Council archive · source document
Unity Water Referral Response Approval Letter with Conditions - Received 24-07-2020 · OPW21/0118
Head Office:
Ground Floor, 33 King Street
Caboolture QLD 4510
Mailing Address:
PO Box 953, Caboolture QLD 4510
1300 0 UNITY (1300 086 489)
www.unitywater.com
ABN: 89 791 717 472
Our file ref: 812215722
P. Amour
C/- D. Grehan
Pacific BCQ
PO Box 1901 Noosaville 4566
23 July 2020
Dear Mr Amour,
Concurrence Agency Referral Response – proposed building work to be undertaken near
service provider infrastructure
Property Address: 8 Arakoon Cres. Sunshine Beach
Real Property Description: Lot 786 on RP48111
Proposed Building Work: Dwelling and Garage
Relevant Infrastructure: 50mm Pressure Sewerage connection, 25mm Water Service and 20mm
Water Meter
Thank you for referring the proposed building work to be undertaken on the property as mentioned
above to Unitywater for a concurrence agency assessment. The assessment of the drawings and
documents submitted have been conducted by Unitywater’s Development Officer, Tony Stokman.
This concurrence agency referral response is issued under the provisions of the Planning Act 2016
and as such shall be a component of the building development approval that is to be obtained and
issued for the proposed building work.
The proposed building work is to be undertaken in accordance with the conditions as listed below.
CONDITIONS
1. The owner accepts sole responsibility for and releases Unitywater, its employees, authorised
agents and contractors in respect of all illness, injury, death and loss or damage of property which
may be sustained by Unitywater’s infrastructure; as a result of the building work being undertaken
near that infrastructure.
2. The owner indemnifies and shall keep indemnified Unitywater against all actions, claims, suits,
demands, losses, damages, costs and expenses of any kind, arising out of or incidental to the
building work being undertaken near Unitywater’s infrastructure and any works carried out by
Unitywater except to the extent caused by the negligence of Unitywater, its employees, authorised
agents and contractors.
3. The owner accepts responsibility, including costs, for any associated rectification works to
Unitywater’s infrastructure that are required as a result of the proposed building works directly or
indirectly impacting on the Unitywater asset.
4. Where a footing system includes piles/piers to support the building work, they must not be impact
driven
Page 1 of 2
Revision No: 6 Revised Date: 02/12/2019 Next Review Date: 02/12/2021
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalFull text of the other 1 page
Page 2
5. The building work is to be located and the footings/foundations to be constructed as detailed
within the approved drawings listed below, which are to be integral to the building development
approval issued by the building certifier for the work.
Approved Drawings
Drawing Number
Drawing Title Prepared by Date
(Revision/Issue)
WD 100
Site Plan Macchia Design Studio 21/05/2020
Rev. A
30115-S1 Footing and Slab Plan SCG Consulting Engineers June 2020
30115-S2 Footing & Slab details SCG Consulting Engineers June 2020
NB – Approved Drawings are enclosed
6. Any variation to the approved drawings will require a further referral to Unitywater for
consideration prior to commencing the building work. Such amended proposals will be considered
on their individual merits and may or may not be considered favourably.
7. To ensure the design clearance is attained; the line of the infrastructure, including the sewer
sewerage property connection point, must be accurately located on the property prior to
commencing the building work. In the event the actual clearance is less than design clearance, a
further referral to Unitywater is required and the resultant response shall be acted upon
accordingly.
REASONS FOR CONDITIONS
The conditions as listed must attach to the building development approval so as to ensure there is
no damage caused to the building works and the infrastructure, there is sufficient ventilation for
individuals in close proximity to the infrastructure and adequate access for inspecting, maintaining
or replacing the infrastructure is provided.
Should you require any further information regarding this response, please contact Unitywater at
[email protected] or alternatively telephone 1300 086489.
Yours sincerely
Mark Kettley
Team Leader Development Works
Development Services
ENC Approved Drawings
Page 2 of 2
Revision No: 6 Revised Date: 02/12/2019 Next Review Date: 02/12/2021
Used in these records
Unity Water Referral Response Approval Letter with Conditions - Received 24-07-2020.pdfRelated documentApplication case desk ↗
About this file
- File size
- 427 KB (small file)
- File type
No other editions are linked here.