Original source · versioned page text
Attachment B - Code Compliance Assessment
Performance outcomes Acceptable Outcomes Comments
4. complement the future planned
character of the area; and Editor's note— Refer to Figure AP3-
5. avoid development within the 11A and Figure AP3-11B for outcomes for car
Walter Hay Drive, Eenie Creek parking in centres.
Road and Holts
Road frontage setbacks. AO8.3
Where practicable vehicle access is from
rear laneways.
PO9 AO9 Complies with Acceptable outcome.
On-site car parking spaces are identified Car parking spaces are provided for people The proposed use is located within an
and reserved for people with disabilities. with disabilities at the rate specified in the existing Building Unit Plan.
current Australian Standards for Parking These services already exist.
Facilities.
PO10 AO10 Complies with Acceptable outcome.
Access and egress points do not impact on Vehicle manoeuvring areas are provided in The proposed use is located within an
the safety and operations of the road accordance with the current Australian existing Building Unit Plan.
system. Standards Australian Standards for Parking These services already exist.
Facilities so vehicles enter and leave
the site in a forward gear, excluding dual
occupancy or detached dwellings on local
roads.
PO11 AO11 Complies with Acceptable outcome.
Parking areas are designed to At locations where pedestrian and vehicle The proposed use is located within an
conflicts are likely to occur: existing Building Unit Plan.
These services already exist.
Urban Planners Queensland
[email protected] | upqld.com.au | (07) 3106 3221
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.