Enclosure 4 - Schedule 4a

Attached to the e-mail Operational Works Application OPW17/0016.

of 25

Page text shows just the words. Original shows the document exactly as it was published.

                                                 Character and amenity (generally)—prescribed tidal work not in a canal
 2.1 Prescribed tidal work not in a canal and for The design and construction of the prescribed tidal work is         The proposed work is not for a private purpose.
 a private purpose is compatible with its         consistent with the following standards—
 location, having regard to the following—        (a) subject to paragraph (e), prescribed tidal work does not
 (a) the character and amenity of the work’s      extend past the side boundary or extended side boundary of the
 immediate surroundings and the locality within   lot connected to the work;
 which the work is located;                       (b) subject to paragraph (e), prescribed tidal work is the only
 (b) if the relevant planning scheme states the   work of its type along the edge of the tidal water fronting the lot
 desired character or amenity for the work’s      connected to the work;
 immediate surroundings or the locality within    (c) subject to paragraph (e), prescribed tidal work that is a
 which the work is located—the stated desired     boardwalk or independent deck is not roofed;
                                                  (d) subject to paragraph (e), prescribed tidal work other than a
                                                  boardwalk or deck is not roofed unless it is the main access to
                                                  land;
                                                  (e) if a relevant planning scheme standard is more stringent than
                                                  the standard mentioned in paragraph (a), (b), (c) or (d)—the
                                                  relevant planning scheme standard, to the extent it is more
                                                  stringent than the standard mentioned in paragraph (a), (b), (c)
                                                  or (d);
                                                  (f) any other relevant planning scheme standard that is not
                                                  inconsistent with the standards mentioned in paragraphs (a) to
                                                  (e).
 2.2 Prescribed tidal work not in a canal and for The design and construction of the prescribed tidal work is         The proposed work is compatible with is location,
 a non-private purpose is compatible with its     consistent with the following standards—                            being the reinstatement of previously naturally-
 location, having regard to the following—        (a) subject to paragraph (c), prescribed tidal work used for a      occurring habitat.
 (a) the character and amenity of the work’s      commercial purpose does not extend past the side boundary or
 immediate surroundings and the locality within   extended side boundary of the lot connected to the work;
 which the work is located;                       (b) subject to paragraph (c), prescribed tidal work used for a
 (b) if the relevant planning scheme states the   commercial purpose is not roofed unless it is the main access to
 desired character or amenity for the work’s      land;
 immediate surroundings or the locality within    (c) if a relevant planning scheme standard is more stringent than
 which the work is located—the stated desired     the standard mentioned in paragraph (a) or (b)—the relevant
 character or amenity.                            planning scheme standard, to the extent the standard is more
                                                  stringent than the standard mentioned in paragraph (a) or (b);
                                                  (d) any other relevant planning scheme standard that is not
                                                  inconsistent with the standards mentioned in paragraphs (a) to
                                                  (c).




                                                                                                                                                                          2
Coastal Protection and Management Regulation 2003 – Schedule 4A – IDAS code for the development of prescribed tidal work
Log in to download the original file

Enclosure 4 - Schedule 4a.pdf · 415 KB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.