GENERAL COMMITTEE MEETING AGENDA 24 OCTOBER 2022
b. or remove the Detached House and all associated structures including the footpath
crossover and make the land safe at no cost to the Council.
Site Access and Driveways
32. A sealed access driveway must be provided from the existing formation in Seaview Terrace
to all parking and manoeuvring areas of the development. The works must be undertaken in
accordance with an Operational Works approval and must include a driveway located
generally in accordance with the approved plans.
Stormwater Drainage
33. Stormwater runoff from the development must be collected and disposed of in accordance
with the recommendations of the site specific geotechnical report. Stormwater runoff from
gutters, down-pipes, driveways, and paved areas must be collected and directed to Council
stormwater drainage system along Seaview Terrace. The works must be undertaken in
accordance with an Operational Works approval.
34. Prior to the commencement of the use a certificate must be issued by an RPEQ certifying
that the stormwater drainage system has been constructed in accordance with the conditions
of this permit.
Easements
35. Unless otherwise agreed in writing by the relevant service provider, any public or third party
infrastructure located on the subject site must be placed within an easement registered
against the title of the property.
36. All easements must be designed in accordance with the planning scheme and granted at no
cost to the Grantee. Where the Grantee is Council or a service authority, the easement
documentation must be in accordance with the Grantee’s standard easement terms. Draft
easement documentation must be submitted to Council for endorsement.
37. All works must be kept clear of any existing or proposed easements on the subject land,
unless agreed otherwise in writing by the Grantee.
Damage to Services and Assets
38. Any damage caused to existing services and assets as a result of the development works
must be repaired at no cost to the asset owner at the following times:
38.1. where the damage would cause a hazard to pedestrian or vehicle safety, immediately;
38.2. where otherwise, upon completion of the works associated with the development.
Any repair work which proposes to alter the alignment or level of existing services and assets
must first be referred to the relevant service authority for approval.
39. A temporary fence must be constructed along the site’s boundary to the adjoining park
reserve to restrict access, with signage erected that ensures that no access is allowed’.
B. Note the report is provided in accordance with Section 63(5) of the Planning Act 2016.
REPORT
1. PROPOSAL
The proposal seeks to develop a new dwelling house on the subject site and demolish the existing
dwelling house. The subject site is located in the Coastal Protection Overlay and the Landslide
Hazard Overlay. The proposed dwelling house is to be located over three levels and includes a
rooftop terrace.
The lower level comprises a bedroom, two bathrooms, a wellness room, study, laundry, storage
areas and a lift to the ground floor.
Page 9 of 113
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.