GENERAL COMMITTEE MEETING AGENDA 12 NOVEMBER 2018
Page 45 of 84
GENERAL COMMITTEE MEETING AGENDA 12 NOVEMBER 2018
2007/2446
Erosion and Sediment Control
39. Any person acting on this permit shall prevent erosion and sediment export from leaving the
site. Site control measures such as silt fencing, controlled gravel access to the site and
controlled disposal of waste, will be necessary.
In this regard plans detailing the methods of controlling erosion and sediment are required to
be submitted to the Council for approval prior to obtaining a Development Permit for
Operational Works.
Vehicle Access and Car Parking
40. A vehicular access driveway and carparking on the site shall be constructed generally in
accordance with plan titled Site-Parking numbered P1 Sheet S2 issue C dated 16/04/09 and
as amended by Council in red. A Development Permit for Operational Works shall be
requir ed.
41. The driveway shall be designed and constructed to Council's design standards and to
grades that prevent vehicles from scraping and/or bottoming whilst also allowing pedestrians
movements along the footpath without any step or level difference. Should any driveways
be constructed to grades that do not comply with AS/NZS 28980.1-2004 and AS 2890.2-1989,
Council will require that the driveway be removed and reconstructed to levels that do
comply.
Please note, a step between the driveway and the footpath must be avoided, as it is
preferred to have the footpath continue at a constant grade to minimise the potential for
pedestrians to trip or fall.
42. To ensure pedestrian safety between vehicles exiting the site and pedestrians on the
footpath, the driveway and any associated fencing or vegetation near the driveway shall
comply with the minimum sight line requirements as defined in AS 2890.1, section 3.2.4.
The applicant shall demonstrate compliance by illustrating these sight lines on the plans
submitted for both Operational Works approval and Building Works approval.
43. All vehicles shall enter and leave the site in a forward direction.
440 The carparking area shall be designed to comply with the provisions of AS/NZS 2890.1-2004
for user class 2 with allowance for vehicles to enter and leave the site in a forward gear and
with a minimum head clearance (headroom) at any point of 2.3m.
465. All carparking shall be kept, maintained and line-marked in a condition fit for use.
Contributions Towards Council Infrastructure
46. Monetary contributions shall be paid to Council towards the cost of providing and/or
upgrading vanous infrastructure at the rates applicable at the time of payment. An estimate
only of the contribution amounts are outlined in the table below:
[ContributionRequved For «di Stage Stove
PSP12—Publio Open Space Contributions |sia.ses | si0ae5
PSP 16 - Sewerage Headworks Contributions $17,505 $18,973
PSP 17 - Water Supply Headworks Contributions | $28,507
PSP 20 - Pathway Trunk Network Contributions
TOTAL Contribution Amount = $70,635
Please note, that these amounts are all subject to variations in the Consumer Price
index, All Groups Brisbane from September 2009 until the date of payment
Page 7 of 17
Page 45 of 84See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.