Appendix 2 - Code Assessment
PO8 AO8.1 Compliant
Water quality treatment infrastructure to be dedicated as Detailed life cycle costing is provided for the entire Where required, any stormwater quality treatment will be
public assets are proven to be suitable for its use and of a treatment train system including replacement costs of in accordance with best practice principles.
cost effective and efficient standard. asset parts.
AO8.2 Treatment systems dedicated as public assets are
designed to minimise maintenance, renewal and adaption
costs and the requirement for specialised equipment,
material or maintenance techniques.
AO8.3
Vegetated stormwater management systems to be
dedicated as public assets are established and maintained
during the maintenance period to ensure optimal
vegetated growth and that the functional elements of the
system achieve the design function at the end of the
maintenance period.
PO9 AO9.1 Compliant
Treatment systems are designed to eliminate or minimise Free draining inlets and outlets are provided to ensure The proposed development will ensure no ponding of
health, safety and aesthetic hazards, including risks that waters do not pond for more than 24 hours. stormwater and no retaining walls are required for water
associated with insect breeding, odour and public safety. quality treatment.
AO9.2
Developments are designed to eliminate retaining walls in
excess of 0.8m for any water quality treatment device.
Hydrology and waterway stability
PO10 AO10 Not Applicable
Development prevents increased bed and bank erosion and The development is designed to: The subject site does not contain or adjoin a waterway.
sedimentation in receiving waterways by avoiding changes a) limit the peak 1 year ARI event discharge within the
in low rate, peak flow run-off and flow duration. receiving waterway to the pre-development peak 1
year discharge;
b) maximise pervious areas by using pervious
alternatives for otherwise impervious areas wherever
possible;
c) provide for capture and reuse of stormwater for non-
potable purposes for gardening, toilet flushing,
laundry and hot water supply uses;
d) incorporate appropriate detention features; and
e) incorporate natural channel design principles
Editor’s note: The Sustainable Building Design
Code includes requirements for stormwater capture and
reuse.
Ref: 204099.T003 Page 4
214 David Low Way
PEREGIAN BEACH QLD 4573