     1. Sediment fencing downstream of the work areas within the site to prevent sediment from leaving the
        disturbed construction area.

     2. A shakedown entry installed at the access to the proposed development area to minimise sediment being
        transported to and from the site.

     3. Providing sediment traps and fabric filters to existing inlet pits to prevent sediment entering the downstream
        network.

     4. Ensuring any stockpiles and construction materials are contained with an upstream berm to divert surface
        flows and sediment fencing downstream of these areas.

     5. Ensuring any loose material tracked onto roads by construction vehicles is swept and removed from the road
        before the end of the day.




Project number 20210216                                                                                        Page 10 of 13
File RECOR Preliminary Stormwater Management Report - 20210216.docx, 2022-02-01
Revision 0
P +61 7 5211 1003                          A 37 Mary St, Noosaville Qld 4566      E [email protected]    recorconsulting.com
Log in to download the original file

Appendix C - Stormwater Management Report.pdf · 2.4 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.