Skip to the record
Beware of cheap imitations.

Original source · versioned page text

RA6-N Response with conditions 2005-16658 SRA (approved plan version)

Attached to the e-mail SARA Referral agency response with conditions - MCU20/0027 & RAL20/0004.

of 7
                                                                                                    2005-16658 SRA




Attachment 1—Referral agency conditions
(Under section 56(1)(b)(i) of the Planning Act 2016 the following conditions must be attached to any development
approval relating to this application) (Copies of the plans and specifications referenced below are found at
Attachment 5)


 No.     Conditions                                                                     Condition timing
 Development Permit - Material Change of Use (Commercial Business Type 2 Medical)
 Schedule 10, Part 9, Division 4, Subdivision 2, Table 4 (Planning Regulation 2017)—The chief
 executive administering the Planning Act 2016 nominates the Director-General of the Department of
 Transport and Main Roads to be the enforcement authority for the development to which this
 development approval relates for the administration and enforcement of any matter relating to the
 following condition(s):
 1.      (a) The development must be in accordance with the Site Based                  (a) At all times.
             Stormwater Management Plan prepared by Empire Engineering
             dated 24 March 2020, Report Reference Job SC-8407 and
             revision B, in particular:

                   to detain stormwater flows on site via a 60,000L storage
                    volume and discharge at a mitigated rate to Noosa Shire
                    Council's existing stormwater infrastructure network.

         (b) RPEQ certification (with supporting hydraulic documentation)               (b) Prior to the
             must be provided to the District Director (North Cost District) via            commencement of
             [email protected] within the Department of                       use.
             Transport and Main Roads, confirming that the development
             has been designed and constructed in accordance with part (a)
             of this condition.




 State Assessment and Referral Agency                                                                   Page 3 of 7

Log in to download the original (RA6-N Response with conditions 2005-16658 SRA (approved plan version).pdf)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.