Skip to the record
Noosa's #1 Council Tracker.

Original source · versioned page text

Enclosure 4 - Schedule 4a

Attached to the e-mail Operational Works Application OPW17/0016.

of 25

Page text shows just the words. Original shows the document exactly as it was published.

                                                   the relevant planning scheme standard, to the extent it is
                                                   more stringent than the standard mentioned in paragraph (a) or
                                                   (b).
 12.8 Appropriate measures are taken for           The design and construction of the prescribed tidal work is          This is not relevant as the work is not intended to be
 prescribed tidal work for a non-private purpose   consistent with the following standards— (a) subject to              walked on.
 to ensure an unsupportable live load is not       paragraph (b), prescribed tidal work has erected or placed in
 applied to the work by persons or vehicles.       position on or near the work, a sign that—
                                                   (i) is visible at all times; and (ii) states the maximum live load
                                                   that may be applied to the work, in terms of the maximum
                                                   number of persons that may be on the work at any given time
                                                   or the maximum number of vehicles of a particular type
                                                   that may be on or moored at the work at any given time;
                                                   (b) if a relevant planning scheme standard is more stringent than
                                                   the standard mentioned in paragraph (a)—the relevant planning
                                                   scheme standard, to the extent it is more stringent than the
                                                   standard mentioned in paragraph (a).
 12.9 Prescribed tidal work, other than a          The design and construction of the prescribed tidal work is          The reefs are all located outside of canals
 boardwalk or an independent deck                  consistent with each relevant planning scheme standard.
 for a private purpose, is designed and
 constructed in a way that ensures the use of
 tidal water in a canal for a non-maritime
 purpose is minimised.




                                                                                                                                                                                 13
Coastal Protection and Management Regulation 2003 – Schedule 4A – IDAS code for the development of prescribed tidal work
Log in to download the original file

Enclosure 4 - Schedule 4a.pdf · 415 KB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.