2021-07-12 General Committee Meeting Minutes

of 12

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

GENERAL COMMITTEE MEETING MINUTES                                                   12 JULY 2021


        8.    Compaction with a vibrating roller must not be carried out within 600mm of any
              utility infrastructure.
        9.    Other than for accessways, filling must not extend more than the fill/batter line as
              shown on Approved Site Plan, prepared by Stylemaster and dated 21 January
              2021.
        10.   Earthworks required on site must be carried out in accordance with Council’s
              Planning Scheme Policy PSP6 - Engineering Design Standards, so as not to cause
              the additional ponding of water on any adjoining lands or concentrate or direct
              overland flow on to an adjoining property.
        Erosion and Sediment Control
        11.   Prescribed Water Contaminants (as defined in Schedule 10 of Environmental
              Protection Regulation 2019) must not be released from the site or to waters within
              the site, or be likely to be released should rainfall occur, unless all reasonable and
              practicable measures are taken to prevent or minimise the release and
              concentration of contamination.
        12.   Sediment and erosion control measures must be in place prior to works
              commencing. If such measures are not in place or are not satisfactory, “on the
              spot” fines may be issued. Such fines can be issued if sediments from the site are
              found to enter or have the potential to enter Council’s stormwater system, natural
              waterways, any downstream stormwater filtration system or adversely impacting
              on other properties. It is the site's Principal Contractor who is responsible for
              ensuring that the sediment and erosion control measures have:
              a.    Been revised to address predicted rainfall events, and
              b.    Achieve the desired environmental outcomes.
              Council may request further controls to be installed should the implemented
              measures be found inefficient.
                                                                     Carried unanimously.



    1   MCU19/0119.02 OTHER CHANGE TO A DEVELOPMENT APPROVAL FOR A
        MATERIAL CHANGE OF USE FOR MULTIPLE HOUSING - TYPE 2 DUPLEX AND
        SHORT-TERM ACCOMMODATION AND OPERATIONAL WORKS (DRAINAGE
        WORK, STORMWATER, EARTHWORKS, LANDSCAPING, CARPARKING &
        ACCESS) 2 NOLA STREET, NOOSAVILLE
        Committee Recommendation
        Moved:            Cr Lorentson
        Seconded:         Cr Stockwell
        That Council note the report by the Development Planner to the Planning & Environment
        Committee Meeting dated 6 July 2021 regarding Application No. MCU19/0119.02 &
        OPW19/0216.02 for an Other Change to a Development Approval for a Material Change
        of Use for Multiple Housing - Type 2 Duplex and Short-term accommodation and
        Operational Works (Drainage work, Stormwater, Earthworks, Landscaping, Carparking
        & Access) situated at 2 Nola Street, Noosaville and
        A.     Request staff to prepare a further report for the Ordinary Meeting dated 15 July
               2021 including conditions for approval of the application.
        B.     Write to the Minister, State Development, Infrastructure, Local Government and
               Planning to request his agreement to make a Temporary Local Planning
               Instrument to make short-term accommodation an inconsistent use in the

                                                                                    Page 4 of 12
Log in to download the original file

2021-07-12 General Committee Meeting Minutes(PDF, 642KB).pdf · 658 KB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.