Skip to the record
The first. The best. The only NoosaWatch™.

Original source · versioned page text

2022-10-24 General Committee Meeting Agenda

of 113

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (16.5 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

GENERAL COMMITTEE MEETING AGENDA                                                  24 OCTOBER 2022


19.   Following construction, certification must be supplied to Council by an RPEQ specialising in
      geotechnical engineering that the works have been constructed in accordance with the
      approved design.
20.   A dilapidation survey shall be carried out of all adjacent properties and structures before the
      commencement of construction of the proposed development on the site.
21.   Due to the risk of instability on the existing dune slope and the potential for settlement of
      loose sand on the adjacent properties, vibrations must be kept to a minimum and must be
      monitored during the construction of the development. Driven piles (both sheet piles and pile
      footings) are not permitted on the site.
22.   Landscaping at the rear of the property and the crest of the existing dune slope shall be
      limited to a maximum surcharge of 5kPa unless a site-specific slope stability analysis is
      carried out to demonstrate that higher loads are acceptable.
23.   Under no circumstances shall building materials be temporarily stockpiled in the area of the
      crest of the existing dune slope or on the slope.
24.   Discharge of concentrated stormwater flows onto the dune slope must be avoided, and under
      no circumstances will subsurface disposal of water be permitted using infiltration pits.
25.   Stormwater runoff from gutters, down-pipes, driveways, and paved areas must be collected
      and directed by pipes into the Council stormwater system along Seaview Terrace.
26.   The existing dune slope and any areas disturbed by the construction of the proposed
      development shall be revegetated as soon as possible to reduce the potential for erosion.
      Earthworks
27.   Earthworks required on-site must be carried out in accordance with Council’s Planning
      Scheme Policy PSP6 Engineering Design Standards, so as not to cause the additional
      ponding of water on any adjoining lands or concentrate or direct overland flow on to an
      adjoining property
28.   All earthworks carried out on site must not affect the structural stability of the adjoining lands
      and/or buildings and/or structures and/or services
29.   All earthworks and associated retaining structures/batters, both above and below ground
      level, both temporary and permanent, must be wholly contained within the subject site unless
      written permission from the respective landowner(s) is provided to Council.
30.   All earthworks must be undertaken in accordance with the provisions of Australian Standard
      AS3798 “Guidelines on Earthworks for Commercial and Residential Developments”.
      Significant Weather Events
31.   Should a significant weather event occur which results in substantial erosion within the site,
      and undermines the structure and/or renders the Detached House uninhabitable, the owner
      must:
      a.    Immediately secure the perimeter of the property to prevent unauthorised access and
            then undertake necessary works upon the land to make the Detached House safe and
            suitable for habitation in a timely manner.
               I.      Any work proposed must be designed to ensure that the work will not cause
                       adverse impacts on other lands or on coastal processes.
               II.     Rock, concrete and like hard materials must not be used for the construction
                       of beach protection works.
              III.     Any work proposed to be carried out must be undertaken in accordance with
                       a Development Permit for Operational Works.


                                                                                        Page 8 of 113
Log in to download the original file

2022-10-24 General Committee Meeting Agenda(PDF, 16MB).pdf · 16.5 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.