ORDINARY MEETING MINUTES                                                            18 APRIL 2019


         Electricity and Telecommunication Services
         16.   Unless otherwise stipulated by telecommunications legislation at the time of
               construction, the development must be provided with all necessary conduits, pits
               and pipes to accommodate the future connection of optic fibre technology
               telecommunications.
         17.   Certification must be submitted to Council from all relevant service providers which
               certifies that the development has met the requirements of this Decision Notice
               and all applicable legislation at the time of construction.
         Easements
         18.  Unless otherwise agreed in writing by the relevant service provider, any public or
              third party infrastructure located on the subject site must be placed within an
              easement registered against the title of the property.
         19. All easements must be designed in accordance with the planning scheme and
              granted at no cost to the Grantee. Where the Grantee is Council or a service
              authority, the easement documentation must be in accordance with the Grantee’s
              standard easement terms. Draft easement documentation must be submitted to
              Council for endorsement.
         20. All works must be kept clear of any existing or proposed easements on the subject
              land, unless agreed otherwise in writing by the Grantee.
         Earthworks and Retaining Walls
         21.   All fill and associated retaining walls/batters must be contained entirely within the
               subject site unless written permission from the respective landowner(s) is provided
               to Council. All earthworks must be undertaken in accordance with the provisions
               of Australian Standard AS3798: Guidelines on Earthworks for Commercial and
               Residential Developments.
         Damage to Services and Assets
         22.  Any damage caused to existing services and assets as a result of the development
              works must be repaired at no cost to the asset owner at the following times:
              a.   where the damage would cause a hazard to pedestrian or vehicle safety,
                   immediately; or
              b.   where otherwise, upon completion of the works associated with the
                   development.
              Any repair work which proposes to alter the alignment or level of existing services
              and assets must first be referred to the relevant service authority for approval.
         Performance Bond
         23.   Security in the form of a cash bond or trading bank guarantee to the sum of $5,000
               must be submitted to Council, to secure performance of all conditions of this
               approval, prior to the issue of a Development Permit for Operational Works. The
               cash bond or trading bank guarantee will be returned on performance of the
               conditions of approval less any costs incurred by Council in respect of enforcing
               performance of this permit. Council reserves the right to call upon the bond or
               guaranteed sum to effect compliance with conditions.
    B.   Find the following are sufficient grounds to justify the decision despite the conflict with
         the Planning Scheme:
         1.    Some sport and recreational uses are accepted in the Industry Zone given the
               potential impacts of sport and recreation uses; and
         2.    The fitness centre relies on a large floor area that can be facilitated in an Industry
               zone, unlike other zones where it would be difficult to locate.
    C.   Note the report is provided in accordance with Section 63(5) of the Planning Act 2016.


                                                                                       Page 7 of 17
Log in to download the original file

2019-04-18 Ordinary Meeting Minutes(PDF, 376KB).pdf · 385 KB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.