Original source · versioned page text
Appendix 2 - Code Assessment
AO12.3
Benthic substrate retains a continuous grade with the
direction of flow consistent with the natural bed profile.
PO13 AO13.1 Compliant
Development is designed and constructed to maintain The location and form of stormwater discharge points do The proposed development will not alter the hydrology of
surface and ground water balances that sustain the not alter the pre-development hydrology of receiving receiving surface water or groundwater.
environmental values of water dependent ecosystems, surface water or groundwater.
including downstream aquatic, riparian, wetland and
terrestrial ecosystems. AO13.2
Developments located on groundwater recharge or
discharge areas are designed and managed in accordance
with a groundwater recharge and discharge management
plan prepared by a suitably experienced and qualified
groundwater hydrologist. The groundwater recharge or
discharge must demonstrate that the development does
not affect groundwater balances beyond the property
boundaries.
Editor's Note— PSP6 Engineering Design Standards -
Roads, drainage and earthworks provides guidance on
prepare a groundwater recharge and discharge plan.
Construction and establishment of stormwater management systems
PO14 AO14.1 Compliant
Construction methods provide for appropriate controls to An erosion and sediment control plan prepared in Appropriate erosion and sediment control will be employed
avoid entry and transport of litter, sediment, and associated accordance with the International Erosion Control during construction of the proposed development.
prescribed water contaminants into receiving waters. Association Best Practice Books demonstrates that the
capture and release of stormwater achieves the design
Editor's note— Water contaminants are prescribed in the objectives listed in Table A: Construction phase –
Environmental Protection Act 1994. stormwater management design objectives of the State
Planning Policy (Appendix 2).
Editor’s note— PSP6 Engineering Design Standards -
Roads, drainage and earthworks provides guidance on
requirements for preparing an Erosion Management Plan.
AO14.2
Construction works are designed and managed to restrict
the extent of clearing and soil exposure to the minimum
necessary for access, and safe construction at any one
time.
Ref: 204099.T003 Page 6
214 David Low Way
PEREGIAN BEACH QLD 4573
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.