Original source · versioned page text
Enclosure 4 - Schedule 4a
Attached to the e-mail Operational Works Application OPW17/0016.
Design, construction and safety -wharves
20.1 Prescribed tidal work that is a wharf is The design and construction of the wharf is consistent with the Not applicable
designed and constructed in a way to ensure it following standards—
is able to support its intended loads, having (a) subject to paragraph (c), a major wharf, or a minor wharf
regard to its relevant loading matters. accessible to vehicular traffic, is able to support at least the
following— (i) a distributed live load of 5.0kPa;
(ii) a concentrated live load of 13kN; or (b) subject to paragraph
(c), a minor wharf not accessible to vehicular traffic is able to
support at least the following— (i) a distributed live load of
5.0kPa; or (ii) a concentrated live load of 4.5kN; or
(c) if a relevant planning scheme standard is more stringent than
the standard mentioned in paragraph (a) or (b)—the relevant
planning scheme standard, to the extent it is more stringent than
the standard mentioned in paragraph (a) or (b).
25
Coastal Protection and Management Regulation 2003 – Schedule 4A – IDAS code for the development of prescribed tidal work
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.