Original source · versioned page text
Enclosure 4 - Schedule 4a
Attached to the e-mail Operational Works Application OPW17/0016.
Lighting
5.1 Lighting, other than an aid to navigation, The lighting for the prescribed tidal work, other than an aid to Not applicable
for prescribed tidal work is installed in a way to navigation, is consistent with the following standards—
ensure the security and safe use of the work (a) subject to paragraph (c), lighting for prescribed tidal work is
without causing significant adverse effects on hooded and directed downwards; (b) subject to paragraph (c),
the amenity of the locality within which the each lighting standard, to the extent relevant;
work is located. (c) if a relevant planning scheme standard is more stringent than
the standard mentioned in paragraph (a) or (b)—the relevant
planning scheme standard, to the extent the standard is more
stringent than the standard mentioned in paragraph (a) or (b);
(d) any other relevant planning scheme standard that is not
inconsistent with the standards mentioned in paragraphs (a) to
(c).
Signage
6.1 A sign erected or otherwise placed in A sign erected or otherwise placed in position for prescribed tidal No signage.
position for prescribed tidal work, other than a work, other than a sign erected or placed for safety
sign erected or placed for safety reasons or reasons or under an Act, is consistent
under an Act— with the following standards—
(a) is compatible with the character and (a) subject to paragraph (c), a sign erected or placed in position
amenity of the work’s immediate surroundings for identifying prescribed tidal work, or the owner of the work, is
and the locality within which the work is the only sign erected or placed in position for identifying the work
located; and (b) is not a dominant feature of or owner;
the work, unless the dominance is for safety (b) subject to paragraph (c), a sign erected or otherwise placed
reasons. in position for prescribed tidal work is integrated into the design
and construction of the work;
(c) if a relevant planning scheme standard is more stringent than
the standard mentioned in paragraph (a)—the relevant planning
scheme standard, to the extent it is more stringent than the
standard mentioned in paragraph (a);
(d) any other relevant planning scheme standard that is not
inconsistent with the standards mentioned in paragraphs (a), (b)
and (c).
4
Coastal Protection and Management Regulation 2003 – Schedule 4A – IDAS code for the development of prescribed tidal work
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.