Skip to the record
Beware of cheap imitations.

Original source · versioned page text

2022-10-24 General Committee Meeting Agenda

of 113

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (16.5 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

GENERAL COMMITTEE MEETING AGENDA   24 OCTOBER 2022




                                      Page 96 of 113

10684          IS               Infrastructure Planning, |Graduate Engineer      Temporary Full Time for 3 years         Purpose-to assist with the coordination and management of infrastructure projects in the capital works
                                Design and Delivery     Projects                 lending 9/5/23, extension granted to    programme.
                                                                                 30/6/23, further extension required to  {Endorsed by ET 17/11/20. Approved by Council OM 17/12/20. Extension granted to 30/6/23 Council
                                                                                 30/6/25.                               Special Meeting 28/6/22. Further extension required to 30/6/25.
                                                                                                                        Salary provision for this position exists within the 22/23 capital budget.
10685          IS               Infrastructure Planning, |Graduate Engineer      ‘Temporary Full Time (3 years, 6/9/21-  |Purpose-to assist with the management of infrastructure projects in the capital works programme.
                                Design and Delivery     Projects                 6/9/24), further extension required to  |Endorsed by ET 17/11/20.
                                                                                 30/6/25.                               Approved by Council OM 17/12/20. Further extension required to 30/6/25.
                                                                                                                        Salary provision for this position exists within the 22/23 capital budget.
10686          IS               Infrastructure Planning, {Infrastructure         ‘Temporary Full Time (3 years, ending   |Purpose-to provide communications and consultation support for Infrastructure projects in the works
                                Design and Delivery     Communications and       |10/4/24), extended to 30/6/25.         programme.
                                                        Consultation Officer                                             Endorsed by ET 17/11/20. Approved by Council OM 17/12/20. Extension granted to 30/6/25 Council
                                                                                                                        Special Meeting 30/6/21.
                                                                                                                        Salary provision for this position exists within the 22/23 capital budget.
10718          Is               Infrastructure Planning, |Project Manager        Temporary Full Time (3 yrs, ending      Purpose-to assist with the management of infrastructure projects in the capital works programme.
                                Design and Delivery                              30/6/25).                               Endorsed by ET, approved by Council OM 17/2/22.
                                                                                                                        Salary provision for this position exists within the 2022/23 capital works budget.
10717          IS               Infrastructure Planning, |Project Manager        Temporary full time (3 yrs, ending      Purpose-to assist with the management of infrastructure projects in the capital works programme.
                                Design and Delivery                              30/6/25).                               Endorsed by ET, approved by Council OM 17/2/22.
                                                                                                                        Salary provision for this position exists within the 2022/23 capital works budget.
10719          Is               Infrastructure Planning, |Project Officer        Temporary full time (3 yrs, ending      Purpose-to assist with the management of infrastructure projects in the capital works programme.
                                Design and Delivery                              30/6/25).                               Endorsed by ET, approved by Council OM 17/2/22.
                                                                                                                        Salary provision for this position exists within the 2022/23 capital works budget.
10631          IS               Asset Management        Asset Technical Officer, Temporary Full Time (3 years, 16/9/19-]Purpose-to ensure alignment of engineering and accounting data and sufficient accurate information      Convert to permanent
                                                        Asset Data               2/9/22), extension granted to 10/5/23, |Approved Council Special Meeting 28/6/19. Extension granted to 10/5/23 OM 17/2/22 (note-position       full time
                                                        Improvement Project      —_|further extension granted to 30/6/23. _|vacated, new appointment made, additional term required to attract applicant). Extension granted to
                                                        renamed to Co-                                                  30/6/23 Council Special Meeting 28/6/22.
                                                        ordinator Asset Systems                                         Salary provision for this position exists within the 22/23 capital budget.

10640          IS               Buildings and Facilities |Electrical apprentice  ‘Temporary Full Time (4 years 30/9/19- |Purpose-to improve efficiency and effectiveness of branch operations and WFP requirements.
                                                                                 29/9/23).                              Approved Council Special Meeting 28/6/19.
                                                                                                                        Salary for this position exists within the 22/23 operating budget.
10699          IS               Director's Office       Aministration Officer    Temporary Full Time (3 yrs, ending      Purpose-to support increased adminstraitive workloads assocated with the increased capital works
                                                                                 28/6/24).                               programme.
                                                                                                                        Approved Council Special Meeting 30/6/21.
                                                                                                                        ‘Salary provision for this position exists within the 22/23 capital budget.
10739          IS               Director's Office       Disaster Resilience      ‘Temporary Full Time (9/5/22-3/5/24)    __|Purpose-to support projects to strengthen Noosa's resilience to natural disasters.
                                                        Officer                                                         Approved by ET, approved by Council Special Meeting 28/6/22.
                                                                                                                        Salary for this position from the Qld disaster resilience funding grant.
10605         Corp S            Director's Office       Special Projects         ‘Temporary Full Time (3 years, 1/10/18  4Purpose-to facilitate the delivery of Council's CiAnywhere Enterprise Budgeting system and to meet to Convert to permanent
                                                        Advisor/Officer          30/09/21), extension granted to         meet project demands. Filled under an internal secondment arrangement by Financial Accountant.         full time
                                                                                 3/12/21, further extension granted to  {Originally approved by the CEO for an initial 18 month period. Term extended by 3 years to 3/12/21
                                                                                 3/12/24.                               Council OM 20/12/18. Extension granted to 3/12/24 Council Special Meeting 30/6/21.
                                                                                                                        Salary provision for this position exists within the 22/23 capital budget.

10617         Corp S            ICT                     Project Officer,         ‘Temporary Full Time (2 yrs, 9/12/19-   |Purpose-to provide support the implementation of the new Property and Rating system.                  Convert to permanent
                                                        renamed ICT System       |10/12/21), extension granted to to    Approved Council OM 9/4/19.                                                                             full time
                                                        Analyst                  10/12/24.                               Internal secondment arrangement Project Officer P&C Systems.
                                                                                                                         Extension granted to 10/12/24 Council Special Meeting 30/6/21.
                                                                                                                        Salary provision for this position exists within the 22/23 capital budget.

                                                                                                                                         Page 96 of 113
Log in to download the original file

2022-10-24 General Committee Meeting Agenda(PDF, 16MB).pdf · 16.5 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.