Enclosure 4 - Schedule 4a
Attached to the e-mail Operational Works Application OPW17/0016.
Schedule 4A.
Part 3 Specific outcomes and probable solutions
Specific outcome A probable solution Comment
Character and amenity (generally)—prescribed tidal work in a canal
1.1 Prescribed tidal work in a canal and The design and construction of the prescribed tidal work is Not applicable
for a private purpose is compatible consistent with the following standards—
with its location, having regard to the (a) subject to paragraph (c), prescribed tidal work does not
following— extend past the side boundary or extended side boundary of the
(a) the character and amenity of the lot connected to the work;
work’s immediate surroundings (b) subject to paragraph (c), prescribed tidal work is not roofed;
and the locality within which the (c) if a relevant planning scheme standard is more stringent than
work is located; the standard mentioned in paragraph (a) or (b)—the relevant
(b) if the relevant planning scheme planning scheme standard, to the extent it is more stringent
states the desired character or than the standard mentioned in paragraph (a) or (b); (d) any
amenity for the work’s other relevant planning scheme standard that is not inconsistent
immediate surroundings or the with the standards mentioned in paragraphs (a) to (c).
locality within which the work
is located—the stated desired
character or amenity.
1.2 Prescribed tidal work in a canal and for a The design and construction of the prescribed tidal work is Not applicable
non-private purpose is compatible with its consistent with the following standards—
location, having regard to the following— (a) subject to paragraph (c), prescribed tidal work used for a
(a) the character and amenity of the work’s commercial purpose does not extend past the side boundary or
immediate surroundings and the locality within extended side boundary of the lot connected to the
which the work is located; work; (b) subject to paragraph (c), prescribed tidal work is not
(b) if the relevant planning scheme states the roofed unless it is the main access to land;
desired character or amenity for the work’s (c) if a relevant planning scheme standard is more stringent than
immediate surroundings or the locality within the standard mentioned in paragraph (a) or (b)—the relevant
which the work is located—the stated desired planning scheme standard, to the extent it is more stringent than
character or amenity. the standard stated in paragraph (a) or (b); (d) any other relevant
planning scheme standard that is not inconsistent with the
standards mentioned in paragraphs (a) to (c).
1
Coastal Protection and Management Regulation 2003 – Schedule 4A – IDAS code for the development of prescribed tidal work
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.
Full text of the other 24 pages
Page 2
Character and amenity (generally)—prescribed tidal work not in a canal
2.1 Prescribed tidal work not in a canal and for The design and construction of the prescribed tidal work is The proposed work is not for a private purpose.
a private purpose is compatible with its consistent with the following standards—
location, having regard to the following— (a) subject to paragraph (e), prescribed tidal work does not
(a) the character and amenity of the work’s extend past the side boundary or extended side boundary of the
immediate surroundings and the locality within lot connected to the work;
which the work is located; (b) subject to paragraph (e), prescribed tidal work is the only
(b) if the relevant planning scheme states the work of its type along the edge of the tidal water fronting the lot
desired character or amenity for the work’s connected to the work;
immediate surroundings or the locality within (c) subject to paragraph (e), prescribed tidal work that is a
which the work is located—the stated desired boardwalk or independent deck is not roofed;
(d) subject to paragraph (e), prescribed tidal work other than a
boardwalk or deck is not roofed unless it is the main access to
land;
(e) if a relevant planning scheme standard is more stringent than
the standard mentioned in paragraph (a), (b), (c) or (d)—the
relevant planning scheme standard, to the extent it is more
stringent than the standard mentioned in paragraph (a), (b), (c)
or (d);
(f) any other relevant planning scheme standard that is not
inconsistent with the standards mentioned in paragraphs (a) to
(e).
2.2 Prescribed tidal work not in a canal and for The design and construction of the prescribed tidal work is The proposed work is compatible with is location,
a non-private purpose is compatible with its consistent with the following standards— being the reinstatement of previously naturally-
location, having regard to the following— (a) subject to paragraph (c), prescribed tidal work used for a occurring habitat.
(a) the character and amenity of the work’s commercial purpose does not extend past the side boundary or
immediate surroundings and the locality within extended side boundary of the lot connected to the work;
which the work is located; (b) subject to paragraph (c), prescribed tidal work used for a
(b) if the relevant planning scheme states the commercial purpose is not roofed unless it is the main access to
desired character or amenity for the work’s land;
immediate surroundings or the locality within (c) if a relevant planning scheme standard is more stringent than
which the work is located—the stated desired the standard mentioned in paragraph (a) or (b)—the relevant
character or amenity. planning scheme standard, to the extent the standard is more
stringent than the standard mentioned in paragraph (a) or (b);
(d) any other relevant planning scheme standard that is not
inconsistent with the standards mentioned in paragraphs (a) to
(c).
2
Coastal Protection and Management Regulation 2003 – Schedule 4A – IDAS code for the development of prescribed tidal work
Page 3
Character and amenity (height, scale and size)
3.1 Prescribed tidal work is of a height, scale The height, scale and size of the prescribed tidal work is The proposed work considers the
and size to ensure the work is compatible with consistent with each relevant planning scheme standard. - Height, being located relative to the local
the character and amenity of its location, tidal planes in each specific location.
having regard to the following— - Scale & Size, being a significantly lower area
(a) the height, scale and size of the natural than the historically present oyster reef
features of the work’s immediate surroundings populations, however expected to naturally
and the locality within which the work is expand over time in areas where they are
located; successfully established (and as a result of
(b) the height, scale and size of the existing any future stages).
buildings or other structures in the work’s
immediate surroundings and the locality within
which the work is located;
(c) if the relevant planning scheme states the
desired height, scale or size of buildings or
other structures in the work’s immediate
surroundings or the locality within which the
work is located—the stated desired height,
scale or size.
Character and amenity (materials and colours)
4.1 The materials used for, and the colours of, The materials used for, and colours of, the prescribed tidal work The proposed work is within natural areas of the
prescribed tidal work are compatible with the are consistent with each relevant planning scheme standard. Noosa River and the Noosa River Fish Habitat Area.
character and amenity of the work’s location, The oyster shell used is locally sourced (from Moreton
having regard to the following— Island and boiled in accordance with biosecurity
(a) the natural features of the work’s principals) and is the most suitable material to act as a
immediate surroundings and the locality within substrate for recruiting oysters.
which the work is located;
(b) the existing buildings or other structures in Other materials used to provide stability in the interim
the work’s immediate surroundings and the as reefs become established are coir, Manilla rope.and
locality within which the work is located; timber. All materials are biodegradable and suitable
(c) if the relevant planning scheme states the for the environment.
desired materials to be used for, or desired
colours of, buildings or other structures in
the work’s immediate surroundings or the
locality within which the work is located—the
stated desired materials or colours.
3
Coastal Protection and Management Regulation 2003 – Schedule 4A – IDAS code for the development of prescribed tidal work
Page 4
Lighting
5.1 Lighting, other than an aid to navigation, The lighting for the prescribed tidal work, other than an aid to Not applicable
for prescribed tidal work is installed in a way to navigation, is consistent with the following standards—
ensure the security and safe use of the work (a) subject to paragraph (c), lighting for prescribed tidal work is
without causing significant adverse effects on hooded and directed downwards; (b) subject to paragraph (c),
the amenity of the locality within which the each lighting standard, to the extent relevant;
work is located. (c) if a relevant planning scheme standard is more stringent than
the standard mentioned in paragraph (a) or (b)—the relevant
planning scheme standard, to the extent the standard is more
stringent than the standard mentioned in paragraph (a) or (b);
(d) any other relevant planning scheme standard that is not
inconsistent with the standards mentioned in paragraphs (a) to
(c).
Signage
6.1 A sign erected or otherwise placed in A sign erected or otherwise placed in position for prescribed tidal No signage.
position for prescribed tidal work, other than a work, other than a sign erected or placed for safety
sign erected or placed for safety reasons or reasons or under an Act, is consistent
under an Act— with the following standards—
(a) is compatible with the character and (a) subject to paragraph (c), a sign erected or placed in position
amenity of the work’s immediate surroundings for identifying prescribed tidal work, or the owner of the work, is
and the locality within which the work is the only sign erected or placed in position for identifying the work
located; and (b) is not a dominant feature of or owner;
the work, unless the dominance is for safety (b) subject to paragraph (c), a sign erected or otherwise placed
reasons. in position for prescribed tidal work is integrated into the design
and construction of the work;
(c) if a relevant planning scheme standard is more stringent than
the standard mentioned in paragraph (a)—the relevant planning
scheme standard, to the extent it is more stringent than the
standard mentioned in paragraph (a);
(d) any other relevant planning scheme standard that is not
inconsistent with the standards mentioned in paragraphs (a), (b)
and (c).
4
Coastal Protection and Management Regulation 2003 – Schedule 4A – IDAS code for the development of prescribed tidal work
Page 5
Earthwork and vegetation
7.1 Excavation and filling for prescribed tidal The earthwork and filling for the prescribed tidal work is Not applicable.
work— consistent with each relevant planning scheme standard.
(a) is carried out only to the extent reasonably
necessary for the work; and (b) does not have
a significant adverse effect on—
(i) the natural features of the tidal water under,
within or over which the work is located; or
(ii) the level of the surface of the land under
the tidal water under, within or over which the
work is located, or any foreshores near the
work.
7.2 The location of prescribed tidal work The vegetation in the tidal water, under within or over which the No marine plants are present at the proposed sites. If
ensures vegetation is cleared or disturbed only prescribed tidal work is located, or on land under the tidal water, marine plants become established in these locations
to the extent reasonably necessary for the is cleared or disturbed in a way consistent with each relevant prior to installation, reef units are to be relocated.
work. planning scheme standard.
7.3 Any vegetation damaged, destroyed or Vegetation affected by the prescribed tidal work is dealt with in a Not applicable.
removed by prescribed tidal work under, within way consistent with the following standards—
or over tidal water other than an artificial (a) subject to paragraph (b), vegetation damaged, destroyed or
waterway, is replaced with appropriate removed by prescribed tidal work is replaced with native
vegetation. vegetation for the locality within which the work is located, to the
extent it is reasonably practicable to replace the vegetation with
native vegetation;
(b) if a relevant planning scheme standard is more stringent than
the standard mentioned in paragraph (a)—the relevant planning
scheme standard, to the extent it is more stringent than the
standard mentioned in paragraph (a); (c) any other relevant
planning scheme standard that is not inconsistent with the
standards mentioned in paragraphs (a) and (b).
5
Coastal Protection and Management Regulation 2003 – Schedule 4A – IDAS code for the development of prescribed tidal work
Page 6
Public access - availability
8.1 Prescribed tidal work does not have a The design and construction of the prescribed tidal work is Public access specifically within the footprint of the
significant adverse effect on the availability of consistent with the following standards— structure is limited as oyster reefs cannot be walked
public access to foreshores, including public (a) subject to paragraph (b), prescribed tidal work does not on directly, but as the footprint is small they do not
access proposed in the relevant planning involve the erection or placement of any physical barrier prevent public access either to the foreshore from the
scheme. preventing existing access, along a public access way, to the water or along the foreshore.
foreshores near the work;
(b) if a relevant planning scheme standard is more stringent than
the standard mentioned in paragraph (a)—the relevant planning
scheme standard, to the extent it is more stringent than the
standard mentioned in paragraph (a);
(c) any other relevant planning scheme standard that is not
inconsistent with the standards mentioned in paragraphs (a) and
(b).
Public access - safety
9.1 The location and design of prescribed Public access to foreshores near the prescribed tidal work is Oyster shells can be sharp, particularly for people
tidal work does not adversely affect the safety consistent with each relevant planning scheme standard. walking or wading barefoot on the foreshore. As the
of members of the public accessing the reef units are in the intertidal range, they may be
foreshores. emerged or submerged. The following has been
incorporated in the design of the works to mitigate
these risks:
- Oyster shells to be encapsulated in coir bags to
limit exposure of sharp edges in the short term.
As the oyster reefs develop into natural reef
systems and the coir deteriorates this benefit will
be reduced, but by this time it is expected that the
oyster reefs will be a more recognised part of the
natural Noosa River environment and public
awareness will have increased.
- Coir bags have apertures sufficiently small to
retain whole oyster shells (and prevent scattering
of shells across the seabed)
- Coir bags are stacked and clustered to minimise
the initial area of the reef units and trigger
awareness of the presence of reef units.
- Coir bags are secured to the seabed to reduce the
risk of migration of the coir bags into other areas
as a result of waves or flows.
- Adopted water depths are such that reef units are
expected to be visible during periods of
6
Coastal Protection and Management Regulation 2003 – Schedule 4A – IDAS code for the development of prescribed tidal work
Page 7
reasonably water clarity (when use of the
foreshore is more likely).
- Reef units have been located away from popular
recreation areas and often in areas with limited
accessibility, where usage of the foreshore is low.
At Site 16 (Lake Weyba) it has been located at the
northernmost end of the foreshore.
- As the project intends to reinstate a small part of
what was previously extensive oyster reef habitat,
these risks are not new to the Noosa River system
and would be at a much smaller scale to what was
previously experienced.
Navigable access to, or egress from, non-tidal work lots
10.1 Prescribed tidal work does not adversely The design and construction of the prescribed tidal work is The proposed works do not extend across private
affect navigable access to, or navigable egress consistent with the following standards— property side boundaries.
from, any non-tidal work lot. (a) subject to paragraph (b), if the lot connected to prescribed
tidal work (the connected lot) adjoins a non-tidal work lot, the
work does not extend past the connected lot’s side boundary, or
extended side boundary, adjoining the non-tidal
lot;
(b) if a relevant planning scheme standard is more stringent than
the standard mentioned in paragraph (a)—the relevant planning
scheme standard, to the extent it is more stringent than the
standard mentioned in paragraph (a).
7
Coastal Protection and Management Regulation 2003 – Schedule 4A – IDAS code for the development of prescribed tidal work
Page 8
Infrastructure, including access, parking, sewerage and water services
11.1 Prescribed tidal work has appropriate The infrastructure for prescribed tidal work is consistent with The nature and scale of the work is such that
infrastructure, including, in particular, road each relevant planning scheme standard. infrastructure is not required.
access, parking facilities, sewerage services
and water services, having regard to—
(a) the nature and scale of the work; and
(b) the number of people that may be on or at
the work at any time; and
(c) the number of vehicles that may be on or
moored at the work at any time; and
(d) the protection of any foreshores near the
work and the vegetation and marine plants on
the foreshores.
8
Coastal Protection and Management Regulation 2003 – Schedule 4A – IDAS code for the development of prescribed tidal work
Page 9
Design, construction and safety - all prescribed tidal work
12.1 Prescribed tidal work is designed and The design and construction of the prescribed tidal work is a) The works are consistent with the building and
constructed in a way to ensure it is structurally consistent with the following standards— engineering standards for tidal works as far as
sound, having regard to the following— (a) subject to paragraph (b), each Australian Standard relevant possible.
(a) relevant engineering standards; to the design or construction of structures, to the extent - To achieve its purpose, it is not desirable for
(b) the location of the work; requirements stated in the Standard apply to the design or the works to extend above high tide.
(c) the purpose for which the work is to be construction of prescribed tidal work; - As materials are biodegradable its structural
used; (b) if a relevant planning scheme standard is more stringent than
capacity over time may vary depending on
(d) the impact of flooding, tidal influences and any standard mentioned in paragraph (a)—the relevant planning
the success of oyster recruitment.
hydrodynamic changes. scheme standard, to the extent it is more stringent than the
standard mentioned in paragraph (a). b) Locations have been selected by the University of
Sunshine Coast based on historical oyster areas,
high oyster spat recruitment potential, low
sedimentation as well as being clear of areas of
recreational usage and navigation channels. The
design is compatible with the locations, seabed
types and water depths.
c) The purpose of the works is to restore natural
habitat. This has been taken into consideration in
the selection of sites, the design of the units and
the selection of biodegradable materials.
Design considers the local tidal range, tidal and flood
velocities and waves generated from vessels and wind
across the available fetch. Stability is based on
conservative assumptions; results of physical model
testing of anchored units is not yet available.
12.2 Prescribed tidal work does not adversely The design and construction of the prescribed tidal work is
affect the structural integrity of any existing consistent with the following standards—
revetment or seawall or another existing (a) subject to paragraph (b), prescribed tidal work, including any The proposed works are not in close proximity to any
structure. shore abutment, piling or other structure connected with the existing revetments, seawalls or other structures. The
work— scale of the proposed works is also relatively low. No
(i) does not place an additional load on any existing revetment adverse effects are anticipated.
or seawall or another existing structure; or
(ii) can be structurally supported by an existing revetment or
seawall or another existing structure;
(b) if a relevant planning scheme standard is more stringent than
the standard mentioned in paragraph (a)—the relevant planning
scheme standard, to the extent it is more stringent than the
standard mentioned in paragraph (a).
9
Coastal Protection and Management Regulation 2003 – Schedule 4A – IDAS code for the development of prescribed tidal work
Page 10
12.3 Prescribed tidal work is designed and The design and construction of the prescribed tidal work is No bank survey is available, however available aerial
constructed in a way to ensure it does not consistent with the following standards— imagery (2008 – 2016) indicates that adjacent
adversely affect the stability of the bed and (a) subject to paragraph (b), prescribed tidal work does not foreshores are not experiencing significant long-term
banks of any tidal water. cause, by changing the flow of water, the removal of, or change and this is consistent with the lack of erosion
disturbance to, the sediment on the bed and banks of any tidal scarps evident.
water;
(b) if a relevant planning scheme standard is more stringent than
Similar units have historically been utilised to provide
the standard mentioned in paragraph
a)—the relevant planning scheme standard, to the extent it is protection to areas subject to wave erosion. As such,
more stringent than the standard mentioned in paragraph (a). these units may result in accretion of the adjacent
foreshore although it is expected that tidal and flood
flows are dominant in most locations.
No modelling has been undertaken, however it is
expected that impacts would be relatively low given
the location close to the bank and the relatively small
footprint of the works. The units are angled to the
peak flood velocity to reduce impacts and oriented to
deflect ebb tide and peak flood flows toward the
channel (rather than toward the bank) to avoid
concentrating flows which might result in erosion of the
riverbank.
Localised build-up & scour is expected however the
proposed works are flexible and able to accommodate
minor changes. The majority of the sites appear
relatively stable with no sand ripples although aerial
photography indicates that they can be subject to
change. Significant sedimentation to the point of
burial is not expected. Sites 9 & 10 could potentially
experience the greatest changes, particularly in the
event of re-opening of the channel along the western
bank.
The works incorporate quarterly monitoring for the first
3 years and if any erosion or excessive accretion are
observed these can be evaluated and the reef units
can be modified, relocated or removed if necessary.
10
Coastal Protection and Management Regulation 2003 – Schedule 4A – IDAS code for the development of prescribed tidal work
Page 11
12.4 Prescribed tidal work is designed and The design and construction of the prescribed tidal work is The permanent oyster reef is composed of oyster
constructed using materials having a long life consistent with the following standards— shells, which are resistant to attack by marine
in marine environments, having regard to their (a) subject to paragraph (b), each Australian Standard relevant organisms, corrosion, abrasion and immersion in
ability to resist the following— to the materials that should be used, or the measures that seawater.
(a) attack by marine organisms; should be taken to treat materials used, for structures,
(b) corrosion; to the extent the requirements stated in the Standard apply to Once established, the recruited oysters on the reef will
(c) deterioration resulting from abrasion or structures located in a marine environment; cement the reef together providing stability to the
immersion in seawater. (b) if a relevant planning scheme standard is more stringent than oyster shell substrate although the rate of oyster
the standard mentioned in paragraph (a)—t e relevant planning recruitment is also unknown and likely variable
scheme standard, to the extent it is more stringent than the between sites.
standard mentioned in paragraph (a).
During the initial recruitment period, stability is
provided by temporary materials (Coir, Manilla Rope &
Timber). These materials are biodegradable and do
not form part of the permanent structure. The life
expectancy for typical coir logs of this size is nominally
2 – 3 years however for periodically submerged coir
bags filled with oyster shell this could potentially be
shorter and is expected to vary between sites.
Where recruitment and cementing of the reef substrate
is adequate, reefs will successfully become
established prior to degradation of the coir product. In
cases where recruitment or cementing of the reef unit
is too low, reefs may not become successfully
established within this timeframe and oyster shell may
become uncontained.
Coir is naturally resistant to abrasion, however the risk
of damage is further reduced by filling the bags using a
sleeve and ensuring the bags are well packed to
prevent migration of shells within the bag.
The works incorporate quarterly monitoring for the first
3 years and if any erosion or excessive accretion are
observed these can be evaluated and the reef units
can be modified, relocated or removed if necessary.
11
Coastal Protection and Management Regulation 2003 – Schedule 4A – IDAS code for the development of prescribed tidal work
Page 12
12.5 Prescribed tidal work is designed and The design and construction of the prescribed tidal work is
constructed in a way to ensure it does not consistent with the following standards—
adversely affect the operation or maintenance (a) subject to paragraph (c), vessels moored at prescribed tidal The proposed sites are a significant distance from
of any existing stormwater outlet. work do not impede the discharge of existing stormwater outlets. Minimum distance for Site
stormwater; 13 is 60m. No impact is anticipated.
(b) subject to paragraph (c), prescribed tidal work does not
restrict access to any stormwater outlet;
(c) if a relevant planning scheme standard is more stringent than
the standard mentioned in paragraph (a) or (b)—the relevant
planning scheme standard, to the extent it is more stringent than
the standard mentioned in paragraph (a) or (b).
12.6 Prescribed tidal work is designed and The design and construction of the prescribed tidal work is The proposed works are designed to minimise the
constructed in a way to ensure it does not consistent with the following standards— potential impact on water quality.
adversely affect the water quality of any tidal (a) subject to paragraph (b), each Australian Standard relevant
water, including, in particular, as a result of— to the design or construction of structures under, within or over a. Release of materials into tidal water is limited
(a) release, into the tidal water, of materials tidal water, to the extent the requirements stated in the Standard to the physical placement of the coir reef
used in the construction of the work; or are directed at maintaining the water quality of tidal water; units in accordance with the design. All
(b) disturbance to the sediment on the bed and (b) if a relevant planning scheme standard is more stringent than excess materials, damaged components,
banks of the tidal water; or the standard mentioned in paragraph (a)—the relevant planning loose oyster shell or other debris from the
(c) exposure to acid sulphate soils. scheme standard, to the extent it is more stringent than the works is to be removed from site.
standard mentioned in paragraph (a).
b. Disturbance of sediment is limited to driving
timber stakes into the seabed to anchor the
units. While embedment of the oyster reefs
would be beneficial to the overall stability of
the base units, no removal of sediment is
proposed.
c. No sediments are to be disturbed and so Acid
Sulfate Soils will not be exposed.
12.7 Prescribed tidal work is designed and The design and construction of the prescribed tidal work is This is not relevant as the work is not intended to be
constructed in a way to ensure it is safe for consistent with the following standards— walked on.
persons standing or walking on the work. (a) subject to paragraph (c), any surface of prescribed tidal work
on which a person may stand or walk is—
(i) not slippery; and
(ii) does not have any feature that may cause the person to trip
or fall;
(b) subject to paragraph (c), any part of prescribed tidal work
that is unsafe for persons standing or walking on the work is
surrounded by adequate barriers to deter persons from entering
the part; (c) if a relevant planning scheme standard is more
stringent than the standard mentioned in paragraph (a) or (b)—
12
Coastal Protection and Management Regulation 2003 – Schedule 4A – IDAS code for the development of prescribed tidal work
Page 13
the relevant planning scheme standard, to the extent it is
more stringent than the standard mentioned in paragraph (a) or
(b).
12.8 Appropriate measures are taken for The design and construction of the prescribed tidal work is This is not relevant as the work is not intended to be
prescribed tidal work for a non-private purpose consistent with the following standards— (a) subject to walked on.
to ensure an unsupportable live load is not paragraph (b), prescribed tidal work has erected or placed in
applied to the work by persons or vehicles. position on or near the work, a sign that—
(i) is visible at all times; and (ii) states the maximum live load
that may be applied to the work, in terms of the maximum
number of persons that may be on the work at any given time
or the maximum number of vehicles of a particular type
that may be on or moored at the work at any given time;
(b) if a relevant planning scheme standard is more stringent than
the standard mentioned in paragraph (a)—the relevant planning
scheme standard, to the extent it is more stringent than the
standard mentioned in paragraph (a).
12.9 Prescribed tidal work, other than a The design and construction of the prescribed tidal work is The reefs are all located outside of canals
boardwalk or an independent deck consistent with each relevant planning scheme standard.
for a private purpose, is designed and
constructed in a way that ensures the use of
tidal water in a canal for a non-maritime
purpose is minimised.
13
Coastal Protection and Management Regulation 2003 – Schedule 4A – IDAS code for the development of prescribed tidal work
Page 14
12.10 Prescribed tidal work that is a boardwalk (s 6(2) solution) Not applicable
or an independent deck and for a private The design and construction of the boardwalk or deck is
purpose, is designed and constructed in a way consistent with the following standards—
that ensures the use of tidal water in a canal (a) subject to paragraph (c), a boardwalk or independent deck
for a non-maritime purpose is minimised. does not extend more than 3m from the waterfront boundary of
the lot connected to the boardwalk or deck; (b) subject to
paragraph (c), a boardwalk or independent deck is at least 3m
inside of the side boundary or extended side boundary of the lot
connected to the boardwalk or deck; (c) if a relevant planning
scheme standard is more stringent than the standard mentioned
in paragraph (a) or (b)—the relevant planning scheme standard,
to the extent it is more stringent than the standard mentioned in
paragraph (a) or (b).
Design, construction and safety - boat ramps and slip ways for private purpose
13.1 Prescribed tidal work that is a private (s 6(2) solution) Not applicable
boat ramp or private slip way is designed and The design and construction of the boat ramp or slip way is
constructed in a way to ensure it is structurally consistent with the following standards—
sound while also ensuring the top of each wall (a) subject to paragraph (c), the walls at the edge of a boat ramp
at the edge of the boat ramp or slip way is or slip way penetrate into the earth at least 600mm below the
level with the surface of the land on which the surface of the land on which the boat ramp or slip
boat ramp or slip way is located. way is located;
(b) subject to paragraph (c), the surface of a boat ramp or slip
way is no more than 200mm above the surface of the land on
which it is located;
(c) if a relevant planning scheme standard is more stringent than
the standard mentioned in paragraph (a) or (b)—the relevant
14
Coastal Protection and Management Regulation 2003 – Schedule 4A – IDAS code for the development of prescribed tidal work
Page 15
planning scheme standard, to the extent it is more stringent than
the standard mentioned in paragraph (a) or (b).
13.2 Prescribed tidal work that is a private (s 6(2) solution) Not applicable
boat ramp or private slip way is designed and The design and construction of the boat ramp or slip way is
constructed in a way to ensure the safe consistent with the following standards—(a) subject to paragraph
movement of vehicles or persons over the boat (d), the upper surface of a boat ramp or slip way has a width of
ramp or slip no less than 3.6m; (b) subject to paragraph (d), the whole
way. upper surface of a boat ramp or slip way is treated to prevent it
from becoming slippery by using any of the following methods—
(i) forming grooves over the surface, as close as possible to
40mm wide, 20mm deep and 150mm apart, and at an angle
as close as possible to 70º to the centre-line of the boat ramp or
slip way; (ii) covering the surface with a substance ordinarily
used on slippery surfaces to prevent
skidding; (iii) making, through a physical act, the surface coarse
before it sets, including, for example, by raking the surface;
(c) subject to paragraph (d), the upper surface of a boat ramp or
slip way for which a winch is not used to hoist or haul vessels
onto the boat ramp or slip way is at a gradient of not steeper
than— (i) if the surface is treated by using a method mentioned
in paragraph (b)(i) or (ii)—1:8; or (ii) otherwise—1:10;
(d) if a relevant planning scheme standard is more stringent than
the standard mentioned in paragraph (a), (b) or (c)—the relevant
planning scheme standard, to the extent it is more stringent than
the standard mentioned in paragraph (a), (b) or (c).
Design, construction and safety - bridges
14.1 Prescribed tidal work that is a bridge does The design and construction of the bridge, including any Not applicable
not adversely affect existing public use of any abutment connected with the bridge, is consistent with the
tidal water, including, for example, use of the following standards— (a) subject to paragraph (b), the clearance
tidal water for canoeing, swimming or other levels under a bridge are high enough to allow continued
recreational activities. public use of any tidal water over which it is constructed;
(b) if a relevant planning scheme standard is more stringent than
the standard mentioned in paragraph (a)—the relevant planning
scheme standard, to the extent it is more stringent than the
standard mentioned in paragraph (a).
15
Coastal Protection and Management Regulation 2003 – Schedule 4A – IDAS code for the development of prescribed tidal work
Page 16
14.2 Prescribed tidal work that is a bridge The design and construction of the bridge is consistent with the Not applicable
does not adversely affect the flow of water following standards—
under the bridge. (a) subject to paragraph (b)— (i) if a bridge can be adequately
supported without erecting or placing a foundation support in
tidal water—no foundation support to support the bridge is
erected or placed in the tidal water; or
(ii) otherwise—only the minimum number of foundation supports
required to support the bridge is used;
(b) if a relevant planning scheme standard is more stringent than
the standard mentioned in paragraph (a)—the relevant planning
scheme standard, to the extent it is more stringent than the
standard mentioned in paragraph (a).
Design, construction and safety - boardwalks and independent decks
15.1 Prescribed tidal work that is a boardwalk (s 6(2) solution) Not applicable
or an independent deck and for a private The design and construction of the boardwalk or deck is
purpose is designed and constructed in a way consistent with the following standards—
to ensure it is able to support its intended (a) subject to paragraph (d), a boardwalk or independent deck
loads, having regard to its relevant loading accessible to vehicular traffic is able to support at least a live
matters. load of 3.0kPa plus an axle load of 10kN; (b) subject to
paragraph (d), a boardwalk or independent deck that
is not accessible to vehicular traffic and that is for individual use
is able to support at least a live load of 2.0kPa;
(c) subject to paragraph (d), a boardwalk or independent deck
16
Coastal Protection and Management Regulation 2003 – Schedule 4A – IDAS code for the development of prescribed tidal work
Page 17
that is not accessible to vehicular traffic and that is for group use
is able to support at least a live load of 3.0kPa; (d) if a relevant
planning scheme standard is more stringent than the
standard mentioned in paragraph (a), (b) or (c)—the relevant
planning scheme standard, to the extent it is more stringent than
the standard mentioned in paragraph (a), (b) or (c).
15.2 Prescribed tidal work that is a boardwalk (s 6(2) solution) The design or construction of the boardwalk or Not applicable
or an independent deck and for a non-private deck is consistent with the following standards—
purpose is designed and constructed in a way (a) subject to paragraph (c), a boardwalk or independent deck
to ensure it is able to support its intended accessible to vehicular traffic is able to support at least the
loads, having regard to its relevant loading following— (i) a distributed live load of 5.0kPa; (ii) a
matters. concentrated live load of 4.5kN; (iii) the load of the largest
vehicle capable of being on the boardwalk or deck;
(b) subject to paragraph (c), a boardwalk or independent deck
not accessible to vehicular traffic is able to support at least the
following— (i) a distributed live load of 5.0kPa;
(ii) a concentrated live load of 4.5kN; c) if a relevant planning
scheme standard is more stringent than the standard mentioned
in paragraph (a) or (b)—the relevant planning scheme standard,
to the extent it is more stringent than the standard mentioned in
paragraph (a) or (b).
15.3 Prescribed tidal work that is a boardwalk The design and construction of the boardwalk or deck is Not applicable
or an independent deck does not prevent or consistent with the following standards—
hinder remedial work being undertaken on any (a) subject to paragraph (b), a boardwalk or independent deck
bank of tidal water or for any existing retaining either— (i) can be easily dismantled and reassembled; or
wall, revetment or seawall or another existing (ii) does not restrict the movement of machinery ordinarily used
structure. for remedial work to any bank of tidal water or any existing
retaining wall, revetment or seawall or other existing
structure; (b) if a relevant planning scheme standard is more
stringent than the standard mentioned in paragraph (a)—the
relevant planning scheme standard, to the extent it is more
stringent than the standard mentioned in paragraph (a).
Design, construction and safety - jetties and piers
Prescribed tidal work that is a jetty or The design and construction of the jetty Not applicable
pier and for a private purpose is designed and or pier is consistent with the following
constructed in a way to ensure it is able to standards—
support its intended loads, having regard to its (a) subject to paragraph (d), a jetty or pier accessible to
relevant loading matters. vehicular traffic is able to support at least a live load of
3.0kPa plus an axle load of 10kN; (b) subject to paragraph (d), a
jetty or pier that is not accessible to vehicular traffic and that is
for individual use is able to support at least a live load of 2.0kPa;
(c) subject to paragraph (d), a jetty or pier that is not accessible
to vehicular traffic and that is for group use is able to support at
17
Coastal Protection and Management Regulation 2003 – Schedule 4A – IDAS code for the development of prescribed tidal work
Page 18
least a live load of 3.0kPa; (d) if a relevant planning scheme
standard is more stringent than the standard mentioned in
paragraph (a), (b) or (c)—the relevant planning scheme
standard, to the extent it is more stringent than the standard
mentioned in paragraph (a), (b) or (c).
16.2 Prescribed tidal work that is a jetty or The design and construction of the jetty or pier is consistent with Not applicable
pier and for a non-private purpose is designed the following standards—
and constructed in a way to ensure it is able to (a) subject to paragraph (c), a jetty or pier accessible to
support its intended loads, having regard to its vehicular traffic is able to support at least the following—
relevant loading matters. (i) a distributed live load of 5.0kPa; (ii) a concentrated live load of
4.5kN; (iii) the load of the largest vehicle capable of being on or
moored at the jetty or pier; (b) subject to paragraph (c), a jetty or
pier not accessible to vehicular traffic is able to support at least
the following— (i) a distributed live load of 5.0kPa; (ii) a
concentrated live load of 4.5kN;
(c) if a relevant planning scheme standard is more stringent than
the standard mentioned in paragraph (a) or (b)—the relevant
planning scheme standard, to the extent it is more stringent than
the standard mentioned in paragraph (a) or (b).
16.3 Prescribed tidal work that is a jetty or The design and construction of the jetty or pier is consistent with Not applicable
a pier is designed and constructed in a way to the following standards—
ensure it remains above water at all times. (a) subject to paragraph (b), either— (i) the level of the deck of a
jetty or pier is at least 300mm above the water at highest
astronomical tide; or (ii) piles or other markers indicate
the presence of the jetty or pier when it is inundated;
(b) if a relevant planning scheme standard is more stringent than
the standard mentioned in paragraph (a)—the relevant planning
scheme standard, to the extent it is more stringent than the
standard mentioned in paragraph (a).
18
Coastal Protection and Management Regulation 2003 – Schedule 4A – IDAS code for the development of prescribed tidal work
Page 19
16.4 Prescribed tidal work that is a jetty or pier The design and construction of the jetty or pier is consistent with Not applicable
and for a private purpose is designed and the following standards—
constructed in a way to ensure it is of a size (a) subject to paragraph (b), all parts of the deck of a jetty or pier
suitable for maritime use while still minimising have a width of at least 900mm and not more than 3m;
the amount of tidal water occupied by it. (b) if a relevant planning scheme standard is more stringent than
the standard mentioned in paragraph (a)—the relevant planning
scheme standard, to the extent it is more stringent than the
standard mentioned in paragraph (a).
Design, construction and safety - Pipelines and other underground services
17.1 The design and construction of The design and construction of the pipeline or underground Not applicable
prescribed tidal work that is a pipeline, or service is consistent with the following standards—
another underground service used instead of a (a) subject to paragraph (b), a pipeline or other underground
pipeline, does not adversely affect the ability service is installed at least 1.2m below the surface of land, after
of vessels to be anchored near the work. it is installed;
(b) if a relevant planning scheme standard is more stringent than
the standard mentioned in paragraph (a)—the relevant planning
scheme standard, to the extent it is more stringent than the
standard mentioned in paragraph (a).
19
Coastal Protection and Management Regulation 2003 – Schedule 4A – IDAS code for the development of prescribed tidal work
Page 20
Design, construction and safety - pontoons
18.1 Prescribed tidal work that is a pontoon, The design and construction of the pontoon is consistent with Not applicable
for a private purpose, and not used only for the following standards—
rowing, is designed and constructed in a way (a) subject to paragraph (c), a pontoon for individual use is able
to ensure it is able to support its intended to support at least a live load of 1.5kPa; (b) subject to paragraph
loads, having regard to its relevant loading (c), a pontoon for group use is able to support at least a live load
matters. of 2.0kPa; (c) if a relevant planning scheme standard is more
stringent than the standard mentioned in paragraph (a) or (b)—
the relevant planning scheme standard, to the extent it is
more stringent than the standard mentioned in paragraph (a) or
(b).
18.2 Prescribed tidal work that is a pontoon, The design and construction of the pontoon is consistent with Not applicable
for a non-private purpose, and not used only the following standards—
for rowing, is designed and constructed in a (a) subject to paragraph (c), a pontoon open for use by the
way to ensure it is able to support its intended general public or used for a commercial purpose is able to
loads, having regard to its relevant loading support at least the following— (i) a distributed live load of
matters. 3.0kPa; (ii) a concentrated live load of 4.5kN;
(b) subject to paragraph (c), a pontoon other than a pontoon
mentioned in
paragraph (a) is able to support at least the following—
(i) a distributed live load of 2.0kPa; (ii) a concentrated live load of
4.5kN;
(c) if a relevant planning scheme standard is more stringent than
the standard mentioned in paragraph (a) or (b)—the relevant
planning scheme standard, to the extent it is more stringent than
the standard mentioned in paragraph (a) or (b).
18.3 Prescribed tidal work that is a pontoon The design and construction of the pontoon is consistent with Not applicable
and used only for rowing is designed and the following standards—
constructed in a way to ensure— (a) subject to paragraph (c), the access walkway of a pontoon
(a) it is able to support its intended loads, used only for rowing is able to support at least a live load of
having regard to its relevant loading matters; 3.0kPa;
and (b) the flotation unit of a pontoon used only for rowing is able to
(b) it is safe for persons using the support at least a live load of 1.5kPa;
pontoon to launch and retrieve (c) if a relevant planning scheme standard is more stringent than
rowing vessels. the standard mentioned in paragraph (a) or (b)—the relevant
planning scheme standard, to the extent it is more stringent than
the standard mentioned in paragraph (a) or (b).
18.4 Prescribed tidal work that is a pontoon is The design and construction of the pontoon is consistent with Not applicable
designed and constructed in a way to ensure the following standards—
any load applied to the pontoon by a person or (a) subject to paragraph (f), a pontoon’s access walkway
thing on the pontoon does not cause the extends at least 500mm onto the pontoon’s flotation unit;
pontoon to tip over or tilt to a degree causing (b) subject to paragraph (f), a pontoon’s access walkway is
the person or thing to fall off the pontoon. constructed with a material that has a non-slippery surface;
20
Coastal Protection and Management Regulation 2003 – Schedule 4A – IDAS code for the development of prescribed tidal work
Page 21
(c) for a pontoon used only for rowing—subject to paragraph (f),
at least 75mm of the height of the pontoon’s flotation unit
remains above the water over which it is constructed if a
distributed live load is applied to half of the surface of
the pontoon’s flotation unit and all of the surface of the pontoon’s
access walkways;(d) for a pontoon other than a pontoon
mentioned in paragraph (c)—subject to paragraph (f), the top
surface of the pontoon’s flotation unit remains above the water
over which it is constructed if a distributed live load of 1.5kPa is
applied to half of the surface of the pontoon’s flotation unit and
all of the surface of the pontoon’s access walkways;
(e) subject to paragraph (f), the whole base of the pontoon’s
flotation unit remains in contact with the water over which it is
constructed at all times and tilts no more than 15º at any time;
(f) if a relevant planning scheme standard is more stringent than
the standard mentioned in paragraph (a), (b), (c), (d) or (e)—the
relevant planning scheme standard, to the extent it is more
stringent than the standard mentioned in paragraph (a),
(b), (c), (d) or (e).
18.5 Prescribed tidal work that is a pontoon is The design and construction of the pontoon is consistent with Not applicable
designed and constructed in a way to ensure it the following standards—
remains above the water at all times. (a) subject to paragraph (b), the pontoon’s abutment is located
no less than 300mm above the water at high water mark;
(b) if a relevant planning scheme standard is more stringent than
the standard mentioned in paragraph (a)—the relevant planning
scheme standard, to the extent it is more stringent than the
standard mentioned in paragraph (a).
21
Coastal Protection and Management Regulation 2003 – Schedule 4A – IDAS code for the development of prescribed tidal work
Page 22
18.6 Prescribed tidal work that is a pontoon is The design and construction of the pontoon is consistent with Not applicable
designed and constructed in a way to ensure the following standards—
the pontoon’s flotation unit will rise and fall to (a) for a pontoon located in an area prone to flooding—subject to
allow for changes in tidal water paragraph (c), the pontoon’s flotation unit is moored by piles;
levels. (b) for a pontoon other than a pontoon mentioned in paragraph
(a)—subject to paragraph (c), the pontoon’s flotation unit is—
(i) attached, through the pontoon’s system for mooring the unit,
to concrete anchors in the bank landward of the pontoon; or
(ii) moored by piles; (c) if a relevant planning scheme
standard is more stringent than the standard mentioned in
paragraph (a) or (b)—the relevant planning scheme standard, to
the extent it is more stringent than the standard mentioned in
paragraph (a) or (b).
22
Coastal Protection and Management Regulation 2003 – Schedule 4A – IDAS code for the development of prescribed tidal work
Page 23
Design, construction and safety – retaining walls, revetments and seawalls
19.1 Prescribed tidal work that is a retaining The design and construction of the retaining wall, revetment or Not applicable
wall, revetment or seawall, is designed and seawall is consistent with the following standards—
constructed in a way to ensure it is able to (a) subject to paragraph (b), a retaining wall, revetment or
support its intended loads, having regard to its seawall is able to support at least a distributed live
relevant loading matters. load of 3.0kPa;
(b) if a relevant planning scheme standard is more stringent than
the standard mentioned in paragraph (a)—the relevant planning
scheme standard, to the extent it is more stringent than the
standard mentioned in paragraph (a).
19.2 Prescribed tidal work that is a retaining The design and construction of the retaining wall, revetment or Not applicable
wall, revetment or seawall, is designed and seawall is consistent with the following
constructed in a way to ensure it can standards—
withstand— (a) subject to paragraph (c), a retaining wall, revetment or
(a) any tendency of overturning or sliding; and seawall has a factor of safety of no less than 1.5;
(b) any other effects of waves or changes in (b) subject to paragraph (c), a retaining wall, revetment or
water levels on the retaining wall, revetment or seawall is able to withstand the effect of waves, or waves and
seawall. water levels, resulting from a storm or other natural event
of a magnitude that has a 2% or lower probability of occurring in
any calendar year;
(c) if a relevant planning scheme standard is more stringent than
the standard mentioned in paragraph (a) or (b)—the relevant
planning scheme standard, to the extent it is more stringent than
the standard mentioned in paragraph (a) or (b).
19.3 Prescribed tidal work that is a retaining The design and construction of the retaining wall, revetment or Not applicable
wall, revetment or seawall not founded upon seawall is consistent with the following standards—
rock, is designed and constructed to protect (a) subject to paragraph (c), a retaining wall, revetment or
the seaward side of retaining wall, revetment seawall provides for a sub-layer or enough filter material to
or seawall from erosion. ensure it is reasonably likely to remain in place for at least
50 years;
(b) subject to paragraph (c), the bottom edge of the base of a
retaining wall, revetment or seawall is reasonably likely to
prevent any adverse effects from potential erosion of the soil
under the retaining wall, revetment or seawall for at least 50
years;
(c) if a relevant planning scheme standard is more stringent than
the standard mentioned in paragraph (a) or (b)—the relevant
planning scheme standard, to the extent it is more stringent than
the standard mentioned in paragraph (a) or (b)
23
Coastal Protection and Management Regulation 2003 – Schedule 4A – IDAS code for the development of prescribed tidal work
Page 24
19.4 Prescribed tidal work that is a retaining The design and construction of the retaining wall, revetment or Not applicable
wall, revetment or seawall, is not adversely seawall is consistent with the following standards—
affected by hydrostatic pressure behind the (a) subject to paragraph (b), a retaining wall, revetment or
retaining wall, revetment or seawall. seawall provides for drainage holes, and suitable filter material
behind the holes, to relieve any hydrostatic pressure behind the
retaining wall, revetment or seawall;
(b) if a relevant planning scheme standard is more stringent than
the standard mentioned in paragraph (a)—the relevant planning
scheme standard, to the extent it is more stringent than the
standard mentioned in paragraph (a).
24
Coastal Protection and Management Regulation 2003 – Schedule 4A – IDAS code for the development of prescribed tidal work
Page 25
Design, construction and safety -wharves
20.1 Prescribed tidal work that is a wharf is The design and construction of the wharf is consistent with the Not applicable
designed and constructed in a way to ensure it following standards—
is able to support its intended loads, having (a) subject to paragraph (c), a major wharf, or a minor wharf
regard to its relevant loading matters. accessible to vehicular traffic, is able to support at least the
following— (i) a distributed live load of 5.0kPa;
(ii) a concentrated live load of 13kN; or (b) subject to paragraph
(c), a minor wharf not accessible to vehicular traffic is able to
support at least the following— (i) a distributed live load of
5.0kPa; or (ii) a concentrated live load of 4.5kN; or
(c) if a relevant planning scheme standard is more stringent than
the standard mentioned in paragraph (a) or (b)—the relevant
planning scheme standard, to the extent it is more stringent than
the standard mentioned in paragraph (a) or (b).
25
Coastal Protection and Management Regulation 2003 – Schedule 4A – IDAS code for the development of prescribed tidal work