Council archive · source document
Decision Notice - Concurrence Agency - Q.T (Maritime Safety) [As Published] · 142008.1704
2008/1704
21. Certification by a Registered Professional Engineer of Queensland shall be submitted to
Council prior to the return of any bond monies held by Council. The certification shall state that
the jetty, pontoon and regatta stairs have been constructed in accordance with best practice
methods, are accordance with Coastal Protection and Management Act 1995, are structurally
sound and will have no detrimental affect on the existing revetment walls. A final inspection
and approval of the structure by Council’s Inspector is also required prior to the return of any
bond monies held by Council. Please contact Council’s Land Development Section to arrange
the inspection.
22. A final inspection and approval of the structure by Council’s Inspector is required prior to the
return of any bond monies held by Council. Please contact Council’s Land Development
Section to arrange the inspection.
23. The jetty shall be licensed with the Council upon completion of the structural work and shall be
licensed annually thereafter.
24. The Development Permit for Operational Works lapses if the works have not been completed
by 28 April 2011, unless an application to extend the currency is approved by Council.
5 REFERRAL AGENCY CONDITIONS
The referral agencies applicable to this application are:
Referral Trigger Referral Status Referral Agency Referral Address
Operational works that Concurrence Environmental Eco access Customer
is Prescribed Tidal Protection Agency Service Unit
Works GPO Box 15155
CITY EAST QLD 4002
Operational works that Concurrence Queensland MacArthur Avenue East
is Prescribed Tidal Transport - Maritime PINKENBA QLD 4008
Works Safety
6 APPROVED PLANS/DOCUMENTS
The approved plans and / or documents for this development approval are listed in the following
table:
Plan / Document No. Rev. Plan / Document Name Date
WD.707 C5 Proposed Pontoon & Jetty – Kidd + Co 5 March 2008
SCE07-67 1H of 38 Fixed Jetty & Regatta Stair Layout – 13 March 2009
Schwabe Consulting Engineers
SCE07-67 2H of 38 Fixed Jetty & Regatta Stair Fixity 13 March 2009
Details – Schwabe Consulting
Engineers
7 ADVISORY NOTES
The following Advisory Notes are for information purposes only and do not form conditions of
approval:
1. Should any changes or modifications to the approved plans be required as a result of
construction constraints, a Change to an Existing Approval Application under the Integrated
Planning Act must be made. Amended plans clearly indicating the changes must be lodged
with this application along with the appropriate fees.
Page 3 of 13
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Decision Notice - Concurrence Agency - Q.T (Maritime Safety) [As Published]Related documentApplication case desk ↗
001A63BA.002.pdfRelated documentPublic source context ↗
About this file
- File size
- 3.1 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.