Construction Management Plan_OPW25_0036_45 Cormorat Crescent Peregian Beach

of 9

Page text read automatically using OCR, there may be inaccuracies

Plans and drawings: the text below has words only, no drawings.

Log in to see the plans as drawn
     DESKTOP RISK ASSESSMENT                                                                                                                                                        Organisations and individuals responsible for works in accordance with this Part of the Manual need to
                                                                                                                                                                                    be aware of their responsibilities for any injury to road users or damage to property as a result of such
                                                                                                                                                                                    operations. There is an equally important obligation to provide a safe workplace environment that
      PROJECT ADDRESS:        45 Co mo ant Cr scent                                  DATE: 16/04/2025                                                                               minimises, as far as practicable, the likelihood of injury to workers by traffic within or adjacent to the
                                                                                                                                                                                    work area. Principals and contractors need to be aware of the requirements of OHS legislation and
       PREPARED BY:           C    i W ight           QUALIFICATION: #OP630
                                                                                                                                                                                    implement them as they apply to this obligation.
                                                                                                                                                                                    Steps should be taken to warn the public of prevailing conditions and to guard, delineate, and, where
      RISK RATING:                            1 = (HIGH)                                                                                                                            necessary, illuminate work which may pose a hazard to road users. Care should also be taken to avoid,
                                              2 = (MEDIUM)                                                                                                                          wherever possible, long delays or detours which may cause unnecessary inconvenience to road users
                                              3 = (LOW)                                                                                                                             (see Clause 2.6.6).
      DESCRIPTION OF HAZARD:                                                                                                                                                        Supervisory personnel carrying out construction, maintenance or other works that require the use of a
                                                                                                                                                                                    traffic guidance scheme shall give attention to the following:
      1) Workers within 1.2m of the trafficable lanes at risk of being struck by passing traffic.
                                                                                                                                                                                    (a) Be mindful of their responsibility to provide, as far as practicable, a safe workplace for personnel
      2) Work vehicles obscuring traffic lane causing conflict between work vehicles and road users.
                                                                                                                                                                                    and plant under their control, and safe and convenient travelling conditions for road users.
      3) Residents blocked from entering or exiting their properties by works.
                                                                                                                                                                                    (b) Ensure that personnel under their control are at all times courteous to road users. Personnel
      4) Pedestrian access will be greatly affected by works                                                                                                                        should not allow themselves to become distracted by provocation from members of the public.
                                                                                                                                                                                    (c) Ensure that personnel are competent to perform the roadwork signing task (see Clause 1.4.3).
                                                                                                                                                                                    (d) Ensure that all personnel at a work site are aware of their responsibilities.
                                                                                                                                                                                    (e) Ensure that traffic controllers are appropriately trained and informed of their duties and that they
                                                                                                                                                                                    are regularly relieved from their duty (see Clause 4.10.5).
      ACTION DEEMED NECESSARY TO REDUCE THE RISK TO A SAFE LEVEL:                                                                                                                   (f) Be familiar with, and act, as far as is practicable, in accordance with the provisions of this Part of
      1) Implement advance warning signage and delineation of work area.
                                                                                                                                                                                    the Manual.
      2) Implement hold and release operation.
      3) Ensure driveways are accessible at all times. Spotter to assist and direct residents to enter or leave their properties safely.
                                                                                                                                                                                    Risk management entails the identification and analysis of all safety risks likely to arise during works
                                                                                                                                                                                    on road including the setting up, operating, changing and ultimate dismantling of a traffic guidance
      4) Footpaths will be closed with TCs in place to assist pedestrians around work area
                                                                                                                                                                                    scheme, followed by the determination of appropriate measures to mitigate those risks. The process is
                                                                                                                                                                                    appropriate at all levels of planning and operation including the following:
                                                                                                                                                                                    (a) When preparing standardised plans and safe work method statements for the conduct of all types
       CIRCLE REQUIRED CONTROL LEVEL:
       1) ELIMINATION 2) SUBSTITUTION 3) ISOLATE 4) ENGINEERING 5) ADMINISTRATION 6)PPE                                                                                             of closures on the road and footpath.
      PROPOSED FURTHER ACTION:
                                                                                                                                                                                    (b) When preparing traffic guidance schemes for more extensive or complex works where site specific
                                                                                                                                                                                    risks will assume importance.
      ROUTINE TRAFFIC SIGNAGE AUDITS ARE TO BE COMPLETED AS PER QGTTM & AGTTM REQUIREMENTS                                                                                          In each case the process should be carried out by first identifying all the hazards likely to arise,
                                                                                                                                                                                    evaluating them in terms of likelihood of occurrence and adverse consequences using historical data,
                                                                                                                                                                                    experience or other means. The proposed procedural statement or traffic guidance scheme should
       RISK RANKING AFTER IMPLEMENTING CONTROL:                                                                                                                                     then be checked in detail to ensure that adequate means of controlling or reducing those risks found
       1=(HIGH)   2=(MEDIUM)     3=(LOW)                                                                                                                                            to be significant, are in place.
Careful consideration should be given to the signing of the work site, no matter how brief the occupation of the site may be.
This should include: (a) protection of workers, provision of adequate warning of changes in surface condition and the presence                                                                                                                                       HOW LIKELY IS IT TO OCCUR?
                                                                                                                                                                                      HOW SEVERELY COULD
of personnel or                                                                                                                                                                       IT HURT SOMEONE OR
                                                                                                                                                                                                                                VERY LIKELY                        VERY LIKELY                  UNLIKELY     VERY UNLIKELY
plant engaged in work on the road; and (c) adequate instruction of road users and their guidance safely through, around or past                                                       HOW ILL COULD IT
                                                                                                                                                                                      MAKE SOMEONE?                             COULD HAPPEN                   COULD HAPPEN                 COULD HAPPEN     COULD HAPPEN
the work site.                                                                                                                                                                                                                    ANY TIME                       SOMETIME                  BUT VERY RARELY   BUT PROBABLY
Important basic principles to be observed are as follows:                                                                                                                                                                                                                                                     NEVER WILL
(i) Signs and devices shall be installed by a competent person.
(ii) Signs and devices shall be appropriate to the conditions at the work site and shall be used in accordance with this Part of the                                                  KILL OR CAUSE

Manual unless a risk assessment by a competent person indicates that an alternative arrangement is satisfactory
                                                                                                                                                                                      PERMANENT DISABILITY
                                                                                                                                                                                      OR ILL HEALTH
                                                                                                                                                                                                                                     1/H                            1/H                          1/H            2/M
(see Clause 2.2.3). (iii) Signs and devices shall be erected and displayed before work commences at a work site.
                                                                                                                                                                                      LONG TERM ILLNESS OR
(iv) Signs and devices shall be regularly checked and maintained in a satisfactory condition.                                                                                         SEROUS INJURY                                  1/H                            1/H                          2/M            2/M
(v) Signs and devices shall be removed from a work site as soon as practicable. However, appropriate signs should
                                                                                                                                                                                       MEDICAL ATTENTION AND
remain in place until all work (including loose stone removal and line marking following bituminous surfacing) has been                                                                SEVERAL DAYS OFF WORK                         1/H                            2/M                          2/M            3/L
completed.
(vi) Records shall be kept of all works signing and delineation at roadway or part-roadway closures.                                                                                   FIRST AID NEEDED
                                                                                                                                                                                                                                     2/M                            2/M                          3/L            3/L
(vii) Where works require the relocation of regulatory traffic control items, they shall be relocated or reinstalled promptly
in positions where they are visible and can perform their regulatory function.
                                                             CLIENT: Gold leaf Constructions                  POSITION: N/A                                                               LOCATION OF WORKS:           45 Cormorant Crescent                                             UBD MAP: TBA

                                                             CONTACT: Klint Grabbe                            PHONE:      0474 764 761                                                    BETWEEN STREETS:             Maureen Harmony St to Garmet St
                                                                                                                                                                                                                                                                                                                  N
                                                             TGS NO: 172294-1                                 REVISION: 0                REVISION DATE:                                   ROAD CONFIGURATION: Two Way Road

                                                             DATE OF DESIGN: 16/04/2025                       CLOSURE TYPE: Hold & Release                                                SPEED OF ROADWAY:            50 Kph
                                                                                                                                                                                                                                                  .PICKERING
TRAFFIC MANAGEMENT DESIGNER: Chris Wright                    QGTTM & AGTTM                                    PURPOSE: Proposed Civil Works                      DURATION: SHORT TERM

 TMD QUALIFICATION NUMBER:        #OP630                         Organisations and individuals responsible for works in accordance with this Part of the Manual need to be aware of their responsibilities for any injury to road users or damage to property as a result of such operations.
                                                                   There is an equally important obligation to provide a safe workplace environment that minimises, as far as practicable, the likelihood of injury to workers by traffic within or adjacent to the work area. Principals and
                                                                                                                  contractors need to be aware of the requirements of OHS legislation and implementthem as they apply to this obligation
Log in to download the original file

Construction Management Plan_OPW25_0036_45 Cormorat Crescent Peregian Beach.pdf · 3.8 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.