Original source · versioned page text
Enclosure 4 - Schedule 4a
Attached to the e-mail Operational Works Application OPW17/0016.
Earthwork and vegetation
7.1 Excavation and filling for prescribed tidal The earthwork and filling for the prescribed tidal work is Not applicable.
work— consistent with each relevant planning scheme standard.
(a) is carried out only to the extent reasonably
necessary for the work; and (b) does not have
a significant adverse effect on—
(i) the natural features of the tidal water under,
within or over which the work is located; or
(ii) the level of the surface of the land under
the tidal water under, within or over which the
work is located, or any foreshores near the
work.
7.2 The location of prescribed tidal work The vegetation in the tidal water, under within or over which the No marine plants are present at the proposed sites. If
ensures vegetation is cleared or disturbed only prescribed tidal work is located, or on land under the tidal water, marine plants become established in these locations
to the extent reasonably necessary for the is cleared or disturbed in a way consistent with each relevant prior to installation, reef units are to be relocated.
work. planning scheme standard.
7.3 Any vegetation damaged, destroyed or Vegetation affected by the prescribed tidal work is dealt with in a Not applicable.
removed by prescribed tidal work under, within way consistent with the following standards—
or over tidal water other than an artificial (a) subject to paragraph (b), vegetation damaged, destroyed or
waterway, is replaced with appropriate removed by prescribed tidal work is replaced with native
vegetation. vegetation for the locality within which the work is located, to the
extent it is reasonably practicable to replace the vegetation with
native vegetation;
(b) if a relevant planning scheme standard is more stringent than
the standard mentioned in paragraph (a)—the relevant planning
scheme standard, to the extent it is more stringent than the
standard mentioned in paragraph (a); (c) any other relevant
planning scheme standard that is not inconsistent with the
standards mentioned in paragraphs (a) and (b).
5
Coastal Protection and Management Regulation 2003 – Schedule 4A – IDAS code for the development of prescribed tidal work
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.