Skip to the record
Noosa's #1 Council Tracker.

Original source · versioned page text

2018-11-12 General Committee Meeting Agenda

of 84

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

GENERAL COMMITTEE MEETING AGENDA   12 NOVEMBER 2018




                                        Page 44 of 84

GENERAL COMMITTEE MEETING AGENDA                                        12 NOVEMBER 2018

                                                                              2007/2446

               To ensure Council's sewer main is accessible for maintenance purposes and is protected
              from risk of damage no structures requiring a building permit (eg. buildings, swimming pools,
               retaining walls exceeding 1m in height, raised terraces, etc) shall be constructed within this
               ‘zone of influence’ or within 1.5m of the centreline of the sewer main, whichever is the
               greater. As such the applicant shall amend Operational Works plans including Building
              plans to ensure compliance.
        Service Easements (Sewer)
        32.    A registered easement shall be created over the zone of influence of all sewers within the
               subject site and over those parts of the subject site that are impacted upon by sewers on any
              adjoining sites. The easements shall generally be parallel to and centred over the sewer
               main and be equivalent in width to twice the depth to invert level of the sewer at the deepest
              point within the allotment (measured from the finished surface) and be no less than 3.0m
              wide overall. In this regard a licensed surveyor shall accurately locate all sewer mains and
              determine the necessary width of the easement, which shall be shown on any plans
               submitted for Operational Works / Building Works approval. To this extent the surveyor shall
              certify that the sewer and the zone of influence is wholly contained within the easement to be
               created.
               In addition to this the Applicant's Solicitor shall give Council's Solicitor an appropriate
               undertaking in writing that the Title Deed and the easement documents will be lodged at the
              Land Titles Office and any additional Titles Office forms or requisitions requiring the consent
              of Council will be attended to promptly.
               A duly executed copy of the easement shall be submitted to Council for perusal prior to the
              use commencing. Any changes required by Councils Solicitor must be corrected
               immediately.
       33.    No building or other structure shall be constructed or encroach over an easement.
        Town Water Supply
       34.    The site shall be connected to Council's existing town water supply and be constructed in
              accordance with Council's standards and requirements at no cost to Council.
       35.    Each individual water connection to the water reticulation system shall extend to the property
               boundary and be metered. All fees for the supply of water meters shall be paid to the
               Council.
       36.    All water meters must be located outside the property boundary and in an easily assessable
               location to facilitate unhindered reading by Council and/or Council's contracted water meter
              readers, and not behind fences or locked gates. In this regard approval of the water meter
               configuration and location must be obtained from Council's Water & Sewerage Capital
               Works Manager prior to lodgement and approval of hydraulic drawings.
        Earthworks
        37.   Any filling works required on site shall be carried out in accordance with Council's Planning
               Scheme Policy PSP5 — Engineering Design Standards, so as not to cause the additional
              ponding of water on any adjoining lands or the blockage of, or interference with, any natural
              stormwater runoff.
       38.    Earthworks carried out on site shall not affect the structural integrity of any of the existing
              fences or structures that border the development site. Fences that are affected shall be
              replaced prior to the Building Certifier issuing the Certificate of Classification. In this regard
               any fences to be replaced shall be clearly shown on the plans submitted for Operational
               Works approval.

                                                                            Page 6 of 17

                                                                               Page 44 of 84
Log in to download the original file

2018-11-12 General Committee Meeting Agenda(PDF, 7MB).pdf · 7.8 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.