Skip to the record
NoosaWatch™: The source of truth.

Original source · versioned page text

MCU16/0079 Town Planning Report

of 64

Page text read automatically using OCR, there may be inaccuracies

                                                                                                                                                                              Town Planning Report
                                                                                                                                                                                     “Undefined Use”
                                                                                                                                                Staged Extension & Refurbishment of Existing RSL Club
                                                                                                                                                                  5 Memorial Ave, Tewantin QLD 4565
                                                                                                                                                             Lot 3 on T16319 and Lot 10 on SP273411

14.165 Design and construction (sewer)
O8 Sewerage reticulation infrastructure—                         S8.1 Sewerage reticulation infrastructure is designed in      Complies with the Probable Solutions – all sewer
a) meets the needs of the users;                                 accordance with PSP6 Engineering Design Standards –           infrastructures has been designed in accordance with PSP6.
b) is designed to be compatible with existing infrastructure;    Water and Sewerage.                                           Council is directed to Appendix B – Architectural Plans for
     and                                                                                                                       further details.
c) is designed using materials that are suitable of the use,
     durable, easy to maintain and cost effective, taking into
     account the whole of life cycle cost and Council’s
     maintenance inventory.
O9 Sewerage reticulation infrastructure is constructed—          S9.1 Sewerage reticulation infrastructure is constructed in   Complies with the Probable Solutions – The proposed
a) in accordance with appropriate engineering standards; and     accordance with PSP6 –Engineering Design Standards —          sewer connections has been designed in accordance with
b) to minimise adverse environmental impacts                     Water and Sewerage and As Constructed data submitted in       PSP6. All documentation will be provided during the
                                                                 accordance with PSP6 –Engineering Design Standards —          Operational Works, Building and Plumbing application stage.
                                                                 Water and Sewerage;
                                                                 AND                                                           All erosion and sediment control measures have been
                                                                 S9.2 Erosion and sediment control measures are designed       designed in accordance with the control guidelines. All
                                                                 and implemented in accordance with the Institution of         documentation will be provided during the Operational Works,
                                                                 Engineers Australia (Queensland Division) Soil Erosion and    Building and Plumbing application stage.
                                                                 Sediment Control - Guidelines for Queensland Construction
                                                                 Sites.
O10 Sewerage reticulation infrastructure is proven to be         No solution provided.                                         Complies with the Specific Outcome – The proposed
suitable for its use prior to Council accepting the dedicated                                                                  development includes an upgrade to the existing sewer line
asset.                                                                                                                         which services the site. It is considered all new access will be
                                                                                                                               developed to Council’s standards and appropriate inspections
                                                                                                                               will be carried out to prove its standard of development.
O11 Sewerage reticulation infrastructure is provided with all    No solution provided.                                         Complies with the Specific Outcome – The proposed
supporting technical documentation.                                                                                            development includes an upgrade to the existing sewer line
                                                                                                                               which services the site. All new sewer connections will be
                                                                                                                               completed in accordance with Council standards. All
                                                                                                                               documentation will be provided during the Operation Works
                                                                                                                               application and Building and plumbing Application.




July 2016                                                                                                     Page | 58

Log in to download the original (MCU16_0079 Town Planning Report.pdf)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.