Original source · versioned page text
Enclosure 4 - Schedule 4a
Attached to the e-mail Operational Works Application OPW17/0016.
Schedule 4A.
Part 3 Specific outcomes and probable solutions
Specific outcome A probable solution Comment
Character and amenity (generally)—prescribed tidal work in a canal
1.1 Prescribed tidal work in a canal and The design and construction of the prescribed tidal work is Not applicable
for a private purpose is compatible consistent with the following standards—
with its location, having regard to the (a) subject to paragraph (c), prescribed tidal work does not
following— extend past the side boundary or extended side boundary of the
(a) the character and amenity of the lot connected to the work;
work’s immediate surroundings (b) subject to paragraph (c), prescribed tidal work is not roofed;
and the locality within which the (c) if a relevant planning scheme standard is more stringent than
work is located; the standard mentioned in paragraph (a) or (b)—the relevant
(b) if the relevant planning scheme planning scheme standard, to the extent it is more stringent
states the desired character or than the standard mentioned in paragraph (a) or (b); (d) any
amenity for the work’s other relevant planning scheme standard that is not inconsistent
immediate surroundings or the with the standards mentioned in paragraphs (a) to (c).
locality within which the work
is located—the stated desired
character or amenity.
1.2 Prescribed tidal work in a canal and for a The design and construction of the prescribed tidal work is Not applicable
non-private purpose is compatible with its consistent with the following standards—
location, having regard to the following— (a) subject to paragraph (c), prescribed tidal work used for a
(a) the character and amenity of the work’s commercial purpose does not extend past the side boundary or
immediate surroundings and the locality within extended side boundary of the lot connected to the
which the work is located; work; (b) subject to paragraph (c), prescribed tidal work is not
(b) if the relevant planning scheme states the roofed unless it is the main access to land;
desired character or amenity for the work’s (c) if a relevant planning scheme standard is more stringent than
immediate surroundings or the locality within the standard mentioned in paragraph (a) or (b)—the relevant
which the work is located—the stated desired planning scheme standard, to the extent it is more stringent than
character or amenity. the standard stated in paragraph (a) or (b); (d) any other relevant
planning scheme standard that is not inconsistent with the
standards mentioned in paragraphs (a) to (c).
1
Coastal Protection and Management Regulation 2003 – Schedule 4A – IDAS code for the development of prescribed tidal work
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.