Original source · versioned page text
MCU16/0079 Town Planning Report
Town Planning Report
“Undefined Use”
Staged Extension & Refurbishment of Existing RSL Club
5 Memorial Ave, Tewantin QLD 4565
Lot 3 on T16319 and Lot 10 on SP273411
c) forming and grading to footpaths; and channel where applicable. All footpaths will be upgraded
d) vehicular kerb and footpath crossings; to Council’s specifications to promote and enhance
e) a constructed bikeway; pedestrian linkages to the site and the surrounding area.
f) a constructed footpath;
g) a constructed carriageway; It is considered no additional infrastructure will be required to
h) required alterations to public utility mains, services or facilitate the development.
installations;
i) construction of any required alterations to public utility All Road and drainage infrastructure will be design and
mains, services or installations; construction is in accordance with PSP5. Council is directed
j) stormwater drainage works; and to Appendix B – Architectural Plans for further details.
k) installation of electrical conduits; AND
S13.2 Road and drainage design and construction is in
accordance with Sections 3 and 4 of PSP5 Engineering
Design Standards – Roads, Drainage and Earthworks.
14.150 Staged development
O15 Staged development is planned, designed and No solution provided. Complies with the Specific Outcome – The proposed
constructed to ensure that— development includes the staged expansion to the existing
a) each stage of the development can be constructed without Tewantin Noosa RSL. The development consists of Stage 4,
interruption to services and utilities provided to the previous 5 & 6. Each stage of the development has been designed to
stages; ensure all infrastructure is provided and minimal impact to the
b) the infrastructure provided is capable of servicing the entire site and the locality occurs. Although in separate sages, the
development; and development has a uniform design and maintains the scale
c) the materials used are consistent throughout the and building form of the area. It is considered the proposed
development. staging is a practical and sequential approach to the
expansion of the RSL. Council is directed to Appendix B –
Architectural Plans for further details.
14.151 Alterations to services and utilities
O16 Any alterations or repairs to infrastructure as a result of S16.1 Any alterations or repair to infrastructure as a result of Noted
the development are made at no cost to Council. the development are completed at the developer’s expense.
July 2016 Page | 51
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original (MCU16_0079 Town Planning Report.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.