Stormwater Management Plan (Quantity)
Attached to the e-mail Doonella Stage C (Email 6 of 7) Stormwater Management Plan - OPW14/0197.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawn
Results
The results of the analysis indicate that the new and reconfigured detention basins and outlet structures
achieve the non-worsening objective. There is now a decrease in peak flows for an 100 Year ARI event
of 5%. Peak flow results are shown in Table 3 below.
Table 3: Existing and Mitigated (Option 3) Peak Flows
The Water Surface Levels (WSL’s) for each basin have also been considered (refer to Table 4 below).
Basin B1A, B1C and the Twigrush Basin are consistent with freeboard requirements. Depth of flow
across the overflow weirs are also less than 300mm during the Peak 100 year ARI event.
Table 4: Option 3 Basin WSL’s
“Dodonaea Basin —
evious Peak | OPTION3
* WSL =) | Peak WSL |
* (nm. AHD) ~~ | (m.AHD) |
10.81 9.79
5 11.32 10.25
10 11.59 10.47
20 11.90 10.75
50 12.04 10.99
100 12.11 11.21 -0.90 8.89 10.30 14.32
Freeboard to top of Basin (m) 0.81 0.50 0.48
For the Dodonaea Basin results indicate that there is a dectease in peak WSL’s compared to that
specified in the previous report. Results are presented in the Table 4 above. Significant reductions in
the detention volume and the WSL between the previous strategy and Option 3 have been provided.
The resulting changes in volume in the Dodonaea basin are presented in Table 5 below.
Table 5: Dodonaea Basin Ch: in Volume
480 50 -430
950 170 -780
1,300 270 -1,030
1,810 430 -1,380
2,070 620 -1,450
100 830 -1,380
The peak 100 year ARI WSL in the Dodonaea Basin (11.21m. AHD) will also ensure the fauna passage
will remain flood free during this event. A reduction in the time for the basin to drain has also been
demonstrated. It takes Dodonaea Basin 30 minutes less to empty during a 100 year ARI event then
previously determined.
Level 6, 199 Grey Street South Brisbane QLD 4101 Australia Brown Consulting (QLD) Pty Ltd 3
PO Box 10349 Adelaide Street Brisbane QLD 4000 Australia ABN 38 109 428 506
Telephone +61 7 3895 3444 Facsimile +61 7 3895 3400 brownconsulting.com.au
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLarge file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.