Skip to the record
Beware of cheap imitations.

Original source · versioned page text

Enclosure 4 - Schedule 4a

Attached to the e-mail Operational Works Application OPW17/0016.

of 25

Page text shows just the words. Original shows the document exactly as it was published.

                                                                             Earthwork and vegetation
 7.1 Excavation and filling for prescribed tidal      The earthwork and filling for the prescribed tidal work is             Not applicable.
 work—                                                consistent with each relevant planning scheme standard.
 (a) is carried out only to the extent reasonably
 necessary for the work; and (b) does not have
 a significant adverse effect on—
 (i) the natural features of the tidal water under,
 within or over which the work is located; or
 (ii) the level of the surface of the land under
 the tidal water under, within or over which the
 work is located, or any foreshores near the
 work.
 7.2 The location of prescribed tidal work            The vegetation in the tidal water, under within or over which the      No marine plants are present at the proposed sites. If
 ensures vegetation is cleared or disturbed only      prescribed tidal work is located, or on land under the tidal water,    marine plants become established in these locations
 to the extent reasonably necessary for the           is cleared or disturbed in a way consistent with each relevant         prior to installation, reef units are to be relocated.
 work.                                                planning scheme standard.
 7.3 Any vegetation damaged, destroyed or             Vegetation affected by the prescribed tidal work is dealt with in a    Not applicable.
 removed by prescribed tidal work under, within       way consistent with the following standards—
 or over tidal water other than an artificial         (a) subject to paragraph (b), vegetation damaged, destroyed or
 waterway, is replaced with appropriate               removed by prescribed tidal work is replaced with native
 vegetation.                                          vegetation for the locality within which the work is located, to the
                                                      extent it is reasonably practicable to replace the vegetation with
                                                      native vegetation;
                                                      (b) if a relevant planning scheme standard is more stringent than
                                                      the standard mentioned in paragraph (a)—the relevant planning
                                                      scheme standard, to the extent it is more stringent than the
                                                      standard mentioned in paragraph (a); (c) any other relevant
                                                      planning scheme standard that is not inconsistent with the
                                                      standards mentioned in paragraphs (a) and (b).




                                                                                                                                                                                      5
Coastal Protection and Management Regulation 2003 – Schedule 4A – IDAS code for the development of prescribed tidal work
Log in to download the original file

Enclosure 4 - Schedule 4a.pdf · 415 KB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.