Original source · versioned page text
Stormwater Management Plan (Quantity)
Attached to the e-mail Doonella Stage C (Email 6 of 7) Stormwater Management Plan - OPW14/0197.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawnOur Ref: B09182.W.01.MS.ip.Authorities.docx Contact: Andrew McPhail B - OW N Smart Consulting RPS Australia Asia Pacific C/- Brown Consulting (QLD) Pty Ltd PO Box 997 BUDDINA QLD 4575 17 April 2013 Attention: Sian Davis Deat Sian, Proposed Residential Development — Lake Doonella, Noosa Stage C Stormwater Management Plan (Quantity) Updated Management Strategy Brown Consulting (QLD) Pty Ltd have previously prepared a Flood Investigation & Stormwater Management Plan (Report No. B09182.W-02A dated October 2011) for Stockland Pty Ltd for the proposed Stage C Residential Development at Lake Doonella, Noosa. A hydrological analysis was previously undertaken to determine the change in peak flows from the ptoposed Doonella Subdivision and the mitigation provided by the proposed stormwater detention measures. Hydraulic modelling was also undertaken to determine post development flood levels to confirm proposed lot and road levels had appropriate flood immunity along the environmental corridor through the site. Since the submission of this report, Sunshine Coast Regional Council (SCRC) has indicated that the use of the environmental corridor for detention (referred to as the Dodonaea Close Detention Basin) outlined in the Stormwater Management Plan was not acceptable. Subsequent meetings with SCRC have led to the design change process. New peak flow management options have been proposed, with Option 3 deemed to be viable. This was indicated in an email from Senior Development Planner Dennis Wallace dated 30 March 2013 (refer to Attachment 1) in which it stated: Of the SWM options submitted, only Option 3 was a presented as viable and doesn’t appear to provide significant benefits over the original proposal in regard to soil hydrology and impacts of existing vegetation. On this basis, council would be willing to amend the approval(s) to allow for the originally proposed Dodonaea detention area, provided we can also do the following: © = Allow for fauna passage, including a fauna underpass; © Rehabilitate the fauna corridor area post construction disturbances and the changes to the soil hydrology and vegetation that will result from the detention area; © Obtain an Op Works revegetation/ rehabilitation approval for the above. This letter report presents the analysis and results for the new peak flow management strategy (Option 3) for the proposed residential subdivision as requested by Council. It is noted that post construction rehabilitation of the environmental corridor is outside the scope of this letter. Level 6, 199 Grey Street South Brisbane QLD 4101 Australia Brown Consulting (QLD) Pty Ltd 1 PO Box 10349 Adelaide Street Brisbane QLD 4000 Australia ABN 38 109 428 506 Telephone +61 7 3895 3444 Facsimile +61 7 3895 3400 brownconsulting.com.au
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLarge file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.