Council archive · source document
SUPERSEDED - Decision Notice - Concurrence Agency - EPA [As Published] · 142008.383
2008/383 Page 12 of 15 [OCR of page images] 2008/383 Concurrence Agency Response EPA Permit number: _IPCC01117608 Monitoring 33, 34. 35. 36. 37. The Sunshine Coast Regional Council is to develop a Sand Shifting Management Plan which details the operational and monitoring strategies consistent with the conditions of this approval. The Plan shall include a monitoring strategy for ensuring that the pumping regime is consistent with the natural net littoral drift rates.. As a minimum, the plan should Include monthly monitoting of the vagetation line. Details of the quantity of sand recycled are to be sent to the Environmental Protection Agency on a monthly basis. Within 12 months of establishment and at 5 yearly intervals or sooner if the Environmental Protection Agency has reasonable concerns that the local or regional natural coastal processes are being adversely affected, a program of research must be undertaken to determine the long-term impacts of the sand Shifting operation on the depositional characteristics of Noosa Estuary. In particular, the Environmental Protection Agency seeks to determine whether the operation of the sand shifting facility within the active system undermines the supply of sediment to the estuary. The Environmental Protection Agency must be consulted in the development of the research program. Recording of any faunal by-catch associated with the sand shifting activity must be undertaken on a daily basis during days of operation. Records of by-catch must be provided to the Environmental Protection Agency bi-annually for the first year of operation. Beach and dune profiling is to be undertaken every 6 months for the first 5 years and annually thereafter from the sand extraction area at Noosa Spit Beach to the sand deposition area at Noosa Main Beach. One profiling event must be a detailed survey (survey intervals of <50m) and include profiling of the surf zone (minimum 5m water depth). The other profiling event must include 4 profiles of the beach zone (two. at Noosa Spit Beach and two at Noosa Main Beach). Both surveys must be provided to the Environmental Protection Agency upon completion. Page 6 of 7 Environmental Protection Agency Page 12 of 15
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
SUPERSEDED - Decision Notice - Concurrence Agency - EPA [As Published]Related documentApplication case desk ↗
About this file
- File size
- 494 KB (small file)
- File type
No other editions are linked here.