Enclosure 4 - Schedule 4a
Attached to the e-mail Operational Works Application OPW17/0016.
the relevant planning scheme standard, to the extent it is
more stringent than the standard mentioned in paragraph (a) or
(b).
12.8 Appropriate measures are taken for The design and construction of the prescribed tidal work is This is not relevant as the work is not intended to be
prescribed tidal work for a non-private purpose consistent with the following standards— (a) subject to walked on.
to ensure an unsupportable live load is not paragraph (b), prescribed tidal work has erected or placed in
applied to the work by persons or vehicles. position on or near the work, a sign that—
(i) is visible at all times; and (ii) states the maximum live load
that may be applied to the work, in terms of the maximum
number of persons that may be on the work at any given time
or the maximum number of vehicles of a particular type
that may be on or moored at the work at any given time;
(b) if a relevant planning scheme standard is more stringent than
the standard mentioned in paragraph (a)—the relevant planning
scheme standard, to the extent it is more stringent than the
standard mentioned in paragraph (a).
12.9 Prescribed tidal work, other than a The design and construction of the prescribed tidal work is The reefs are all located outside of canals
boardwalk or an independent deck consistent with each relevant planning scheme standard.
for a private purpose, is designed and
constructed in a way that ensures the use of
tidal water in a canal for a non-maritime
purpose is minimised.
13
Coastal Protection and Management Regulation 2003 – Schedule 4A – IDAS code for the development of prescribed tidal work