MCU16/0079 Town Planning Report

of 64

Page text read automatically using OCR, there may be inaccuracies

                                                                                                                                                                           Town Planning Report
                                                                                                                                                                                  “Undefined Use”
                                                                                                                                             Staged Extension & Refurbishment of Existing RSL Club
                                                                                                                                                               5 Memorial Ave, Tewantin QLD 4565
                                                                                                                                                          Lot 3 on T16319 and Lot 10 on SP273411

iv. additional amenity for minor roads.




O8 Stormwater drainage infrastructure is planned, designed      S8.1 Stormwater drainage planning, design and construction   Complies with the Possible Solutions – The proposed
and constructed to—                                             is in accordance with Section 4 of PSP5 Engineering Design   stormwater and drainage has been designed in accordance
a) be accessible, cost effective and easily maintainable;       Standards – Roads, Drainage and Earthworks;                  with PSP5. All stormwater and drainage will be collected on
b) protect downstream capacity;                                 AND                                                          site, treated and then transferred to the legal point of
c) protect downstream water quality;                            S8.2 As Constructed data is submitted in accordance with     discharge. Further documentation regarding the proposed
d) maximise on-site stormwater retention and retardation; and   Section 6 of PSP5 Engineering Design Standards – Roads,      design will be provided within the Operational Works
e) convey run-off to stormwater drainage in a manner that       Drainage and Earthworks;                                     application.
allows roads to be trafficable in Q100 ARI local rainfall       AND
events.                                                         S8.3 Stormwater drainage planning, design and construction
                                                                is in accordance with the Queensland Urban Drainage Design
                                                                Manual.
O9 Roads and stormwater drainage infrastructure is              S9.1 Roads and stormwater drainage infrastructure is         Complies with the Possible Solutions – The proposed
constructed—                                                    constructed in accordance with—                              stormwater and road drainage has been designed in
a) in accordance with appropriate engineering standards; and    a) Sections 2, 3 and 4 of PSP5 Engineering Design            accordance with PSP5 and Austroads. The proposed
b) to minimise adverse environmental impacts, including from    Standards – Roads, Drainage and Earthworks;                  development also incorporates erosion and seidiment control
run-off and erosion.                                            b) Queensland Design Code for Residential Streets;           measures, these measures have been designed in
                                                                c) AUSTROADS; or                                             accordance with the Guidelines for Queensland Construction
                                                                d) A combination of the principles in these documents; AND   Sites. IT is considered the proposed development will not
                                                                S9.2 Erosion and sediment control measures are designed      create any adverse environmental impacts.          Further
                                                                and implemented in accordance with the Institution of        documentation regarding the proposed design will be
                                                                Engineers Australia (Queensland Division) Soil Erosion and   provided within the Operational Works application.
                                                                Sediment Control - Guidelines for Queensland Construction
                                                                Sites.

July 2016                                                                                                   Page | 49

Log in to download the original (MCU16_0079 Town Planning Report.pdf)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.