Original source · versioned page text
Appendix 2 - Code Assessment
Water Quality and Drainage Code
Performance Outcomes and Acceptable Outcomes
Performance Outcomes Acceptable Outcomes Compliance
Stormwater drainage design
PO1 AO1 Compliant
The development and its stormwater management system is A stormwater management plan is prepared consistent The proposed development will maintain stormwater
planned and designed having regard to: with PSP6 Engineering Design Standards - Roads, management in line with the existing situation, in
a) the natural features of the site; drainage and earthworks. accordance with Council’s standards.
b) the need to avoid impacts and potential risks
to ecologically important areas;
c) the likely effectiveness of erosion and sediment control
and stormwater drainage measures during rainfall events
during and post construction; and
d) the need to protect environmental values and water
quality of receiving waters both during and post
construction.
PO2 AO2.1 Compliant
Stormwater drainage infrastructure is planned, designed and Stormwater drainage planning, design and construction is The proposed development will maintain a stormwater
constructed to: in accordance with PSP6 Engineering Design Standards - management system to achieve the existing lawful point of
a) incorporate allowance for increased flood risk and tidal Roads, drainage and earthworks and the latest version of discharge, being infrastructure within the village green
inundation through pipework as a result of climate change the Queensland Urban Drainage Design Manual. frontage, with no worsening of stormwater flows.
and sea level rise;
b) ensure the development is adequately drained; and AO2.2
c) ensure stormwater is managed and lawfully discharged The stormwater drainage system connects to a lawful
without altering stormwater drainage characteristics point of discharge in accordance with PSP6 Engineering
external to the site. Design Standards - Roads, drainage and earthworks.
AO2.3
Stormwater flows discharging from the development are
demonstrated to be consistent with pre-development
characteristics.
AO2.4
Development provides for the management of
stormwater to incorporate appropriate allowance for
climate change impacts (including rainfall intensity and
sea level rise), in accordance with PSP6 Engineering
Design Standards – Roads, Drainage and Earthworks.
Ref: 204099.T003 Page 1
214 David Low Way
PEREGIAN BEACH QLD 4573
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.