Review of Noosa Oyster Ecosystem Restoration Project
Key Issues Report — Noosa Shire Council Confidential and subject to legal privilege
18 October 2022
1 Overall Finding 2.4 Currency of this Report
Our (Norton Rose Fulbright Australia}, review found that the process adopted by This Report is dated 18 October 2022 and reflects the findings from the review we
Council was generally consistent with its applicable policies and statutory have conducted as at 5.00pm (Brisbane time} on that date in respect of the Project.
requirements and identified no major (red flag) issues. Vve identified a small Unless specifically requested by Council, this Report will not be updated after that
number of areas of improvement and recommendations for Council's consideration time in connection with any matter in or which affects the Report. Please contact
which are outlined in the Key Findings of this Report. us if there is any aspect of the Report you would like us to update or expand on
Risk categories.
2 How was this Report prepared? We have placed each of our key findings in one of the following 3 risk categories:
2.1 Overall Finding
22 Who was this Report prepared for?
Ve have prepared this Report atthe request of Noosa Shire Council (Council) in ap ; ; :
connection with the procurement review for the Noosa River Oyster Ecosystem SCpacoheieee cerepgetepel ve. fraer a re crece ie
Restoration Project (Project) and the Alliance and Funding Agreement dated 25 action the short or medium require any action inthe
July 2019 between The Nature Conservancy Limited ABN 83 243 328 398 (TNC) term is recommended short term
and Council (Agreement).
Reliance on this Report is limited ta Council (see section 2.19 of Schedule 2}, and 25 Scope and limitations
to the assumptions and limitations detailed in this Report.
oo This Report should be read in light of the scope of our review set outin Schedule 2
2.3 Materiality Criteria and the reliance information, limitations, qualifications and assumptions set out in
this Report. In particular, it should be noted that our scope was not equivalent to a
This Report has been prepared on an “exceptions only" basis. It does not seek to legal due diligence process and our observations are based solely on the
provide an exhaustive review of all issues arising out of the Project or the Review information listed in Annexure A.
Materials. Instead, it highlights issues that, in our opinion, Council oughtto
consider and address in similar projects, including in respect of the application of Dated: 18 October 2022
Council grants.
Our review has considered the following two phases: OS
1. Phase One: Project initiation (process undertaken by Council to engage TNC :
and enter into the Agreement); and
2. Phase Two: Project delivery. Ren Niemann, Partner
In respect of the above, we note a third phase of the Projectis current being Caeanionbe hates Hattoritass:-Eulbright austoala
carried out, being the finalisation of the Project. As this phase is in progress, it is
beyond the scope of our review for the purposes of this Report.
AP AC #302981 652-3 3 © Norton Rose Fulbright Australia
Page 50 of 113See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.