               54.    Any construction works to be undertaken in the vicinity of Council’s existing water supply or
                      sewerage infrastructure must not adversely affect the integrity of the infrastructure. All costs
                      associated with repair, replacement or alteration of existing infrastructure must be met by the
                      applicant.
               Service Easements (Sewer / Stormwater)
               55.    No building or other structure shall be constructed or encroach over an easement.
               Construction Issues
               56.    A Traffic Management Plan for the each construction phase of the development shall be
                      submitted to and approved by Council at least 5 working days prior to the commencement of
                      any Building works or at least 5 working days prior to the pre-start meeting for Operational
                      Works. The Traffic Management Plan shall include but not be limited to:
                      •         Limiting the routes for the heavy vehicles to the major road network and prohibit the
                                use of the local roads as access to the site;
                      •         Indicate provision for on-site and off-site parking for the required workforce;
                      •         Indicate the location of loading and unloading areas,
                      •         Indicate the location of any “holding” areas for heavy vehicles and
                      •         Operating hours.
               57.    Construction staff shall not park on Serenity Close or elsewhere on-street. Parking shall
                      either be on site, an adjacent vacant site or at a suitable off-site location serviced via a shuttle
                      bus.
               58.    A Condition Survey must be carried out on existing structures and services prior to any
                      excavation or construction works taking place on site. If distress already exists, a
                      photographic survey should be undertaken, the distress measured and a plan to monitor
                      changes to distress shall be implemented.
               Earthworks
               59.    Earthworks carried out on site shall not affect the structural integrity of any of the existing
                      fences and/or structures and/or lands and/or services within the development site or that
                      border the development site. Fences that are affected shall be replaced prior to the Building
                      Certifier issuing the Certificate of Classification. In this regard any fences to be replaced
                      shall be clearly shown on the plans submitted for Operational Works approval.
               60.    Plans and details outlining the extent of earthworks required on site and any trees to be
                      retained shall be submitted to Council for approval prior to obtaining a Development Permit
                      for Operational Works.
               61.    All major excavations (including the basement and driveways) shall be shored to prevent
                      batters extending into areas and vegetation that are to be retained. All trees to be retained
                      should be adequately tagged to Council’s satisfaction and enclosed with a barrier fence to
                      the drip line to prevent damage.
               62.    A geotechnical engineer or similar qualified expert shall assess the soil condition on site,
                      determine the soil classification, establish whether any measures are required to protect the
                      stability of adjoining buildings and/or structures and/or land and/or services, and make
                      recommendations on the type of foundation system(s) best suited for the proposed
                      development. The recommendations of this report shall be incorporated into the design and
                      construction of the proposed development.
               63.    A geotechnical engineer or similar qualified expert shall supervise and certify the earthworks
                      required on site and measures to ensure stability of adjoining buildings and/or structures
                      and/or land and/or services.
               64.    Earthworks shall not cause the ponding of water on any adjoining lands or the blockage of,
                      or interference with, any natural watercourses or overland flow path.


                                                                                                           Page 8 of 24
Document Set ID: 20945331
Version: 4, Version Date: 07/08/2019                                                                    Print Date: 8 August 2019, 8:59 AM

Used in these records

About this file

File size
2.3 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Attachment A - Existing Approval.pdf · 2.3 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.