Original source · versioned page text
Enclosure 4 - Schedule 4a
Attached to the e-mail Operational Works Application OPW17/0016.
Infrastructure, including access, parking, sewerage and water services
11.1 Prescribed tidal work has appropriate The infrastructure for prescribed tidal work is consistent with The nature and scale of the work is such that
infrastructure, including, in particular, road each relevant planning scheme standard. infrastructure is not required.
access, parking facilities, sewerage services
and water services, having regard to—
(a) the nature and scale of the work; and
(b) the number of people that may be on or at
the work at any time; and
(c) the number of vehicles that may be on or
moored at the work at any time; and
(d) the protection of any foreshores near the
work and the vegetation and marine plants on
the foreshores.
8
Coastal Protection and Management Regulation 2003 – Schedule 4A – IDAS code for the development of prescribed tidal work
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.