23. A sealed access driveway must be provided from Jan Street and Banksia Avenue to all
parking and manoeuvring areas of the development. The works must be undertaken
generally in accordance with the conditions of this approval and be generally in accordance
with ARCOS’ Development Site Plan (OPW-C-301, Rev. A) dated 18 December 2023.
Car Parking
24. A minimum of 3 car parking spaces must be provided on the site. The works must include a
minimum of 2 covered spaces.
Stormwater Drainage
25. The site must be provided with a stormwater drainage system connecting to a lawful point of
discharge. The works must be undertaken generally in accordance with the conditions of
this approval, be generally in accordance with ARCOS’ Development Site Plan (OPW-C-301,
Rev. A) dated 18 December 2023, and must include in particular:
a. 3,000L of on-site rainwater retention per tenancy for reuse purposes.
Services
26. Underground reticulated electricity and telecommunication services must be provided to
each lot in accordance with the standards and requirements of the relevant service provider.
27. Unless otherwise stipulated by telecommunications legislation at the time of construction, the
development must be provided with all necessary conduits, pits and pipes to accommodate
the future connection of optic fibre technology telecommunications.
28. Certification must be submitted to Council from all relevant service providers (Energex, NBN
and Unitywater) which certifies that the development has met the requirements of this
Decision Notice and all applicable legislation at the time of construction.
Easements
29. Unless otherwise agreed in writing by the relevant service provider, any public or third party
infrastructure located on the subject site must be placed within an easement registered
against the title of the property.
30. All easements must be designed in accordance with the planning scheme and granted at no
cost to the Grantee. Where the Grantee is Council or a service authority, the easement
documentation must be in accordance with the Grantee’s standard easement terms. Draft
easement documentation must be submitted to Council for endorsement.
31. All works must be kept clear of any existing or proposed easements on the subject land,
unless agreed otherwise in writing by the Grantee.
Earthworks and Retaining Walls
32. All earthworks and associated retaining structures/batters, both above and below ground,
both temporary and permanent, must be undertaken generally in accordance with the
conditions of this approval, be generally in accordance with ARCOS’ Earthworks Plan (OPW-
C-201, Rev. A) dated 18 December 2023, and be contained entirely within the subject site
unless written permission from the respective landowner(s) is provided to Council.
33. All retaining walls must be designed and constructed in accordance with the planning scheme
and must be certified by an RPEQ where exceeding 1.0m in height. All retaining walls that
are publicly accessible and exceed 1.0m in height must be fitted with a commercial grade
safety fence.
Page 4 of 13
Document Set ID: 22936245
Version: 3, Version Date: 10/04/2024
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Decision Notice MCU24 0001 & OPW24 0003.pdfRelated documentApplication case desk ↗
About this file
- File size
- 186 KB (small file)
- File type
No other editions are linked here.