Appendix 2 - Code Assessment
PO3 AO3.1 Compliant
Stormwater drainage infrastructure conveys run-off in a Stormwater drainage infrastructure meets the desired Any stormwater infrastructure will be constructed in
manner that allows roads to deliver desired standards of standards of service for roads functionality set out accordance with Council’s standards.
service appropriate to the local conditions and local in PSP6 Engineering Design Standards - Roads, Drainage
stormwater drainage characteristics. and Earthworks.
PO4 AO4.1 Compliant
Stormwater infrastructure is compatible with existing The location, design and construction of stormwater Any stormwater infrastructure will be constructed in
infrastructure, allows for easy access for the ongoing drainage structures is in accordance with PSP6 accordance with Council’s standards.
maintenance by Council, is cost effective across its design Engineering Design Standards - Roads, drainage and
life. earthworks.
AO4.2
Where infrastructure is located on private land an
easement is dedicated over the infrastructure in
accordance with PSP6 Engineering Design Standards -
Roads, drainage and earthworks.
AO4.3
Any alterations or repairs to infrastructure as a result of
the development are made at no cost to Council.
AO4.4
Development avoids stormwater inflow and infiltration to
the sewer infrastructure network.
AO4.5
Stormwater infrastructure is designed to minimise
maintenance costs and the requirement for specialized
equipment for maintenance techniques.
PO5 AO5.1 Compliant
Stormwater drainage infrastructure is aligned to avoid Stormwater drainage infrastructure avoids crossing The subject site does not contain or adjoin waterways,
crossing waterways, wetlands, drainage lines and ecological waterways, wetlands drainage lines and ecologically wetlands, drainage lines or ecologically important areas.
important areas, or where it is demonstrated this is important areas or follows the edge of existing disturbed
unavoidable, disturbed areas are reinstated and revegetated areas.
upon completion of works.
AO5.2
Stormwater drainage infrastructure is co-located with
other infrastructure within a combined utility corridor
where appropriate.
AO5.3
Temporary vehicular crossings of waterways must be
Ref: 204099.T003 Page 2
214 David Low Way
PEREGIAN BEACH QLD 4573
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.