Part 3 Specific outcomes and probable solutions
 Specific outcome                                 A probable solution                                                   Comment
                                                   Character and amenity (generally)—prescribed tidal work in a canal
 1.1 Prescribed tidal work in a canal and         The design and construction of the prescribed tidal work is        Not applicable
 for a private purpose is compatible              consistent with the following standards—
 with its location, having regard to the          (a) subject to paragraph (c), prescribed tidal work does not
 following—                                       extend past the side boundary or extended side boundary of the
 (a) the character and amenity of the             lot connected to the work;
 work’s immediate surroundings                    (b) subject to paragraph (c), prescribed tidal work is not roofed;
 and the locality within which the                (c) if a relevant planning scheme standard is more stringent than
 work is located;                                 the standard mentioned in paragraph (a) or (b)—the relevant
 (b) if the relevant planning scheme              planning scheme standard, to the extent it is more stringent
 states the desired character or                  than the standard mentioned in paragraph (a) or (b); (d) any
 amenity for the work’s                           other relevant planning scheme standard that is not inconsistent
 immediate surroundings or the                    with the standards mentioned in paragraphs (a) to (c).
 locality within which the work
 is located—the stated desired
 character or amenity.
 1.2 Prescribed tidal work in a canal and for a   The design and construction of the prescribed tidal work is           Not applicable
 non-private purpose is compatible with its       consistent with the following standards—
 location, having regard to the following—        (a) subject to paragraph (c), prescribed tidal work used for a
 (a) the character and amenity of the work’s      commercial purpose does not extend past the side boundary or
 immediate surroundings and the locality within   extended side boundary of the lot connected to the
 which the work is located;                       work; (b) subject to paragraph (c), prescribed tidal work is not
 (b) if the relevant planning scheme states the   roofed unless it is the main access to land;
 desired character or amenity for the work’s      (c) if a relevant planning scheme standard is more stringent than
 immediate surroundings or the locality within    the standard mentioned in paragraph (a) or (b)—the relevant
 which the work is located—the stated desired     planning scheme standard, to the extent it is more stringent than
 character or amenity.                            the standard stated in paragraph (a) or (b); (d) any other relevant
                                                  planning scheme standard that is not inconsistent with the
                                                  standards mentioned in paragraphs (a) to (c).




                                                                                                                                         1
Coastal Protection and Management Regulation 2003 – Schedule 4A – IDAS code for the development of prescribed tidal work
Log in to download the original file

Enclosure 4 - Schedule 4a.pdf · 415 KB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

Full text of the other 24 pages

Page 2

                                                 Character and amenity (generally)—prescribed tidal work not in a canal
 2.1 Prescribed tidal work not in a canal and for The design and construction of the prescribed tidal work is         The proposed work is not for a private purpose.
 a private purpose is compatible with its         consistent with the following standards—
 location, having regard to the following—        (a) subject to paragraph (e), prescribed tidal work does not
 (a) the character and amenity of the work’s      extend past the side boundary or extended side boundary of the
 immediate surroundings and the locality within   lot connected to the work;
 which the work is located;                       (b) subject to paragraph (e), prescribed tidal work is the only
 (b) if the relevant planning scheme states the   work of its type along the edge of the tidal water fronting the lot
 desired character or amenity for the work’s      connected to the work;
 immediate surroundings or the locality within    (c) subject to paragraph (e), prescribed tidal work that is a
 which the work is located—the stated desired     boardwalk or independent deck is not roofed;
                                                  (d) subject to paragraph (e), prescribed tidal work other than a
                                                  boardwalk or deck is not roofed unless it is the main access to
                                                  land;
                                                  (e) if a relevant planning scheme standard is more stringent than
                                                  the standard mentioned in paragraph (a), (b), (c) or (d)—the
                                                  relevant planning scheme standard, to the extent it is more
                                                  stringent than the standard mentioned in paragraph (a), (b), (c)
                                                  or (d);
                                                  (f) any other relevant planning scheme standard that is not
                                                  inconsistent with the standards mentioned in paragraphs (a) to
                                                  (e).
 2.2 Prescribed tidal work not in a canal and for The design and construction of the prescribed tidal work is         The proposed work is compatible with is location,
 a non-private purpose is compatible with its     consistent with the following standards—                            being the reinstatement of previously naturally-
 location, having regard to the following—        (a) subject to paragraph (c), prescribed tidal work used for a      occurring habitat.
 (a) the character and amenity of the work’s      commercial purpose does not extend past the side boundary or
 immediate surroundings and the locality within   extended side boundary of the lot connected to the work;
 which the work is located;                       (b) subject to paragraph (c), prescribed tidal work used for a
 (b) if the relevant planning scheme states the   commercial purpose is not roofed unless it is the main access to
 desired character or amenity for the work’s      land;
 immediate surroundings or the locality within    (c) if a relevant planning scheme standard is more stringent than
 which the work is located—the stated desired     the standard mentioned in paragraph (a) or (b)—the relevant
 character or amenity.                            planning scheme standard, to the extent the standard is more
                                                  stringent than the standard mentioned in paragraph (a) or (b);
                                                  (d) any other relevant planning scheme standard that is not
                                                  inconsistent with the standards mentioned in paragraphs (a) to
                                                  (c).




                                                                                                                                                                          2
Coastal Protection and Management Regulation 2003 – Schedule 4A – IDAS code for the development of prescribed tidal work

Page 3

                                                                Character and amenity (height, scale and size)
 3.1 Prescribed tidal work is of a height, scale     The height, scale and size of the prescribed tidal work is          The proposed work considers the
 and size to ensure the work is compatible with      consistent with each relevant planning scheme standard.                 -   Height, being located relative to the local
 the character and amenity of its location,                                                                                      tidal planes in each specific location.
 having regard to the following—                                                                                             -   Scale & Size, being a significantly lower area
 (a) the height, scale and size of the natural                                                                                   than the historically present oyster reef
 features of the work’s immediate surroundings                                                                                   populations, however expected to naturally
 and the locality within which the work is                                                                                       expand over time in areas where they are
 located;                                                                                                                        successfully established (and as a result of
 (b) the height, scale and size of the existing                                                                                  any future stages).
 buildings or other structures in the work’s
 immediate surroundings and the locality within
 which the work is located;
 (c) if the relevant planning scheme states the
 desired height, scale or size of buildings or
 other structures in the work’s immediate
 surroundings or the locality within which the
 work is located—the stated desired height,
 scale or size.
                                                                 Character and amenity (materials and colours)
 4.1 The materials used for, and the colours of,     The materials used for, and colours of, the prescribed tidal work   The proposed work is within natural areas of the
 prescribed tidal work are compatible with the       are consistent with each relevant planning scheme standard.         Noosa River and the Noosa River Fish Habitat Area.
 character and amenity of the work’s location,                                                                           The oyster shell used is locally sourced (from Moreton
 having regard to the following—                                                                                         Island and boiled in accordance with biosecurity
 (a) the natural features of the work’s                                                                                  principals) and is the most suitable material to act as a
 immediate surroundings and the locality within                                                                          substrate for recruiting oysters.
 which the work is located;
 (b) the existing buildings or other structures in                                                                       Other materials used to provide stability in the interim
 the work’s immediate surroundings and the                                                                               as reefs become established are coir, Manilla rope.and
 locality within which the work is located;                                                                              timber. All materials are biodegradable and suitable
 (c) if the relevant planning scheme states the                                                                          for the environment.
 desired materials to be used for, or desired
 colours of, buildings or other structures in
 the work’s immediate surroundings or the
 locality within which the work is located—the
 stated desired materials or colours.




                                                                                                                                                                                     3
Coastal Protection and Management Regulation 2003 – Schedule 4A – IDAS code for the development of prescribed tidal work

Page 4

                                                                                        Lighting
 5.1 Lighting, other than an aid to navigation,       The lighting for the prescribed tidal work, other than an aid to       Not applicable
 for prescribed tidal work is installed in a way to   navigation, is consistent with the following standards—
 ensure the security and safe use of the work         (a) subject to paragraph (c), lighting for prescribed tidal work is
 without causing significant adverse effects on       hooded and directed downwards; (b) subject to paragraph (c),
 the amenity of the locality within which the         each lighting standard, to the extent relevant;
 work is located.                                     (c) if a relevant planning scheme standard is more stringent than
                                                      the standard mentioned in paragraph (a) or (b)—the relevant
                                                      planning scheme standard, to the extent the standard is more
                                                      stringent than the standard mentioned in paragraph (a) or (b);
                                                      (d) any other relevant planning scheme standard that is not
                                                      inconsistent with the standards mentioned in paragraphs (a) to
                                                      (c).
                                                                                        Signage
 6.1 A sign erected or otherwise placed in            A sign erected or otherwise placed in position for prescribed tidal    No signage.
 position for prescribed tidal work, other than a     work, other than a sign erected or placed for safety
 sign erected or placed for safety reasons or         reasons or under an Act, is consistent
 under an Act—                                        with the following standards—
 (a) is compatible with the character and             (a) subject to paragraph (c), a sign erected or placed in position
 amenity of the work’s immediate surroundings         for identifying prescribed tidal work, or the owner of the work, is
 and the locality within which the work is            the only sign erected or placed in position for identifying the work
 located; and (b) is not a dominant feature of        or owner;
 the work, unless the dominance is for safety         (b) subject to paragraph (c), a sign erected or otherwise placed
 reasons.                                             in position for prescribed tidal work is integrated into the design
                                                      and construction of the work;
                                                      (c) if a relevant planning scheme standard is more stringent than
                                                      the standard mentioned in paragraph (a)—the relevant planning
                                                      scheme standard, to the extent it is more stringent than the
                                                      standard mentioned in paragraph (a);
                                                      (d) any other relevant planning scheme standard that is not
                                                      inconsistent with the standards mentioned in paragraphs (a), (b)
                                                      and (c).




                                                                                                                                              4
Coastal Protection and Management Regulation 2003 – Schedule 4A – IDAS code for the development of prescribed tidal work

Page 5

                                                                             Earthwork and vegetation
 7.1 Excavation and filling for prescribed tidal      The earthwork and filling for the prescribed tidal work is             Not applicable.
 work—                                                consistent with each relevant planning scheme standard.
 (a) is carried out only to the extent reasonably
 necessary for the work; and (b) does not have
 a significant adverse effect on—
 (i) the natural features of the tidal water under,
 within or over which the work is located; or
 (ii) the level of the surface of the land under
 the tidal water under, within or over which the
 work is located, or any foreshores near the
 work.
 7.2 The location of prescribed tidal work            The vegetation in the tidal water, under within or over which the      No marine plants are present at the proposed sites. If
 ensures vegetation is cleared or disturbed only      prescribed tidal work is located, or on land under the tidal water,    marine plants become established in these locations
 to the extent reasonably necessary for the           is cleared or disturbed in a way consistent with each relevant         prior to installation, reef units are to be relocated.
 work.                                                planning scheme standard.
 7.3 Any vegetation damaged, destroyed or             Vegetation affected by the prescribed tidal work is dealt with in a    Not applicable.
 removed by prescribed tidal work under, within       way consistent with the following standards—
 or over tidal water other than an artificial         (a) subject to paragraph (b), vegetation damaged, destroyed or
 waterway, is replaced with appropriate               removed by prescribed tidal work is replaced with native
 vegetation.                                          vegetation for the locality within which the work is located, to the
                                                      extent it is reasonably practicable to replace the vegetation with
                                                      native vegetation;
                                                      (b) if a relevant planning scheme standard is more stringent than
                                                      the standard mentioned in paragraph (a)—the relevant planning
                                                      scheme standard, to the extent it is more stringent than the
                                                      standard mentioned in paragraph (a); (c) any other relevant
                                                      planning scheme standard that is not inconsistent with the
                                                      standards mentioned in paragraphs (a) and (b).




                                                                                                                                                                                      5
Coastal Protection and Management Regulation 2003 – Schedule 4A – IDAS code for the development of prescribed tidal work

Page 6

                                                                             Public access - availability
 8.1 Prescribed tidal work does not have a           The design and construction of the prescribed tidal work is         Public access specifically within the footprint of the
 significant adverse effect on the availability of   consistent with the following standards—                            structure is limited as oyster reefs cannot be walked
 public access to foreshores, including public       (a) subject to paragraph (b), prescribed tidal work does not        on directly, but as the footprint is small they do not
 access proposed in the relevant planning            involve the erection or placement of any physical barrier           prevent public access either to the foreshore from the
 scheme.                                             preventing existing access, along a public access way, to the       water or along the foreshore.
                                                     foreshores near the work;
                                                     (b) if a relevant planning scheme standard is more stringent than
                                                     the standard mentioned in paragraph (a)—the relevant planning
                                                     scheme standard, to the extent it is more stringent than the
                                                     standard mentioned in paragraph (a);
                                                     (c) any other relevant planning scheme standard that is not
                                                     inconsistent with the standards mentioned in paragraphs (a) and
                                                     (b).
                                                                                Public access - safety
 9.1 The location and design of prescribed           Public access to foreshores near the prescribed tidal work is       Oyster shells can be sharp, particularly for people
 tidal work does not adversely affect the safety     consistent with each relevant planning scheme standard.             walking or wading barefoot on the foreshore. As the
 of members of the public accessing the                                                                                  reef units are in the intertidal range, they may be
 foreshores.                                                                                                             emerged or submerged. The following has been
                                                                                                                         incorporated in the design of the works to mitigate
                                                                                                                         these risks:

                                                                                                                         -   Oyster shells to be encapsulated in coir bags to
                                                                                                                             limit exposure of sharp edges in the short term.
                                                                                                                             As the oyster reefs develop into natural reef
                                                                                                                             systems and the coir deteriorates this benefit will
                                                                                                                             be reduced, but by this time it is expected that the
                                                                                                                             oyster reefs will be a more recognised part of the
                                                                                                                             natural Noosa River environment and public
                                                                                                                             awareness will have increased.
                                                                                                                         -   Coir bags have apertures sufficiently small to
                                                                                                                             retain whole oyster shells (and prevent scattering
                                                                                                                             of shells across the seabed)
                                                                                                                         -   Coir bags are stacked and clustered to minimise
                                                                                                                             the initial area of the reef units and trigger
                                                                                                                             awareness of the presence of reef units.
                                                                                                                         -   Coir bags are secured to the seabed to reduce the
                                                                                                                             risk of migration of the coir bags into other areas
                                                                                                                             as a result of waves or flows.
                                                                                                                         -   Adopted water depths are such that reef units are
                                                                                                                             expected to be visible during periods of


                                                                                                                                                                                    6
Coastal Protection and Management Regulation 2003 – Schedule 4A – IDAS code for the development of prescribed tidal work

Page 7

                                                                                                                        reasonably water clarity (when use of the
                                                                                                                        foreshore is more likely).
                                                                                                                    -   Reef units have been located away from popular
                                                                                                                        recreation areas and often in areas with limited
                                                                                                                        accessibility, where usage of the foreshore is low.
                                                                                                                        At Site 16 (Lake Weyba) it has been located at the
                                                                                                                        northernmost end of the foreshore.
                                                                                                                    -   As the project intends to reinstate a small part of
                                                                                                                        what was previously extensive oyster reef habitat,
                                                                                                                        these risks are not new to the Noosa River system
                                                                                                                        and would be at a much smaller scale to what was
                                                                                                                        previously experienced.

                                                           Navigable access to, or egress from, non-tidal work lots
 10.1 Prescribed tidal work does not adversely     The design and construction of the prescribed tidal work is       The proposed works do not extend across private
 affect navigable access to, or navigable egress   consistent with the following standards—                          property side boundaries.
 from, any non-tidal work lot.                     (a) subject to paragraph (b), if the lot connected to prescribed
                                                   tidal work (the connected lot) adjoins a non-tidal work lot, the
                                                   work does not extend past the connected lot’s side boundary, or
                                                   extended side boundary, adjoining the non-tidal
                                                   lot;
                                                   (b) if a relevant planning scheme standard is more stringent than
                                                   the standard mentioned in paragraph (a)—the relevant planning
                                                   scheme standard, to the extent it is more stringent than the
                                                   standard mentioned in paragraph (a).




                                                                                                                                                                              7
Coastal Protection and Management Regulation 2003 – Schedule 4A – IDAS code for the development of prescribed tidal work

Page 8

                                                  Infrastructure, including access, parking, sewerage and water services
 11.1 Prescribed tidal work has appropriate         The infrastructure for prescribed tidal work is consistent with The nature and scale of the work is such that
 infrastructure, including, in particular, road     each relevant planning scheme standard.                         infrastructure is not required.
 access, parking facilities, sewerage services
 and water services, having regard to—
 (a) the nature and scale of the work; and
 (b) the number of people that may be on or at
 the work at any time; and
 (c) the number of vehicles that may be on or
 moored at the work at any time; and
 (d) the protection of any foreshores near the
 work and the vegetation and marine plants on
 the foreshores.




                                                                                                                                                                    8
Coastal Protection and Management Regulation 2003 – Schedule 4A – IDAS code for the development of prescribed tidal work

Page 9

                                                            Design, construction and safety - all prescribed tidal work
 12.1 Prescribed tidal work is designed and          The design and construction of the prescribed tidal work is        a)     The works are consistent with the building and
 constructed in a way to ensure it is structurally   consistent with the following standards—                                  engineering standards for tidal works as far as
 sound, having regard to the following—              (a) subject to paragraph (b), each Australian Standard relevant           possible.
 (a) relevant engineering standards;                 to the design or construction of structures, to the extent                -   To achieve its purpose, it is not desirable for
 (b) the location of the work;                       requirements stated in the Standard apply to the design or                    the works to extend above high tide.
 (c) the purpose for which the work is to be         construction of prescribed tidal work;                                    -   As materials are biodegradable its structural
 used;                                               (b) if a relevant planning scheme standard is more stringent than
                                                                                                                                   capacity over time may vary depending on
 (d) the impact of flooding, tidal influences and    any standard mentioned in paragraph (a)—the relevant planning
                                                                                                                                   the success of oyster recruitment.
 hydrodynamic changes.                               scheme standard, to the extent it is more stringent than the
                                                     standard mentioned in paragraph (a).                               b)     Locations have been selected by the University of
                                                                                                                               Sunshine Coast based on historical oyster areas,
                                                                                                                               high oyster spat recruitment potential, low
                                                                                                                               sedimentation as well as being clear of areas of
                                                                                                                               recreational usage and navigation channels. The
                                                                                                                               design is compatible with the locations, seabed
                                                                                                                               types and water depths.
                                                                                                                          c)   The purpose of the works is to restore natural
                                                                                                                               habitat. This has been taken into consideration in
                                                                                                                               the selection of sites, the design of the units and
                                                                                                                               the selection of biodegradable materials.


                                                                                                                          Design considers the local tidal range, tidal and flood
                                                                                                                          velocities and waves generated from vessels and wind
                                                                                                                          across the available fetch. Stability is based on
                                                                                                                          conservative assumptions; results of physical model
                                                                                                                          testing of anchored units is not yet available.

 12.2 Prescribed tidal work does not adversely       The design and construction of the prescribed tidal work is
 affect the structural integrity of any existing     consistent with the following standards—
 revetment or seawall or another existing            (a) subject to paragraph (b), prescribed tidal work, including any   The proposed works are not in close proximity to any
 structure.                                          shore abutment, piling or other structure connected with the         existing revetments, seawalls or other structures. The
                                                     work—                                                                scale of the proposed works is also relatively low. No
                                                     (i) does not place an additional load on any existing revetment      adverse effects are anticipated.
                                                     or seawall or another existing structure; or
                                                     (ii) can be structurally supported by an existing revetment or
                                                     seawall or another existing structure;
                                                     (b) if a relevant planning scheme standard is more stringent than
                                                     the standard mentioned in paragraph (a)—the relevant planning
                                                     scheme standard, to the extent it is more stringent than the
                                                     standard mentioned in paragraph (a).

                                                                                                                                                                                     9
Coastal Protection and Management Regulation 2003 – Schedule 4A – IDAS code for the development of prescribed tidal work

Page 10

 12.3 Prescribed tidal work is designed and      The design and construction of the prescribed tidal work is         No bank survey is available, however available aerial
 constructed in a way to ensure it does not      consistent with the following standards—                            imagery (2008 – 2016) indicates that adjacent
 adversely affect the stability of the bed and   (a) subject to paragraph (b), prescribed tidal work does not        foreshores are not experiencing significant long-term
 banks of any tidal water.                       cause, by changing the flow of water, the removal of, or            change and this is consistent with the lack of erosion
                                                 disturbance to, the sediment on the bed and banks of any tidal      scarps evident.
                                                 water;
                                                 (b) if a relevant planning scheme standard is more stringent than
                                                                                                                     Similar units have historically been utilised to provide
                                                 the standard mentioned in paragraph
                                                 a)—the relevant planning scheme standard, to the extent it is       protection to areas subject to wave erosion. As such,
                                                 more stringent than the standard mentioned in paragraph (a).        these units may result in accretion of the adjacent
                                                                                                                     foreshore although it is expected that tidal and flood
                                                                                                                     flows are dominant in most locations.

                                                                                                                     No modelling has been undertaken, however it is
                                                                                                                     expected that impacts would be relatively low given
                                                                                                                     the location close to the bank and the relatively small
                                                                                                                     footprint of the works. The units are angled to the
                                                                                                                     peak flood velocity to reduce impacts and oriented to
                                                                                                                     deflect ebb tide and peak flood flows toward the
                                                                                                                     channel (rather than toward the bank) to avoid
                                                                                                                     concentrating flows which might result in erosion of the
                                                                                                                     riverbank.

                                                                                                                     Localised build-up & scour is expected however the
                                                                                                                     proposed works are flexible and able to accommodate
                                                                                                                     minor changes. The majority of the sites appear
                                                                                                                     relatively stable with no sand ripples although aerial
                                                                                                                     photography indicates that they can be subject to
                                                                                                                     change. Significant sedimentation to the point of
                                                                                                                     burial is not expected. Sites 9 & 10 could potentially
                                                                                                                     experience the greatest changes, particularly in the
                                                                                                                     event of re-opening of the channel along the western
                                                                                                                     bank.

                                                                                                                     The works incorporate quarterly monitoring for the first
                                                                                                                     3 years and if any erosion or excessive accretion are
                                                                                                                     observed these can be evaluated and the reef units
                                                                                                                     can be modified, relocated or removed if necessary.




                                                                                                                                                                                10
Coastal Protection and Management Regulation 2003 – Schedule 4A – IDAS code for the development of prescribed tidal work

Page 11

 12.4 Prescribed tidal work is designed and       The design and construction of the prescribed tidal work is         The permanent oyster reef is composed of oyster
 constructed using materials having a long life   consistent with the following standards—                            shells, which are resistant to attack by marine
 in marine environments, having regard to their   (a) subject to paragraph (b), each Australian Standard relevant     organisms, corrosion, abrasion and immersion in
 ability to resist the following—                 to the materials that should be used, or the measures that          seawater.
 (a) attack by marine organisms;                  should be taken to treat materials used, for structures,
 (b) corrosion;                                   to the extent the requirements stated in the Standard apply to      Once established, the recruited oysters on the reef will
 (c) deterioration resulting from abrasion or     structures located in a marine environment;                         cement the reef together providing stability to the
 immersion in seawater.                           (b) if a relevant planning scheme standard is more stringent than   oyster shell substrate although the rate of oyster
                                                  the standard mentioned in paragraph (a)—t e relevant planning       recruitment is also unknown and likely variable
                                                  scheme standard, to the extent it is more stringent than the        between sites.
                                                  standard mentioned in paragraph (a).
                                                                                                                      During the initial recruitment period, stability is
                                                                                                                      provided by temporary materials (Coir, Manilla Rope &
                                                                                                                      Timber). These materials are biodegradable and do
                                                                                                                      not form part of the permanent structure. The life
                                                                                                                      expectancy for typical coir logs of this size is nominally
                                                                                                                      2 – 3 years however for periodically submerged coir
                                                                                                                      bags filled with oyster shell this could potentially be
                                                                                                                      shorter and is expected to vary between sites.

                                                                                                                      Where recruitment and cementing of the reef substrate
                                                                                                                      is adequate, reefs will successfully become
                                                                                                                      established prior to degradation of the coir product. In
                                                                                                                      cases where recruitment or cementing of the reef unit
                                                                                                                      is too low, reefs may not become successfully
                                                                                                                      established within this timeframe and oyster shell may
                                                                                                                      become uncontained.

                                                                                                                      Coir is naturally resistant to abrasion, however the risk
                                                                                                                      of damage is further reduced by filling the bags using a
                                                                                                                      sleeve and ensuring the bags are well packed to
                                                                                                                      prevent migration of shells within the bag.

                                                                                                                      The works incorporate quarterly monitoring for the first
                                                                                                                      3 years and if any erosion or excessive accretion are
                                                                                                                      observed these can be evaluated and the reef units
                                                                                                                      can be modified, relocated or removed if necessary.




                                                                                                                                                                               11
Coastal Protection and Management Regulation 2003 – Schedule 4A – IDAS code for the development of prescribed tidal work

Page 12

 12.5 Prescribed tidal work is designed and         The design and construction of the prescribed tidal work is
 constructed in a way to ensure it does not         consistent with the following standards—
 adversely affect the operation or maintenance      (a) subject to paragraph (c), vessels moored at prescribed tidal     The proposed sites are a significant distance from
 of any existing stormwater outlet.                 work do not impede the discharge of                                  existing stormwater outlets. Minimum distance for Site
                                                    stormwater;                                                          13 is 60m. No impact is anticipated.
                                                    (b) subject to paragraph (c), prescribed tidal work does not
                                                    restrict access to any stormwater outlet;
                                                    (c) if a relevant planning scheme standard is more stringent than
                                                    the standard mentioned in paragraph (a) or (b)—the relevant
                                                    planning scheme standard, to the extent it is more stringent than
                                                    the standard mentioned in paragraph (a) or (b).
 12.6 Prescribed tidal work is designed and         The design and construction of the prescribed tidal work is          The proposed works are designed to minimise the
 constructed in a way to ensure it does not         consistent with the following standards—                             potential impact on water quality.
 adversely affect the water quality of any tidal    (a) subject to paragraph (b), each Australian Standard relevant
 water, including, in particular, as a result of—   to the design or construction of structures under, within or over        a.   Release of materials into tidal water is limited
 (a) release, into the tidal water, of materials    tidal water, to the extent the requirements stated in the Standard            to the physical placement of the coir reef
 used in the construction of the work; or           are directed at maintaining the water quality of tidal water;                 units in accordance with the design. All
 (b) disturbance to the sediment on the bed and     (b) if a relevant planning scheme standard is more stringent than             excess materials, damaged components,
 banks of the tidal water; or                       the standard mentioned in paragraph (a)—the relevant planning                 loose oyster shell or other debris from the
 (c) exposure to acid sulphate soils.               scheme standard, to the extent it is more stringent than the                  works is to be removed from site.
                                                    standard mentioned in paragraph (a).
                                                                                                                             b.   Disturbance of sediment is limited to driving
                                                                                                                                  timber stakes into the seabed to anchor the
                                                                                                                                  units. While embedment of the oyster reefs
                                                                                                                                  would be beneficial to the overall stability of
                                                                                                                                  the base units, no removal of sediment is
                                                                                                                                  proposed.
                                                                                                                             c.   No sediments are to be disturbed and so Acid
                                                                                                                                  Sulfate Soils will not be exposed.

 12.7 Prescribed tidal work is designed and         The design and construction of the prescribed tidal work is          This is not relevant as the work is not intended to be
 constructed in a way to ensure it is safe for      consistent with the following standards—                             walked on.
 persons standing or walking on the work.           (a) subject to paragraph (c), any surface of prescribed tidal work
                                                    on which a person may stand or walk is—
                                                    (i) not slippery; and
                                                    (ii) does not have any feature that may cause the person to trip
                                                    or fall;
                                                    (b) subject to paragraph (c), any part of prescribed tidal work
                                                    that is unsafe for persons standing or walking on the work is
                                                    surrounded by adequate barriers to deter persons from entering
                                                    the part; (c) if a relevant planning scheme standard is more
                                                    stringent than the standard mentioned in paragraph (a) or (b)—


                                                                                                                                                                                    12
Coastal Protection and Management Regulation 2003 – Schedule 4A – IDAS code for the development of prescribed tidal work

Page 13

                                                   the relevant planning scheme standard, to the extent it is
                                                   more stringent than the standard mentioned in paragraph (a) or
                                                   (b).
 12.8 Appropriate measures are taken for           The design and construction of the prescribed tidal work is          This is not relevant as the work is not intended to be
 prescribed tidal work for a non-private purpose   consistent with the following standards— (a) subject to              walked on.
 to ensure an unsupportable live load is not       paragraph (b), prescribed tidal work has erected or placed in
 applied to the work by persons or vehicles.       position on or near the work, a sign that—
                                                   (i) is visible at all times; and (ii) states the maximum live load
                                                   that may be applied to the work, in terms of the maximum
                                                   number of persons that may be on the work at any given time
                                                   or the maximum number of vehicles of a particular type
                                                   that may be on or moored at the work at any given time;
                                                   (b) if a relevant planning scheme standard is more stringent than
                                                   the standard mentioned in paragraph (a)—the relevant planning
                                                   scheme standard, to the extent it is more stringent than the
                                                   standard mentioned in paragraph (a).
 12.9 Prescribed tidal work, other than a          The design and construction of the prescribed tidal work is          The reefs are all located outside of canals
 boardwalk or an independent deck                  consistent with each relevant planning scheme standard.
 for a private purpose, is designed and
 constructed in a way that ensures the use of
 tidal water in a canal for a non-maritime
 purpose is minimised.




                                                                                                                                                                                 13
Coastal Protection and Management Regulation 2003 – Schedule 4A – IDAS code for the development of prescribed tidal work

Page 14

 12.10 Prescribed tidal work that is a boardwalk   (s 6(2) solution)                                                   Not applicable
 or an independent deck and for a private          The design and construction of the boardwalk or deck is
 purpose, is designed and constructed in a way     consistent with the following standards—
 that ensures the use of tidal water in a canal    (a) subject to paragraph (c), a boardwalk or independent deck
 for a non-maritime purpose is minimised.          does not extend more than 3m from the waterfront boundary of
                                                   the lot connected to the boardwalk or deck; (b) subject to
                                                   paragraph (c), a boardwalk or independent deck is at least 3m
                                                   inside of the side boundary or extended side boundary of the lot
                                                   connected to the boardwalk or deck; (c) if a relevant planning
                                                   scheme standard is more stringent than the standard mentioned
                                                   in paragraph (a) or (b)—the relevant planning scheme standard,
                                                   to the extent it is more stringent than the standard mentioned in
                                                   paragraph (a) or (b).




                                               Design, construction and safety - boat ramps and slip ways for private purpose
 13.1 Prescribed tidal work that is a private       (s 6(2) solution)                                                  Not applicable
 boat ramp or private slip way is designed and      The design and construction of the boat ramp or slip way is
 constructed in a way to ensure it is structurally  consistent with the following standards—
 sound while also ensuring the top of each wall     (a) subject to paragraph (c), the walls at the edge of a boat ramp
 at the edge of the boat ramp or slip way is        or slip way penetrate into the earth at least 600mm below the
 level with the surface of the land on which the    surface of the land on which the boat ramp or slip
 boat ramp or slip way is located.                  way is located;
                                                    (b) subject to paragraph (c), the surface of a boat ramp or slip
                                                    way is no more than 200mm above the surface of the land on
                                                    which it is located;
                                                    (c) if a relevant planning scheme standard is more stringent than
                                                    the standard mentioned in paragraph (a) or (b)—the relevant



                                                                                                                                        14
Coastal Protection and Management Regulation 2003 – Schedule 4A – IDAS code for the development of prescribed tidal work

Page 15

                                                    planning scheme standard, to the extent it is more stringent than
                                                    the standard mentioned in paragraph (a) or (b).
 13.2 Prescribed tidal work that is a private       (s 6(2) solution)                                                    Not applicable
 boat ramp or private slip way is designed and      The design and construction of the boat ramp or slip way is
 constructed in a way to ensure the safe            consistent with the following standards—(a) subject to paragraph
 movement of vehicles or persons over the boat      (d), the upper surface of a boat ramp or slip way has a width of
 ramp or slip                                       no less than 3.6m; (b) subject to paragraph (d), the whole
 way.                                               upper surface of a boat ramp or slip way is treated to prevent it
                                                    from becoming slippery by using any of the following methods—
                                                    (i) forming grooves over the surface, as close as possible to
                                                    40mm wide, 20mm deep and 150mm apart, and at an angle
                                                    as close as possible to 70º to the centre-line of the boat ramp or
                                                    slip way; (ii) covering the surface with a substance ordinarily
                                                    used on slippery surfaces to prevent
                                                    skidding; (iii) making, through a physical act, the surface coarse
                                                    before it sets, including, for example, by raking the surface;
                                                    (c) subject to paragraph (d), the upper surface of a boat ramp or
                                                    slip way for which a winch is not used to hoist or haul vessels
                                                    onto the boat ramp or slip way is at a gradient of not steeper
                                                    than— (i) if the surface is treated by using a method mentioned
                                                    in paragraph (b)(i) or (ii)—1:8; or (ii) otherwise—1:10;
                                                    (d) if a relevant planning scheme standard is more stringent than
                                                    the standard mentioned in paragraph (a), (b) or (c)—the relevant
                                                    planning scheme standard, to the extent it is more stringent than
                                                    the standard mentioned in paragraph (a), (b) or (c).




                                                                    Design, construction and safety - bridges
 14.1 Prescribed tidal work that is a bridge does   The design and construction of the bridge, including any             Not applicable
 not adversely affect existing public use of any    abutment connected with the bridge, is consistent with the
 tidal water, including, for example, use of the    following standards— (a) subject to paragraph (b), the clearance
 tidal water for canoeing, swimming or other        levels under a bridge are high enough to allow continued
 recreational activities.                           public use of any tidal water over which it is constructed;
                                                    (b) if a relevant planning scheme standard is more stringent than
                                                    the standard mentioned in paragraph (a)—the relevant planning
                                                    scheme standard, to the extent it is more stringent than the
                                                    standard mentioned in paragraph (a).




                                                                                                                                          15
Coastal Protection and Management Regulation 2003 – Schedule 4A – IDAS code for the development of prescribed tidal work

Page 16

 14.2 Prescribed tidal work that is a bridge      The design and construction of the bridge is consistent with the     Not applicable
 does not adversely affect the flow of water      following standards—
 under the bridge.                                (a) subject to paragraph (b)— (i) if a bridge can be adequately
                                                  supported without erecting or placing a foundation support in
                                                  tidal water—no foundation support to support the bridge is
                                                  erected or placed in the tidal water; or
                                                  (ii) otherwise—only the minimum number of foundation supports
                                                  required to support the bridge is used;
                                                  (b) if a relevant planning scheme standard is more stringent than
                                                  the standard mentioned in paragraph (a)—the relevant planning
                                                  scheme standard, to the extent it is more stringent than the
                                                  standard mentioned in paragraph (a).




                                                  Design, construction and safety - boardwalks and independent decks
 15.1 Prescribed tidal work that is a boardwalk   (s 6(2) solution)                                                     Not applicable
 or an independent deck and for a private         The design and construction of the boardwalk or deck is
 purpose is designed and constructed in a way     consistent with the following standards—
 to ensure it is able to support its intended     (a) subject to paragraph (d), a boardwalk or independent deck
 loads, having regard to its relevant loading     accessible to vehicular traffic is able to support at least a live
 matters.                                         load of 3.0kPa plus an axle load of 10kN; (b) subject to
                                                  paragraph (d), a boardwalk or independent deck that
                                                  is not accessible to vehicular traffic and that is for individual use
                                                  is able to support at least a live load of 2.0kPa;
                                                  (c) subject to paragraph (d), a boardwalk or independent deck

                                                                                                                                         16
Coastal Protection and Management Regulation 2003 – Schedule 4A – IDAS code for the development of prescribed tidal work

Page 17

                                                     that is not accessible to vehicular traffic and that is for group use
                                                     is able to support at least a live load of 3.0kPa; (d) if a relevant
                                                     planning scheme standard is more stringent than the
                                                     standard mentioned in paragraph (a), (b) or (c)—the relevant
                                                     planning scheme standard, to the extent it is more stringent than
                                                     the standard mentioned in paragraph (a), (b) or (c).
 15.2 Prescribed tidal work that is a boardwalk      (s 6(2) solution) The design or construction of the boardwalk or        Not applicable
 or an independent deck and for a non-private        deck is consistent with the following standards—
 purpose is designed and constructed in a way        (a) subject to paragraph (c), a boardwalk or independent deck
 to ensure it is able to support its intended        accessible to vehicular traffic is able to support at least the
 loads, having regard to its relevant loading        following— (i) a distributed live load of 5.0kPa; (ii) a
 matters.                                            concentrated live load of 4.5kN; (iii) the load of the largest
                                                     vehicle capable of being on the boardwalk or deck;
                                                     (b) subject to paragraph (c), a boardwalk or independent deck
                                                     not accessible to vehicular traffic is able to support at least the
                                                     following— (i) a distributed live load of 5.0kPa;
                                                     (ii) a concentrated live load of 4.5kN; c) if a relevant planning
                                                     scheme standard is more stringent than the standard mentioned
                                                     in paragraph (a) or (b)—the relevant planning scheme standard,
                                                     to the extent it is more stringent than the standard mentioned in
                                                     paragraph (a) or (b).
 15.3 Prescribed tidal work that is a boardwalk      The design and construction of the boardwalk or deck is                 Not applicable
 or an independent deck does not prevent or          consistent with the following standards—
 hinder remedial work being undertaken on any        (a) subject to paragraph (b), a boardwalk or independent deck
 bank of tidal water or for any existing retaining   either— (i) can be easily dismantled and reassembled; or
 wall, revetment or seawall or another existing      (ii) does not restrict the movement of machinery ordinarily used
 structure.                                          for remedial work to any bank of tidal water or any existing
                                                     retaining wall, revetment or seawall or other existing
                                                     structure; (b) if a relevant planning scheme standard is more
                                                     stringent than the standard mentioned in paragraph (a)—the
                                                     relevant planning scheme standard, to the extent it is more
                                                     stringent than the standard mentioned in paragraph (a).
                                                                Design, construction and safety - jetties and piers
 Prescribed tidal work that is a jetty or            The design and construction of the jetty                                Not applicable
 pier and for a private purpose is designed and      or pier is consistent with the following
 constructed in a way to ensure it is able to        standards—
 support its intended loads, having regard to its    (a) subject to paragraph (d), a jetty or pier accessible to
 relevant loading matters.                           vehicular traffic is able to support at least a live load of
                                                     3.0kPa plus an axle load of 10kN; (b) subject to paragraph (d), a
                                                     jetty or pier that is not accessible to vehicular traffic and that is
                                                     for individual use is able to support at least a live load of 2.0kPa;
                                                     (c) subject to paragraph (d), a jetty or pier that is not accessible
                                                     to vehicular traffic and that is for group use is able to support at

                                                                                                                                              17
Coastal Protection and Management Regulation 2003 – Schedule 4A – IDAS code for the development of prescribed tidal work

Page 18

                                                    least a live load of 3.0kPa; (d) if a relevant planning scheme
                                                    standard is more stringent than the standard mentioned in
                                                    paragraph (a), (b) or (c)—the relevant planning scheme
                                                    standard, to the extent it is more stringent than the standard
                                                    mentioned in paragraph (a), (b) or (c).
 16.2 Prescribed tidal work that is a jetty or      The design and construction of the jetty or pier is consistent with       Not applicable
 pier and for a non-private purpose is designed     the following standards—
 and constructed in a way to ensure it is able to   (a) subject to paragraph (c), a jetty or pier accessible to
 support its intended loads, having regard to its   vehicular traffic is able to support at least the following—
 relevant loading matters.                          (i) a distributed live load of 5.0kPa; (ii) a concentrated live load of
                                                    4.5kN; (iii) the load of the largest vehicle capable of being on or
                                                    moored at the jetty or pier; (b) subject to paragraph (c), a jetty or
                                                    pier not accessible to vehicular traffic is able to support at least
                                                    the following— (i) a distributed live load of 5.0kPa; (ii) a
                                                    concentrated live load of 4.5kN;
                                                    (c) if a relevant planning scheme standard is more stringent than
                                                    the standard mentioned in paragraph (a) or (b)—the relevant
                                                    planning scheme standard, to the extent it is more stringent than
                                                    the standard mentioned in paragraph (a) or (b).
 16.3 Prescribed tidal work that is a jetty or      The design and construction of the jetty or pier is consistent with       Not applicable
 a pier is designed and constructed in a way to     the following standards—
 ensure it remains above water at all times.        (a) subject to paragraph (b), either— (i) the level of the deck of a
                                                    jetty or pier is at least 300mm above the water at highest
                                                    astronomical tide; or (ii) piles or other markers indicate
                                                    the presence of the jetty or pier when it is inundated;
                                                    (b) if a relevant planning scheme standard is more stringent than
                                                    the standard mentioned in paragraph (a)—the relevant planning
                                                    scheme standard, to the extent it is more stringent than the
                                                    standard mentioned in paragraph (a).




                                                                                                                                               18
Coastal Protection and Management Regulation 2003 – Schedule 4A – IDAS code for the development of prescribed tidal work

Page 19

 16.4 Prescribed tidal work that is a jetty or pier   The design and construction of the jetty or pier is consistent with      Not applicable
 and for a private purpose is designed and            the following standards—
 constructed in a way to ensure it is of a size       (a) subject to paragraph (b), all parts of the deck of a jetty or pier
 suitable for maritime use while still minimising     have a width of at least 900mm and not more than 3m;
 the amount of tidal water occupied by it.            (b) if a relevant planning scheme standard is more stringent than
                                                      the standard mentioned in paragraph (a)—the relevant planning
                                                      scheme standard, to the extent it is more stringent than the
                                                      standard mentioned in paragraph (a).




                                                 Design, construction and safety - Pipelines and other underground services
 17.1 The design and construction of                The design and construction of the pipeline or underground          Not applicable
 prescribed tidal work that is a pipeline, or       service is consistent with the following standards—
 another underground service used instead of a (a) subject to paragraph (b), a pipeline or other underground
 pipeline, does not adversely affect the ability    service is installed at least 1.2m below the surface of land, after
 of vessels to be anchored near the work.           it is installed;
                                                    (b) if a relevant planning scheme standard is more stringent than
                                                    the standard mentioned in paragraph (a)—the relevant planning
                                                    scheme standard, to the extent it is more stringent than the
                                                    standard mentioned in paragraph (a).




                                                                                                                                                19
Coastal Protection and Management Regulation 2003 – Schedule 4A – IDAS code for the development of prescribed tidal work

Page 20

                                                                    Design, construction and safety - pontoons
 18.1 Prescribed tidal work that is a pontoon,      The design and construction of the pontoon is consistent with             Not applicable
 for a private purpose, and not used only for       the following standards—
 rowing, is designed and constructed in a way       (a) subject to paragraph (c), a pontoon for individual use is able
 to ensure it is able to support its intended       to support at least a live load of 1.5kPa; (b) subject to paragraph
 loads, having regard to its relevant loading       (c), a pontoon for group use is able to support at least a live load
 matters.                                           of 2.0kPa; (c) if a relevant planning scheme standard is more
                                                    stringent than the standard mentioned in paragraph (a) or (b)—
                                                    the relevant planning scheme standard, to the extent it is
                                                    more stringent than the standard mentioned in paragraph (a) or
                                                    (b).
 18.2 Prescribed tidal work that is a pontoon,      The design and construction of the pontoon is consistent with             Not applicable
 for a non-private purpose, and not used only       the following standards—
 for rowing, is designed and constructed in a       (a) subject to paragraph (c), a pontoon open for use by the
 way to ensure it is able to support its intended   general public or used for a commercial purpose is able to
 loads, having regard to its relevant loading       support at least the following— (i) a distributed live load of
 matters.                                           3.0kPa; (ii) a concentrated live load of 4.5kN;
                                                    (b) subject to paragraph (c), a pontoon other than a pontoon
                                                    mentioned in
                                                    paragraph (a) is able to support at least the following—
                                                    (i) a distributed live load of 2.0kPa; (ii) a concentrated live load of
                                                    4.5kN;
                                                    (c) if a relevant planning scheme standard is more stringent than
                                                    the standard mentioned in paragraph (a) or (b)—the relevant
                                                    planning scheme standard, to the extent it is more stringent than
                                                    the standard mentioned in paragraph (a) or (b).
 18.3 Prescribed tidal work that is a pontoon       The design and construction of the pontoon is consistent with             Not applicable
 and used only for rowing is designed and           the following standards—
 constructed in a way to ensure—                    (a) subject to paragraph (c), the access walkway of a pontoon
 (a) it is able to support its intended loads,      used only for rowing is able to support at least a live load of
 having regard to its relevant loading matters;     3.0kPa;
 and                                                (b) the flotation unit of a pontoon used only for rowing is able to
 (b) it is safe for persons using the               support at least a live load of 1.5kPa;
 pontoon to launch and retrieve                     (c) if a relevant planning scheme standard is more stringent than
 rowing vessels.                                    the standard mentioned in paragraph (a) or (b)—the relevant
                                                    planning scheme standard, to the extent it is more stringent than
                                                    the standard mentioned in paragraph (a) or (b).
 18.4 Prescribed tidal work that is a pontoon is    The design and construction of the pontoon is consistent with             Not applicable
 designed and constructed in a way to ensure        the following standards—
 any load applied to the pontoon by a person or     (a) subject to paragraph (f), a pontoon’s access walkway
 thing on the pontoon does not cause the            extends at least 500mm onto the pontoon’s flotation unit;
 pontoon to tip over or tilt to a degree causing    (b) subject to paragraph (f), a pontoon’s access walkway is
 the person or thing to fall off the pontoon.       constructed with a material that has a non-slippery surface;

                                                                                                                                               20
Coastal Protection and Management Regulation 2003 – Schedule 4A – IDAS code for the development of prescribed tidal work

Page 21

                                                   (c) for a pontoon used only for rowing—subject to paragraph (f),
                                                   at least 75mm of the height of the pontoon’s flotation unit
                                                   remains above the water over which it is constructed if a
                                                   distributed live load is applied to half of the surface of
                                                   the pontoon’s flotation unit and all of the surface of the pontoon’s
                                                   access walkways;(d) for a pontoon other than a pontoon
                                                   mentioned in paragraph (c)—subject to paragraph (f), the top
                                                   surface of the pontoon’s flotation unit remains above the water
                                                   over which it is constructed if a distributed live load of 1.5kPa is
                                                   applied to half of the surface of the pontoon’s flotation unit and
                                                   all of the surface of the pontoon’s access walkways;
                                                   (e) subject to paragraph (f), the whole base of the pontoon’s
                                                   flotation unit remains in contact with the water over which it is
                                                   constructed at all times and tilts no more than 15º at any time;
                                                   (f) if a relevant planning scheme standard is more stringent than
                                                   the standard mentioned in paragraph (a), (b), (c), (d) or (e)—the
                                                   relevant planning scheme standard, to the extent it is more
                                                   stringent than the standard mentioned in paragraph (a),
                                                   (b), (c), (d) or (e).
 18.5 Prescribed tidal work that is a pontoon is   The design and construction of the pontoon is consistent with          Not applicable
 designed and constructed in a way to ensure it    the following standards—
 remains above the water at all times.             (a) subject to paragraph (b), the pontoon’s abutment is located
                                                   no less than 300mm above the water at high water mark;
                                                   (b) if a relevant planning scheme standard is more stringent than
                                                   the standard mentioned in paragraph (a)—the relevant planning
                                                   scheme standard, to the extent it is more stringent than the
                                                   standard mentioned in paragraph (a).




                                                                                                                                           21
Coastal Protection and Management Regulation 2003 – Schedule 4A – IDAS code for the development of prescribed tidal work

Page 22

 18.6 Prescribed tidal work that is a pontoon is      The design and construction of the pontoon is consistent with       Not applicable
 designed and constructed in a way to ensure          the following standards—
 the pontoon’s flotation unit will rise and fall to   (a) for a pontoon located in an area prone to flooding—subject to
 allow for changes in tidal water                     paragraph (c), the pontoon’s flotation unit is moored by piles;
 levels.                                              (b) for a pontoon other than a pontoon mentioned in paragraph
                                                      (a)—subject to paragraph (c), the pontoon’s flotation unit is—
                                                      (i) attached, through the pontoon’s system for mooring the unit,
                                                      to concrete anchors in the bank landward of the pontoon; or
                                                      (ii) moored by piles; (c) if a relevant planning scheme
                                                      standard is more stringent than the standard mentioned in
                                                      paragraph (a) or (b)—the relevant planning scheme standard, to
                                                      the extent it is more stringent than the standard mentioned in
                                                      paragraph (a) or (b).




                                                                                                                                           22
Coastal Protection and Management Regulation 2003 – Schedule 4A – IDAS code for the development of prescribed tidal work

Page 23

                                                 Design, construction and safety – retaining walls, revetments and seawalls
 19.1 Prescribed tidal work that is a retaining     The design and construction of the retaining wall, revetment or   Not applicable
 wall, revetment or seawall, is designed and        seawall is consistent with the following standards—
 constructed in a way to ensure it is able to       (a) subject to paragraph (b), a retaining wall, revetment or
 support its intended loads, having regard to its   seawall is able to support at least a distributed live
 relevant loading matters.                          load of 3.0kPa;
                                                    (b) if a relevant planning scheme standard is more stringent than
                                                    the standard mentioned in paragraph (a)—the relevant planning
                                                    scheme standard, to the extent it is more stringent than the
                                                    standard mentioned in paragraph (a).
 19.2 Prescribed tidal work that is a retaining     The design and construction of the retaining wall, revetment or   Not applicable
 wall, revetment or seawall, is designed and        seawall is consistent with the following
 constructed in a way to ensure it can              standards—
 withstand—                                         (a) subject to paragraph (c), a retaining wall, revetment or
 (a) any tendency of overturning or sliding; and    seawall has a factor of safety of no less than 1.5;
 (b) any other effects of waves or changes in       (b) subject to paragraph (c), a retaining wall, revetment or
 water levels on the retaining wall, revetment or seawall is able to withstand the effect of waves, or waves and
 seawall.                                           water levels, resulting from a storm or other natural event
                                                    of a magnitude that has a 2% or lower probability of occurring in
                                                    any calendar year;
                                                    (c) if a relevant planning scheme standard is more stringent than
                                                    the standard mentioned in paragraph (a) or (b)—the relevant
                                                    planning scheme standard, to the extent it is more stringent than
                                                    the standard mentioned in paragraph (a) or (b).
 19.3 Prescribed tidal work that is a retaining     The design and construction of the retaining wall, revetment or   Not applicable
 wall, revetment or seawall not founded upon        seawall is consistent with the following standards—
 rock, is designed and constructed to protect       (a) subject to paragraph (c), a retaining wall, revetment or
 the seaward side of retaining wall, revetment      seawall provides for a sub-layer or enough filter material to
 or seawall from erosion.                           ensure it is reasonably likely to remain in place for at least
                                                    50 years;
                                                    (b) subject to paragraph (c), the bottom edge of the base of a
                                                    retaining wall, revetment or seawall is reasonably likely to
                                                    prevent any adverse effects from potential erosion of the soil
                                                    under the retaining wall, revetment or seawall for at least 50
                                                    years;
                                                    (c) if a relevant planning scheme standard is more stringent than
                                                    the standard mentioned in paragraph (a) or (b)—the relevant
                                                    planning scheme standard, to the extent it is more stringent than
                                                    the standard mentioned in paragraph (a) or (b)




                                                                                                                                       23
Coastal Protection and Management Regulation 2003 – Schedule 4A – IDAS code for the development of prescribed tidal work

Page 24

 19.4 Prescribed tidal work that is a retaining   The design and construction of the retaining wall, revetment or     Not applicable
 wall, revetment or seawall, is not adversely     seawall is consistent with the following standards—
 affected by hydrostatic pressure behind the      (a) subject to paragraph (b), a retaining wall, revetment or
 retaining wall, revetment or seawall.            seawall provides for drainage holes, and suitable filter material
                                                  behind the holes, to relieve any hydrostatic pressure behind the
                                                  retaining wall, revetment or seawall;
                                                  (b) if a relevant planning scheme standard is more stringent than
                                                  the standard mentioned in paragraph (a)—the relevant planning
                                                  scheme standard, to the extent it is more stringent than the
                                                  standard mentioned in paragraph (a).




                                                                                                                                       24
Coastal Protection and Management Regulation 2003 – Schedule 4A – IDAS code for the development of prescribed tidal work

Page 25

                                                                  Design, construction and safety -wharves
 20.1 Prescribed tidal work that is a wharf is    The design and construction of the wharf is consistent with the      Not applicable
 designed and constructed in a way to ensure it   following standards—
 is able to support its intended loads, having    (a) subject to paragraph (c), a major wharf, or a minor wharf
 regard to its relevant loading matters.          accessible to vehicular traffic, is able to support at least the
                                                  following— (i) a distributed live load of 5.0kPa;
                                                  (ii) a concentrated live load of 13kN; or (b) subject to paragraph
                                                  (c), a minor wharf not accessible to vehicular traffic is able to
                                                  support at least the following— (i) a distributed live load of
                                                  5.0kPa; or (ii) a concentrated live load of 4.5kN; or
                                                  (c) if a relevant planning scheme standard is more stringent than
                                                  the standard mentioned in paragraph (a) or (b)—the relevant
                                                  planning scheme standard, to the extent it is more stringent than
                                                  the standard mentioned in paragraph (a) or (b).




                                                                                                                                        25
Coastal Protection and Management Regulation 2003 – Schedule 4A – IDAS code for the development of prescribed tidal work

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.