Skip to the record
Noosa's #1 Council Tracker.

Original source · versioned page text

2014-03-25 Planning & Organisation Committee Agenda Pages 15-38

of 24

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA   25 MARCH 2014


                                                   ATTACHMENT 2




                                                    Page 28 of 231

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                         25 MARCH 2014

                                                                         ATTACHMENT 2
 Town Planning Dept.                                                                   ae:

     RW.jh TPC 1899
            (132)

                                                         21st July, 1987

     John W. Shepperson,                              ,          .
     c/~- Post Office,
     KIN KIN." 0. 4571

     Dear Sir,
     Re:   TPC 1899   -  Extractive industry - Portion 259, Murrays Road, Via Kin
           Kin
     Your   application  was  considered   by Council at its meeting on 21st July,
      1987.

     Council   resolved  to  approve   your  application subject to the conditions
      listed below:-

      1.   Prior  to  the  commencement   of  operations on the site the applicant
           shall  carry  out the following external roadworks to the satisfaction
           of the Shire Engineer:-

           (i)  Upgrade  the   intersection  of Sheppersons Lane and Kin Kin Road..
                These works are also to be carried out to the requirements of the
                Main Roads Department.
           (ii) Bitumen  surfacing   of  0.5  kilometres of carriageway past Agney.
         :      Farn..

           (iii )Upgrade the existing timber bridge within Sheppersons Lane.
           {iv) Widen  and upgrade approximately one (1) kilometre of Sheppersons
                Lane,  comprising   the  balance area   of gravel pavement, to the
                access point to the site.
                                                                .                 .   a
           The  design of the above works shall be prepared by a Registered Civil     _
           Engineer  and   shall’ be  submitted to the Shire Engineer for approval
           prior  to commencement of construction.    The Registered Civil Engineer
           shall  certify that the works have been constructed in accordance with     .
          _the approved plans.
           In. lieu   of  the  above works,   Council may accept a contribution of
           $150,000 with the works then to be carried out by Council.

                                                                           Page 28 of 231
Log in to download the original file

2014-03-25 Planning & Organisation Committee Agenda Pages 15-38(PDF, 4MB).pdf · 4.0 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.