Original source · versioned page text
Stormwater Management Plan (Quantity)
Attached to the e-mail Doonella Stage C (Email 6 of 7) Stormwater Management Plan - OPW14/0197.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawnNew Peak Flow Management Strategy (Option 3) The Option 3 strategy to mitigated peak flow increase from the development involves incorporating changes to the configuration of the previously proposed Twigrush and Dodonaca Basins, with two new Detention Basins designated as Basins B1A and B1C. Changes to the T'wigrush Basin and provision of two new basins allows for the reconfiguration of the Dodonaea Basin outlet to incorporate a fauna crossing, with the objective to also reduce peak flood levels and times of inundation within this basin. The configuration of all the detention basins within the strategy to achieve the objectives is presented in Table 1 below. Note that for Option 3 Sub Catchment 2B2 now bypasses the Twigrush Basin. Refer to Drawing No. B09182.W-SK01B in Attachment 2 for the updated Stormwater Management Catchment Plan. Table 1: Option 3 Basin Configurations a Upstream Catchment BiA BIC C1,,C3, €2 aA, B1B Storage Volume (m+) 1,080 1,100 1,210 Detention Depth (m) 1.5! 1.8! 2.1! - chien Ae 9.3! 13! 7.6! 9 Basin Top RL (m. AHD) 10.8 14.8 9.7 12.25 Outlet Structure 1x 225 diaRCP | 1x 225diaRCP | 1x375mmdiaRCP | 1x 450mm dia RCP 1. A depth of 300mm is provided for bio-retention treatment below the detention bottom. The previous Watershed Bounded Network Model (WBNM) for the site has been updated to incorporate the Option 3 strategy. Assumptions and methodology are consistent with previous investigations and analysis for the site. Details of the updated developed sub-catchment areas and calculated fraction impervious values are presented in Table 2 below. Refer to Drawing No. B09182.W-SK01 IssueB for the location and delineation of each sub catchment area. Table 2: Developed Scenario Sub-Catchment Details Level 6, 199 Grey Street South Brisbane QLD 4101 Australia PO Box 10349 Adelaide Street Brisbane QLD 4000 Australia Telephone +61 7 3895 3444 Facsimile +61 7 3895 3400 Brown Consulting (QLD) Pty Ltd ABN 38 109 428 506 brownconsulting.com.au
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLarge file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.