GENERAL COMMITTEE MEETING AGENDA                                             12 NOVEMBER 2018


15.   An Arborist Report (or part thereof) prepared by a qualified person* and endorsed through
      an Operational Works approval must provide recommendations for the design of civil
      works, including retaining walls, to accommodate the retention of the Mango tree.
16.   The Mango tree identified for retention in the conditions of this approval must be
      maintained in good health during construction and operational use for the expected life of
      the tree.
      *(Refer to Advisory Note)
      Landscaping Works
17.   The development site must be landscaped. The works must be undertaken in accordance
      with an Operational Works approval and the Noosa Plan Planning Scheme Policy PSP 3 –
      Landscaping Plants and Guidelines and must include in particular:
      a.   The works shown on the approved Landscape Concept Plan using predominately
           local native species;
      b.   The provision of 6 x 100L local native street trees to the road frontages suitable for
           the location and sight lines.
      c.   Retention of the mango tree within the north eastern corner of the lot within a
           mulched garden setting.
18.   All landscape works must be established and maintained in accordance with the approved
      design for the life of the development, and in a manner that ensures healthy, sustained and
      vigorous plant growth. All plant material must be allowed to grow to full form and be
      refurbished when its life expectancy is reached.
19.   All landscape works must be maintained generally in accordance with the approved design
      for the life of the development.
ENGINEERING
      External Works
67.   A 2.0m wide concrete footpath must be provided within the road verge for the entire length
      of the frontage of the site to Wattle Street. The path must generally match with the existing
      grassed verge without causing a trip hazard. The works must be undertaken in accordance
      with an Operational Works approval and must include/address the following:
      a.   Be in compliance with IPWEAQ standard drawing SEQ R-065 Concrete Pathway
           Construction Details;
      b.   Be extended to smoothly tapered and join with the existing path along Garnet Street.
      Reinstatement Works
68.   Any redundant driveway and/or kerb layback must be removed, and the kerb line and verge
      area reinstated and landscaped to match the existing kerb and/or verge treatments.
      Grassed verge areas to be reinstated must be provided with 100 mm topsoil and turf, and
      must be maintained by the developer until established.
69.   Any redundant private pathway to the property must be removed, and verge area
      reinstated and landscaped to match the verge treatments.
70.   Any damaged kerb and channel along the frontage of the site must be repaired to the
      reasonable satisfaction of Council’s representative.
      Site Access and Driveways
71.   A sealed access driveway must be provided from Garnet Street to all parking and
      manoeuvring areas of the development. The works must be undertaken in accordance with
      an Operational Works approval and must include in particular:


                                                                                     Page 5 of 84
Log in to download the original file

2018-11-12 General Committee Meeting Agenda(PDF, 7MB).pdf · 7.8 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.