU17/0572 & OPW17/0611.

of 138

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (11.0 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Original PDF page 98, section 1. The text section number identifies this passage in the reader.

Working near nbn cables                                                                  TM




    Identify all electrical hazards,                              When using excavators and other                                   Workers and equipment must
    assess the risks and establish                                machinery, also check the location                                maintain safety exclusion zones
    control measures.                                             of overhead power lines.                                          around power lines.




Once all work is completed, the excavation should be re-instated with the same type of
excavated material unless specified by nbn. Please note:

• Construction Partners of nbn may require additional controls to be in place when performing
  excavation activities.

• The information contained within this pamphlet must be used in conjunction with other
  material supplied as part of this request for information to adequately control the risk of
  potential asset damage.




Contact
In the event of the nbnTM network facility damage
please call 1800 626 329

Disclaimer
This brochure is a guide only. It does not address all the matters you need to consider when working near our cables. You must
familiarise yourself with other material provided (including the Referral Conditions) and make your own inquiries as appropriate.
nbn will not be liable or responsible for any loss, damage or costs incurred as a result of reliance on this brochure.
This document is provided for information purposes only. This document is subject to the information classification set out on this
page. If no information classification has been included, this document must be treated as UNCLASSIFIED, SENSITIVE and must not
be disclosed other than with the consent of nbn co. The recipient (including third parties) must make and rely on their own inquiries
as to the currency, accuracy and completeness of the information contained herein and must not use this document other than with
the consent of nbn co. Copyright © 2017 nbn co limited. All rights reserved.
Log in to download the original file

Appendix F. Civil Engineering Report Part 2.pdf · 11.0 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.