Original source · versioned page text
Enclosure 4 - Schedule 4a
Attached to the e-mail Operational Works Application OPW17/0016.
19.4 Prescribed tidal work that is a retaining The design and construction of the retaining wall, revetment or Not applicable
wall, revetment or seawall, is not adversely seawall is consistent with the following standards—
affected by hydrostatic pressure behind the (a) subject to paragraph (b), a retaining wall, revetment or
retaining wall, revetment or seawall. seawall provides for drainage holes, and suitable filter material
behind the holes, to relieve any hydrostatic pressure behind the
retaining wall, revetment or seawall;
(b) if a relevant planning scheme standard is more stringent than
the standard mentioned in paragraph (a)—the relevant planning
scheme standard, to the extent it is more stringent than the
standard mentioned in paragraph (a).
24
Coastal Protection and Management Regulation 2003 – Schedule 4A – IDAS code for the development of prescribed tidal work
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.