Original source · versioned page text
2014-03-25 Planning & Organisation Committee Agenda Pages 15-38
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
PLANNING & ORGANISATION COMMITTEE MEETING AGENDA 25 MARCH 2014
Page 29 of 231
PLANNING & OMMITTEE MEETING AGEN
ORGANISATION C DA 25 MARCH 2014
enepperson = TPC 1899 _ 23rd July, 1987 _ Page 2
2. Detailed management plans are to be submitted to Council for approval
by the Shire Engineer and Shire Planner following further
investigation by the @pplicant,. Such Management Plans shall address:_
(i) the location of siltation Ponds ;
(ii) the extent of Proposed excavations;
(iii)the Proposed access locations;
(iv) the Proposed location of the grave, crusher ang site office; :
(v) Provision of buffer areas to adjoining Property boundaries;
(vi) the location of the area Proposed to be leasea to Council; and
) (vii )rehabilitation Procedures, ,
No construction or excavation works ere to be commenced, without prior
4Ppproval of the Shire Engineer, until such times as management Plans
are approved. Council reserves the right to expand upon the
conditions contained within this 4pproval following Submission of
detailed Management Plans.
3. Performance of regular maintenance of roadworks within Shepparsons
Lane, including the removal of any materials which may fall from
vehicles transporting Quarry materials.
% As offered, the applicant shall enter into an agreement with Council
for a long term registered lease Over the area to be negotiated
*~ between the @pplicant and the Shire Engineer,
is Such lease is to ensure the long term availability to Council of
Suitable ‘Material. The 4pplicant shal] agree to SUPPly material for
i Council's need at the cost of Production Plus a fair Profit for the
) 4pplicant.
The leaseq area is to be made available, at ‘no cost to Council, with
Council to bear the cost of ali legal and Survey fees associated with
the transfer.
5. The 4pplicant shall revegetate the quarry in Stages as quarrying
operations Proceed, The species cf plants to be used shall be
acceptable to Council. ;
6. The quarry is to’ be operated in accordance with the Provisions of the .
Town Planning Scheme, Bylaws, Policies and Acts,
Ve All blasting operations shall be conducted such that stone, rock or
Other materials are not ejected from the Site.
Page 29 of 231See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.