GENERAL COMMITTEE MEETING AGENDA 12 NOVEMBER 2018
a. Driveway crossovers in accordance with IPWEAQ standard drawings R-049 and R-
050 to grades prevent vehicles from scraping and/or bottoming whilst also allowing
for compliant grades for the footpath and pedestrians movements along the footpath
and the grassed verge without any step or trip hazard.
Car Parking
72. Car parking must be provided within the site generally as shown on the approved plans.
The works must be undertaken in accordance with an Operational Works approval and
must be in compliance with the provisions of AS/NZS 2890.1-2004 with allowance for
standard vehicle to enter and leave the site in a forward gear and with a minimum head
clearance (headroom) at any point of 2.2m.
73. All car parking areas and access driveways must be maintained exclusively for vehicle
parking and manoeuvring and kept in a tidy and safe condition at all times.
Stormwater Drainage
74. The site must be provided with a stormwater drainage system connecting to a lawful point/s
of discharge in Garnet Street and/or Wattle Street. The works must be undertaken in
accordance with an Operational Works approval in compliance with the relevant sections of
Queensland Urban Drainage Manual and supported by a detailed stormwater drainage
design prepared and certified by a suitably qualified and experienced Registered
Professional Civil Engineer (RPEQ).
75. The development of the site must not worsen existing drainage conditions on other
properties by diverting stormwater runoff or cause additional stormwater ponding on any
other property.
76. Stormwater runoff from the development must be disposed of on-site without causing scour
or damage to the subject site or any adjoining property.
Earthworks and Retaining Walls
77. All earthworks must be carried out in compliance with an Operational Works Development
Permit.
78. All earthworks and associated batters/retaining walls must be contained entirely within the
subject site unless written permission from the respective landowner(s) is provided to
Council.
79. All earthworks must be undertaken in accordance with the provisions of Australian
Standard AS3798: Guidelines on Earthworks for Commercial and Residential
Developments, Council’s codes and relevant government regulations and guidelines.
Certification must be provided by an RPEQ and submitted to Council prior to the issue of
the Certificate of Classification for the building.
80. The development works must not adversely impact on the stability of the subject site, any
other property or private/ public structure and the long term health of the existing mango
tree as shown on the landscape plan A14 Rev B.
81. Earthworks and development works carried out on site must not affect the structural
integrity of any of the existing fences or structures that border the site. Fences that are
affected shall be replaced prior to the Building Certifier issuing the Certificate of
Classification.
Telecommunication Services
82. Unless otherwise stipulated by telecommunications legislation at the time of construction,
the development must be provided with all necessary conduits, pits and pipes to
accommodate the future connection of optic fibre technology telecommunications.
Page 6 of 84
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.