Original source · versioned page text
Attachment B - Code Compliance Assessment
Performance outcomes Acceptable Outcomes Comments
drawings.
AO2.2
The change of grades in driveways and
ramps is in accordance with Council’s
Standard Drawings.
PO3 AO3.1 Complies with Acceptable outcome.
The number of driveways across pedestrian Design of multi-tenanted developments The proposed use is located within an
footpaths is minimised. include shared driveways and parking areas. existing Building Unit Plan.
These services already exist.
AO3.2
Driveways are located so they abut existing
driveways of adjoining development where
practicable and reciprocal easements are
created to reduce the sealed driveway
width.
PO4 AO4 Complies with Acceptable outcome.
Vehicular access does not adversely impact Footpath and kerb crossings are located The proposed use is located within an
on the capacity, operations and clear of existing stormwater inlet structures, existing Building Unit Plan.
maintenance of the existing infrastructure. water and sewerage infrastructure fittings, These services already exist.
any other exiting utility infrastructure,
existing landscaping and vegetation.
Urban Planners Queensland
[email protected] | upqld.com.au | (07) 3106 3221
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.