Unity Water Referral Response Approval Letter with Conditions - Received 24-07-2020 · OPW21/0118

of 2

Text shows just the words. Original shows the document exactly as it was published.

                                                                                                          Head Office:
                                                                                          Ground Floor, 33 King Street
                                                                                                 Caboolture QLD 4510
                                                                                                     Mailing Address:
                                                                                     PO Box 953, Caboolture QLD 4510
                                                                                         1300 0 UNITY (1300 086 489)
                                                                                                www.unitywater.com
                                                                                                      ABN: 89 791 717 472


          Our file ref: 812215722



          P. Amour
          C/- D. Grehan
          Pacific BCQ
          PO Box 1901 Noosaville 4566


          23 July 2020


          Dear Mr Amour,


          Concurrence Agency Referral Response – proposed building work to be undertaken near
          service provider infrastructure

          Property Address: 8 Arakoon Cres. Sunshine Beach
          Real Property Description: Lot 786 on RP48111
          Proposed Building Work: Dwelling and Garage
          Relevant Infrastructure: 50mm Pressure Sewerage connection, 25mm Water Service and 20mm
          Water Meter

          Thank you for referring the proposed building work to be undertaken on the property as mentioned
          above to Unitywater for a concurrence agency assessment. The assessment of the drawings and
          documents submitted have been conducted by Unitywater’s Development Officer, Tony Stokman.
          This concurrence agency referral response is issued under the provisions of the Planning Act 2016
          and as such shall be a component of the building development approval that is to be obtained and
          issued for the proposed building work.
          The proposed building work is to be undertaken in accordance with the conditions as listed below.
          CONDITIONS
          1. The owner accepts sole responsibility for and releases Unitywater, its employees, authorised
             agents and contractors in respect of all illness, injury, death and loss or damage of property which
             may be sustained by Unitywater’s infrastructure; as a result of the building work being undertaken
             near that infrastructure.

          2. The owner indemnifies and shall keep indemnified Unitywater against all actions, claims, suits,
             demands, losses, damages, costs and expenses of any kind, arising out of or incidental to the
             building work being undertaken near Unitywater’s infrastructure and any works carried out by
             Unitywater except to the extent caused by the negligence of Unitywater, its employees, authorised
             agents and contractors.

          3. The owner accepts responsibility, including costs, for any associated rectification works to
             Unitywater’s infrastructure that are required as a result of the proposed building works directly or
             indirectly impacting on the Unitywater asset.

          4. Where a footing system includes piles/piers to support the building work, they must not be impact
             driven
                                                                                                               Page 1 of 2




Revision No: 6                              Revised Date: 02/12/2019                         Next Review Date: 02/12/2021
Full text of the other 1 page

Page 2

           5. The building work is to be located and the footings/foundations to be constructed as detailed
              within the approved drawings listed below, which are to be integral to the building development
              approval issued by the building certifier for the work.

                                                     Approved Drawings

             Drawing Number
                                          Drawing Title                      Prepared by                   Date
             (Revision/Issue)
                 WD 100
                                            Site Plan                   Macchia Design Studio          21/05/2020
                 Rev. A

                 30115-S1             Footing and Slab Plan            SCG Consulting Engineers        June 2020

                 30115-S2             Footing & Slab details           SCG Consulting Engineers        June 2020
           NB – Approved Drawings are enclosed

           6. Any variation to the approved drawings will require a further referral to Unitywater for
              consideration prior to commencing the building work. Such amended proposals will be considered
              on their individual merits and may or may not be considered favourably.

           7. To ensure the design clearance is attained; the line of the infrastructure, including the sewer
              sewerage property connection point, must be accurately located on the property prior to
              commencing the building work. In the event the actual clearance is less than design clearance, a
              further referral to Unitywater is required and the resultant response shall be acted upon
              accordingly.

           REASONS FOR CONDITIONS

           The conditions as listed must attach to the building development approval so as to ensure there is
           no damage caused to the building works and the infrastructure, there is sufficient ventilation for
           individuals in close proximity to the infrastructure and adequate access for inspecting, maintaining
           or replacing the infrastructure is provided.

           Should you require any further information regarding this response, please contact Unitywater at
           [email protected] or alternatively telephone 1300 086489.

           Yours sincerely




           Mark Kettley
           Team Leader Development Works
           Development Services

           ENC        Approved Drawings




                                                                                                             Page 2 of 2




Revision No: 6                              Revised Date: 02/12/2019                        Next Review Date: 02/12/2021

Used in these records

About this file

File size
427 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Unity Water Referral Response Approval Letter with Conditions - Received 24-07-2020.pdf · 427 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.