Enclosure 4 - Schedule 4a

Attached to the e-mail Operational Works Application OPW17/0016.

of 25

Page text shows just the words. Original shows the document exactly as it was published.

 12.10 Prescribed tidal work that is a boardwalk   (s 6(2) solution)                                                   Not applicable
 or an independent deck and for a private          The design and construction of the boardwalk or deck is
 purpose, is designed and constructed in a way     consistent with the following standards—
 that ensures the use of tidal water in a canal    (a) subject to paragraph (c), a boardwalk or independent deck
 for a non-maritime purpose is minimised.          does not extend more than 3m from the waterfront boundary of
                                                   the lot connected to the boardwalk or deck; (b) subject to
                                                   paragraph (c), a boardwalk or independent deck is at least 3m
                                                   inside of the side boundary or extended side boundary of the lot
                                                   connected to the boardwalk or deck; (c) if a relevant planning
                                                   scheme standard is more stringent than the standard mentioned
                                                   in paragraph (a) or (b)—the relevant planning scheme standard,
                                                   to the extent it is more stringent than the standard mentioned in
                                                   paragraph (a) or (b).




                                               Design, construction and safety - boat ramps and slip ways for private purpose
 13.1 Prescribed tidal work that is a private       (s 6(2) solution)                                                  Not applicable
 boat ramp or private slip way is designed and      The design and construction of the boat ramp or slip way is
 constructed in a way to ensure it is structurally  consistent with the following standards—
 sound while also ensuring the top of each wall     (a) subject to paragraph (c), the walls at the edge of a boat ramp
 at the edge of the boat ramp or slip way is        or slip way penetrate into the earth at least 600mm below the
 level with the surface of the land on which the    surface of the land on which the boat ramp or slip
 boat ramp or slip way is located.                  way is located;
                                                    (b) subject to paragraph (c), the surface of a boat ramp or slip
                                                    way is no more than 200mm above the surface of the land on
                                                    which it is located;
                                                    (c) if a relevant planning scheme standard is more stringent than
                                                    the standard mentioned in paragraph (a) or (b)—the relevant



                                                                                                                                        14
Coastal Protection and Management Regulation 2003 – Schedule 4A – IDAS code for the development of prescribed tidal work
Log in to download the original file

Enclosure 4 - Schedule 4a.pdf · 415 KB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.