Skip to the record
Accept no substitutions.

Original source · versioned page text

2014-03-25 Planning & Organisation Committee Agenda Pages 15-38

of 24

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA   25 MARCH 2014




                                                    Page 29 of 231

PLANNING &                      OMMITTEE MEETING AGEN
             ORGANISATION C                                DA            25 MARCH 2014
          enepperson = TPC 1899 _ 23rd July, 1987 _ Page 2
       2.   Detailed  management plans are to be submitted to Council for approval
            by   the   Shire    Engineer   and   Shire  Planner   following   further
            investigation by the @pplicant,.  Such Management Plans shall address:_
            (i)  the location of siltation Ponds ;
           (ii) the extent of Proposed excavations;
           (iii)the Proposed access locations;
           (iv) the Proposed location of the grave, crusher ang site office;        :
          (v)  Provision of buffer areas to adjoining Property boundaries;
          (vi) the location of the area Proposed to be leasea to Council; and
)         (vii )rehabilitation Procedures,       ,
         No construction or excavation works ere to be commenced, without prior
         4Ppproval  of  the Shire Engineer, until such times as management Plans
         are  approved.     Council  reserves   the  right  to  expand   upon  the
         conditions   contained  within  this   4pproval  following Submission of
         detailed Management Plans.
    3.   Performance  of  regular   maintenance  of roadworks within Shepparsons
         Lane,  including  the  removal   of  any  materials which may fall from
        vehicles transporting Quarry materials.
   %    As  offered,   the applicant shall enter into an agreement with Council
        for  a  long   term  registered  lease  Over   the area to be negotiated
     *~ between the @pplicant and the Shire Engineer,
  is    Such  lease  is  to  ensure   the  long term availability to Council of
        Suitable ‘Material.   The 4pplicant shal] agree to SUPPly material for
i       Council's  need  at  the cost of Production Plus a fair Profit for the
)      4pplicant.
      The   leaseq   area is to be made available, at ‘no cost to Council, with
       Council  to bear the cost of ali legal and Survey fees associated with
       the transfer.
 5.    The  4pplicant  shall  revegetate   the  quarry  in Stages as quarrying
      operations   Proceed,    The  species   cf  plants  to  be used shall be
      acceptable to Council.                                     ;
 6.   The  quarry is to’ be operated in accordance with the Provisions of the .
      Town Planning Scheme, Bylaws, Policies and Acts,
Ve    All  blasting  operations   shall be conducted such that stone, rock or
     Other materials are not ejected from the Site.

                                                                          Page 29 of 231
Log in to download the original file

2014-03-25 Planning & Organisation Committee Agenda Pages 15-38(PDF, 4MB).pdf · 4.0 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.