Council archive · source document
35484 Approved Plans Ba · MCU21/0222.01
Plans and drawings: the text below has words only, no drawings.
Very large file (18.3 MB): may take a few minutes to open.
Original PDF page 18, section 1. The text section number identifies this passage in the reader.
KEY: NOTES:
FLOURESENT TUBE LIGHT INTERNAL WALL LIGHT 1. PROVIDE 3 PHASE SUPPLY FROM STREET. APPROVED WITH CONDITIONS
L S
LED STRIP LIGHTING STAIR WALL LIGHT 2. PLACE ALL LIGHT SWITCHES AT 1100mm AFFL. This is an Approved Building Works Document. Refer
DL
DIRECTIONAL LED STRIP E EXTERNAL WALL LIGHT
3. PLACE ALL POWEWR POINTS AND OUTLETS TO SUIT
to the Decision Notice for conditions of approval
LV
LV DOWNIGHT D CABINETRY AND/OR
UP/DOWN WALL LIGHT
FITTINGS. REMAINING POWER POINTS AND OUTLETS TO BE PERMIT No. 35484
LED DOWNLIGHT P POOL/POND LIGHT MOUNTED 300mm AFFL.
P
PENDANT LIGHT 4. PROVIDE SUPPLY TO A/C UNITS AS REQUIRED.
DATE 09/11/2023
EXHAUST FAN
G
LV GARDEN LIGHT ISSUED BY COASTAL BUILDING
MOTION SENSOR 5. PROVIDE SEPERATE CIRCUIT FOR FRIDGE.
U CERTIFICATIONS PTY LTD
RECESSED LED UP LIGHT
SD SMOKE DETECTOR 6. ENERGY EFFICIENT LIGHTING TO BE INSTALLED TO A MINIMUM
W OF 80% OF TOTAL FIXED LIGHTING POSITIONS. (BASED ON
POND LIGHT IMMERSED TD THERMAL DETECTOR NUMBER OF LIGHTS INSTALLED INTERNALLY & IN OUTDOOR
SP COVERED AREAS).
DIRECTIONAL SPOTLIGHT X SWITCH
7. SEE JOINERY DETAILS FOR LOCATION & EXTENT
CEILING FAN 2 2-WAY OF LED STRIP LIGHTING.
3 3-WAY
8. GARDEN LIGHTS TO BE ON MOTION SENSORS.
G
D DIMMER
9. GARDEN LIGHTS TO FUTURE DETAIL.
SWITCHWIRE
IN ACCORDANCE WITH COUNCIL DA REQUIREMENTS
- ALL OUTDOOR LIGHTS MUST HAVE A MAXIMUM OF 2700 K CORRELATED COLOUR TEMPERATURE
G
(CCT). ALL INDOOR LIGHTS MUST HAVE A MAXIMUM OF 3000 K CCT. ALL LIGHTING (INTERIOR AND
EXTERIOR) MUST AVOID THE USE OF HALOGEN, METAL HALIDE, OR FLUORESCENT LIGHTS.
- AMBER LED (590-610 NM) OR LOW PRESSURE SODIUM LIGHTING MUST BE USED AS A STANDARD. REFER TO COUNCIL NOTES
FOR EXTERNAL LIGHTINGDL
WARM WHITE IS TO BE USED ONLY WHERE COLOUR RENDITION IS REQUIRED. LED LIGHTS MUST NOT
CONTAIN SHORT WAVELENGTH BLUE LIGHT AND SUPPLIER SHOULD BE ASKED TO PROVIDE SPECTRAL
POWER CURVE OF REQUESTED LEDS TO PROVE THE ABSENCE OF SHORT WAVELENGTHS. BED 2
ENS BED 3
ENS ENS GUEST
- THE NUMBER AND WATTAGE OF LIGHTS MUST BE MINIMISED. G
xx
xx
xx
- ALL LIGHTS MUST BE RECESSED INTO STRUCTURES AND ROOF, AND DIRECTED AWAY FROM THE TURTLE LAWN
NESTING HABITAT.
ROBE
ROBE
x
x
- NO LIGHTING IS PERMITTED ON THE ROOF OF THE BUILDING. xx
x
ROBE
- ALL OUTDOOR LIGHTS, INCLUDING BALCONY LIGHTS, MUST BE TURNED OFF BETWEEN 8:00PM AND LIFT xx xx
E
SUNRISE DURING TURTLE NESTING AND HATCHING SEASON (OCTOBER – MAY).
2
x
CONFIRM LIFT LIGHTING
WITH LIFT MANUFACTURER
G
- EXTERNAL FEATURE LIGHTING TO THE BUILDING MUST BE POSITIONED BELOW 10 METRES IN HEIGHT AND
x
TURNED OFF BETWEEN 8:00 PM AND SUNRISE DURING TURTLE NESTING AND HATCHING SEASON E xx x
(OCTOBER – MAY). 22
- NO UPWARD LIGHTS OR VERTICAL ILLUMINATION OF THE BUILDING, VEGETATION OR OTHER STRUCTURES
ENTRY FAMILY
USING LIGHTING THAT SHINES INTO THE SKY TO BE USED.
UP
VOID
- WHERE LIGHTING IS REQUIRED FOR SAFETY PURPOSES (INCLUDING ALL CORRIDORS ABOVE GROUND G
LEVEL, STAIRWELLS, ENTRY POINTS ETC.), THE LIGHTING OF THESE AREAS MUST BE ACTIVATED BY
PROXIMITY SENSORS OR MOTION DETECTORS WITH AN ASSOCIATED DEACTIVATION OF THE LIGHTING STAIRS
STAIR LIGHTING TBC WITH INTERIOR
DESIGNERS & HOME AUTOMATION
AFTER NO MORE THAN 10 MINUTES DURING TURTLE NESTING AND HATCHING SEASON (OCTOBER – MAY). CONSULTANT
FOR LIGHTING IN OTHER AREAS, TIMERS, PROXIMITY OR MOTION ACTIVATED LIGHT SENSORS MUST BE USED
WHEREVER POSSIBLE. ALL FEATURE LIGHTING TBC WITH INTERIOR
DESIGNERS & HOME AUTOMATION
G
CONSULTANT
TERRACE
- NO DECORATIVE OUTDOOR LIGHTING IS TO BE FITTED TO THE BUILDINGS, OPEN SPACE OR RECREATION 2
x xx
AREAS (E.G. FAIRY/CHRISTMAS LIGHTS) DURING NESTING AND HATCHING SEASON (OCTOBER – MAY). E
xx
3
E x x
- POOL LIGHTING MUST BE SWITCHED OFF AFTER 8:00PM DURING NESTING AND HATCHING SEASON
(OCTOBER – MAY).
WL1
- ALL EXTERIOR LIGHTING MUST BE SHIELDED BY A MINIMUM OF 30CM VERTICAL SHIELDING.
xx
3
BED 1
HERS
DRIVEWAY GARAGE
xx
3
LAUNDRY
WL1
2
xxx x
x E
E
x ENSUITE
x
HIS
E E
STORE DRYING
WL2 WL2
DOG YARD/SERVICES
CLIENT: Maxine Horne PROJECT: BEACHES
www.chriscloutdesign.com.au GENERAL NOTES:
Use written dimensions only. DO NOT scale drawings. Contractors SITE ADDRESS: BEACHES NOOSA 7/56 David Low Way, SUNRISE BEACH QLD 4567
A: OFFICE 1/20 DUKE STREET, to verify all dimensions on site prior to commencing works. Site
SUNSHINE BEACH, QLD 4567, location in accordance with engineers details. These drawings are to DRAWING TITLE: GROUND LIGHTING PLAN
be read in conjunction with engineers design and details, the
E: [email protected] DATE: 31-08-23 SCALE: 1 : 100 @ A2 DRAWN BY: C.CLOUT
P: (07) 54748 107 BSA LICENCE: 1127508
accompanying building specification and schedule of finishes. If in
doubt, please request clarification. DO NOT ASSUME. ISSUE: PRELIMINARY WORKING DRAWINGS
W7.1
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
35484 APPROVED PLANS BA.pdfRelated documentApplication case desk ↗
About this file
- File size
- 18.3 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.