Original source · versioned page text
Enclosure 4 - Schedule 4a
Attached to the e-mail Operational Works Application OPW17/0016.
reasonably water clarity (when use of the
foreshore is more likely).
- Reef units have been located away from popular
recreation areas and often in areas with limited
accessibility, where usage of the foreshore is low.
At Site 16 (Lake Weyba) it has been located at the
northernmost end of the foreshore.
- As the project intends to reinstate a small part of
what was previously extensive oyster reef habitat,
these risks are not new to the Noosa River system
and would be at a much smaller scale to what was
previously experienced.
Navigable access to, or egress from, non-tidal work lots
10.1 Prescribed tidal work does not adversely The design and construction of the prescribed tidal work is The proposed works do not extend across private
affect navigable access to, or navigable egress consistent with the following standards— property side boundaries.
from, any non-tidal work lot. (a) subject to paragraph (b), if the lot connected to prescribed
tidal work (the connected lot) adjoins a non-tidal work lot, the
work does not extend past the connected lot’s side boundary, or
extended side boundary, adjoining the non-tidal
lot;
(b) if a relevant planning scheme standard is more stringent than
the standard mentioned in paragraph (a)—the relevant planning
scheme standard, to the extent it is more stringent than the
standard mentioned in paragraph (a).
7
Coastal Protection and Management Regulation 2003 – Schedule 4A – IDAS code for the development of prescribed tidal work
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.