 CONCLUSION
This Concept Stormwater Management Report has outlined how the stormwater run-off from the site is to be
managed to comply with the relevant requirements to minimise any adverse impacts to the downstream catchments.

     •    The legal point of discharge for the proposed development is the existing inlet at the north-eastern corner
          of the site.

     •    Both stormwater quality and quantity for the operational phase of the proposed development have
          previously been managed as part of the subdivision creating the individual lots (RAL2007/165). The existing
          end of line treatment including detention basin and bioretention basin achieve the stormwater objectives
          for the proposed development, therefore no additional management is required for the proposed
          development.

     •    During construction, erosion and sediment control measures in accordance with best practice standards are
          to be implemented to minimise potential contaminants impacting the downstream receiving environment.
          An erosion and sediment control plan shall be developed as part of a submission for Operational Works
          approvals.

     •    The proposed stormwater solution is considered to minimise any adverse impacts to the downstream
          environment arising from the stormwater run-off while also meeting the stormwater quality targets required
          for the development.




Project number 20210216                                                                                        Page 11 of 13
File RECOR Preliminary Stormwater Management Report - 20210216.docx, 2022-02-01
Revision 0
P +61 7 5211 1003                          A 37 Mary St, Noosaville Qld 4566      E [email protected]    recorconsulting.com
Log in to download the original file

Appendix C - Stormwater Management Report.pdf · 2.4 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.