Skip to the record
Beware of cheap imitations.

Council archive · source document

Decision Notice MCU24 0001 & OPW24 0003 · MCU24/0001

of 13

Text shows just the words. Original shows the document exactly as it was published.

                              OPW24/0003 – DEVELOPMENT PERMIT FOR OPERATIONAL WORKS
                                 (EARTHWORKS, STORMWATER, LANDSCAPING & CROSSOVER)
               APPROVED PLANS
               34.    Development undertaken in accordance with this approval must generally comply with the
                      approved plans of development. The approved plans are listed in the following table unless
                      otherwise amended by these conditions.

                           Plan No.     Rev.    Plan/Document Name                                  Date

                           OPW-C-201    A       Earthworks Plan prepared by ARCOS                   18.12.2023

                           OPW-C-301    A       Development Site Plan prepared by ARCOS             18.12.2023

                           LD1          A       Drawing Schedule Specifications prepared by Bird 16.12.2023
                                                Landscape Design

                           LD2          A       Finishes and Planting Schedules Prepared by Bird 16.12.2023
                                                Landscape Design

                           LD3          A       Details prepared by Bird Landscape Design           16.12.2023

                           LP1          A       Planting Plan – Ground Floor Prepared by Bird 16.12.2023
                                                Landscape Design
                                                Annotated by Council

                           LP2          A       Planting Plan – First Floor Prepared by Bird 16.12.2023
                                                Landscape Design

               CURRENCY PERIOD
               35.    The Currency Period for this development approval lapses if the development has not
                      substantially started by 9 April 2026, unless an application to extend the currency period is
                      approved by Council.
               PRIOR TO COMMENCEMENT OF WORKS
                      Bonds
               36.    A site control and/or compliance bond of $10,000 is to be submitted to Council prior to the
                      pre-start meeting. The pre-start meeting will only be held once Council's Construction
                      Engineering Officer has confirmation that the bond monies have been received by Council.
                      The bond will be refunded less any costs incurred by Council in ensuring compliance with
                      these conditions or any additional inspections incurred for substandard work or work
                      undertaken not in accordance with this permit.
               37.    Bonds must:
                      a.      have approval of the bond calculations and amount from Council prior to lodgement
                      b.      be lodged with Council and accompanied by the Bond Administration Fee/s.
                      c.      be requested for release by writing to Council, when relevant approval requirements
                              have been met.
                      Engineering
               38.    All necessary approvals from external service providers (e.g., Unitywater, Energex) and
                      external parties on which the development works are proposed have been obtained and a
                      copy supplied to Council.




                                                                                                     Page 5 of 13
Document Set ID: 22936245
Version: 3, Version Date: 10/04/2024

Used in these records

About this file

File size
186 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Decision Notice MCU24 0001 & OPW24 0003.pdf · 186 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.