Skip to the record
Search everything, all in one place.

Original source · versioned page text

Stormwater Management Plan (Quantity)

Attached to the e-mail Doonella Stage C (Email 6 of 7) Stormwater Management Plan - OPW14/0197.

of 8

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
New Peak Flow Management Strategy (Option 3)

The Option 3 strategy to mitigated peak flow increase from the development involves incorporating
changes to the configuration of the previously proposed Twigrush and Dodonaca Basins, with two new
Detention Basins designated as Basins B1A and B1C.

Changes to the T'wigrush Basin and provision of two new basins allows for the reconfiguration of the
Dodonaea Basin outlet to incorporate a fauna crossing, with the objective to also reduce peak flood
levels and times of inundation within this basin.

The configuration of all the detention basins within the strategy to achieve the objectives is presented
in Table 1 below. Note that for Option 3 Sub Catchment 2B2 now bypasses the Twigrush Basin. Refer
to Drawing No. B09182.W-SK01B in Attachment 2 for the updated Stormwater Management
Catchment Plan.

 

Table 1: Option 3 Basin Configurations

 

 

 

 

 

 

 

 

 

a
Upstream Catchment BiA BIC C1,,C3, €2 aA, B1B
Storage Volume (m+) 1,080 1,100 1,210
Detention Depth (m) 1.5! 1.8! 2.1! -
chien Ae 9.3! 13! 7.6! 9
Basin Top RL (m. AHD) 10.8 14.8 9.7 12.25
Outlet Structure 1x 225 diaRCP | 1x 225diaRCP | 1x375mmdiaRCP | 1x 450mm dia RCP

 

 

 

 

 

 

1. A depth of 300mm is provided for bio-retention treatment below the detention bottom.

The previous Watershed Bounded Network Model (WBNM) for the site has been updated to
incorporate the Option 3 strategy. Assumptions and methodology are consistent with previous
investigations and analysis for the site. Details of the updated developed sub-catchment areas and
calculated fraction impervious values are presented in Table 2 below. Refer to Drawing
No. B09182.W-SK01 IssueB for the location and delineation of each sub catchment area.

Table 2: Developed Scenario Sub-Catchment Details

 

Level 6, 199 Grey Street South Brisbane QLD 4101 Australia
PO Box 10349 Adelaide Street Brisbane QLD 4000 Australia
Telephone +61 7 3895 3444 Facsimile +61 7 3895 3400

Brown Consulting (QLD) Pty Ltd
ABN 38 109 428 506
brownconsulting.com.au
Log in to download the original file

Stormwater Management Plan (Quantity).pdf · 4.5 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.